It's wonderful to see you back! Keep up the amazing work, both on the home and on the channel! You were missed.
@AdventurousWay11 ай бұрын
Thank you so much!
@nproctor7411 ай бұрын
Glad to see yall back!
@AdventurousWay11 ай бұрын
Thank you!
@sasquatch88511 ай бұрын
Excellent as usual.👍🏻
@AdventurousWay11 ай бұрын
Thank you!
@TheFiremanJoe11 ай бұрын
I was just saying to myself that I hadn’t seen your videos lately. And here you are…
@AdventurousWay11 ай бұрын
Thanks for watching and coming back!
@suemoore196511 ай бұрын
❤️❤️🧡🧡💛💛💚💚💙💙💜💜 LIKED & SUBSCRIBED AS ALWAYS I love how you both advance your knowledge with classes & tools ❤️❤️🧡🧡💛💛💚💚💙💙💜💜
@AdventurousWay11 ай бұрын
We love learning! That's how we are able to accomplish projects like this with no experience.
@Windswept-q9i11 ай бұрын
Hey Diana, have you ever calculated how many calories you are burning in a day?? SO much physical work! Glad to see you again.
@AdventurousWay11 ай бұрын
Haha, I haven't! But my watch counts steps and sometimes I get 20k steps a day on work days!
@OutdoorTraveler11 ай бұрын
It's interesting, my septic engineer didn't require I do foam and I'm way above frost depth from house to septic and septic to leach field. My slope is very steep from the tank to the field though. Yours looks shallow I'm guessing that's the difference?
@AdventurousWay11 ай бұрын
That is interesting. Yes, our slope makes the required drop for a septic pipe, but otherwise it is not steep. That could be the difference. Another reason could be whether the snow on top of it will be plowed or not as snow does provide insulation too. Ours is under driveway so it will be clear of snow at all times.
@TicTacdoe11 ай бұрын
It seems to me that you guys have been doing a septic system for almost four years, does that sound right?
@TicTacdoe11 ай бұрын
At least it seems like 4 years!
@AdventurousWay11 ай бұрын
We cleared the trees for the leach fields in May 2022. The leach field and tanks went in September-October 2022. The system stayed like that until we added this pipe extension in October 2023. Doing everything ourselves, things take time. And they don’t always happen linearly. Sometimes we have to do a bit of one project, then move onto something else before coming back to the first project. There’ll be more septic work in future when we have to plumb in the utility building and house too.