@@AccountingLectures It's on the class WhatsApp group now 💯😄 they said thank you 💫
@ndapunikwapaulus78953 жыл бұрын
@@neluthecurious8389 and we are here😅😅
@neluthecurious83893 жыл бұрын
@@ndapunikwapaulus7895 I see you Punny 👋😂
@HuyNguyen-vg5wz3 жыл бұрын
Absorption is for short-run so variable costing is for what?
@AccountingLectures3 жыл бұрын
Absorption cost is long run and Variables is short run. did I misspoke?
@ntcuong01ct1 Жыл бұрын
Dear Friends, I have a question: 1/ In the absorption costing system, I think the difference between Absorbed cost and full costing. Absored cost = direct material + direct labor + variable overhead manufacturing + fixed overhead manufacturing for a product or a brand or a product line. full cost= Absored cost + all corporate-related expenses for all product or all brand or all product line. Could you help?. Thank you.