Work of VIP and Chinar Park station is ridiculously slow and pathetic. This line is not gonna fully commission before 2027.
@abhijitghosh10825 ай бұрын
I feel 2029. Before next general election
@manatoshgita5 ай бұрын
2029 Are you serious? I think 2034
@samitchattopadhyay34805 ай бұрын
Small mistake Typographical error 2127
@nakshsinghania93425 ай бұрын
Think Positive Early 2026
@676275 ай бұрын
It will be not possible in our lifetime.
@pallabbagchi20065 ай бұрын
Awesome Video Adri Da❤ And welcome back❤
@ManishSingha-i5s5 ай бұрын
Really dont understand why there is zero progress in Technopolis, Chinar park and VIP Road metro. Seeing this half constructed pillars for months.
@sudiptadas1015 ай бұрын
High strength concrete need time to cure after every pore.. you need to give it 30 to 45 days to cure after every pore
@Ayush_Nayak15 ай бұрын
KM works under IR hence slow
@sarvodaydutta19055 ай бұрын
@@Ayush_Nayak1 state government provides zero assistance in terms of capital and land, hence, slow progress.
@Soumyajit1924 ай бұрын
It's the fault of state government. They provide no assistance that's why it's progressing so slowly@@Ayush_Nayak1
@UmaSarkar-l3r5 ай бұрын
Yes we need this type of update❤❤ nice update❤
@samikghosh16053 ай бұрын
I used to live near Akansha More from 2013-2015. Hardly any update and always traffic. Left the city for good and so glad I took that decision.
@mdferoz13292 ай бұрын
Plz left the planet also😅😅😂😂
@farnathmurmu34975 ай бұрын
Good that MRB is back
@EXPLOREWITHSHANTANU5 ай бұрын
Big fan 😊
@robb20244 ай бұрын
Kolkata city infrastructures development and its metro networks construction works are so sluggish. Its a dead city due to party and politics and carelessness and marxism. Being a Kolkatan I left my city 11 years ago. I have been seeing Kolkata metro networks construction progress for last 35 years. Its too slow. It will never be completed even after 25 years I will become 60 years then also nothing much will happen. This city hasnt been expanded area wise like Delhi or Mumbai or Bangalore. This city’s lifestyle and traffic systems are too slow and backward. This city cant compete with other Indian metro cities. I have pledged myself that I will never come back to Kolkata until all metro projects are completed and this city has been changed a lot. This city needs to expand and make it bigger.
@UmaSarkar-l3rАй бұрын
DDC - Jessore road trial today.. Please cover this trial run
@rangeetganguly60103 ай бұрын
Mumbai Metro Line-3 first phase now operational. But why no video on it?
@differentvideos5855 ай бұрын
But, what about your voice... we re missing your voice
@soumyajitmazumdar1855 ай бұрын
We miss your old presentation, now your videos are getting ridiculous with no voice over and same old nakamo music, which nowadays every youtuber used.
@Proudtobeanindian-e7d3 ай бұрын
Very slow working
@akhildas29045 ай бұрын
5-6 years more. RBNL means Tortoise speed.😂😂😂😂
@sksuhaib20045 ай бұрын
Abhi vi 10 saal 😂
@nakshsinghania93425 ай бұрын
When will Episode 3 of Dum Dum Cantonment will come??
@TirtharajPati5 ай бұрын
Not gonna finish even in next 5 years
@anupamdutta74515 ай бұрын
Another bihari
@chuckoffcampus97385 ай бұрын
The sky in Kolkata looks beautiful today. The City Centre 2 station is two or three blocks past the shopping mall?
@ObitoUchiha100895 ай бұрын
True. The mall is midway between chinar park metro station and CC2 Metro station.
@gourav-basu69655 ай бұрын
Ei 2 to station 3 year e sesh korar kotha chilo na? 😅 3 year hote chollo tender er, ekhno toh station construction i suru hoini 😂
@moloyadhikary78365 ай бұрын
Please Update on the Chingrihata crossing area
@CricketEditxwithTushar5 ай бұрын
West Bengal is one of the worst state where each and every projects were delayed ??? 😭😔
@anupamdutta74515 ай бұрын
Biharis commenting like king
@CricketEditxwithTushar5 ай бұрын
@@anupamdutta7451 Why u want to create a gap between Biharis and Bengali ?? Please look at west Bengal how far the are slow in economy as compared to west Bengal
@sandeepshah1055 ай бұрын
@@anupamdutta7451Bongs are lazy, latargic, communist thinking who know only to do hartals, bandhs, lockjam etc. Every Bengali now roams all around India looking for jobs, even house helps can't find work in Waste Bengal.
@ss-4165 ай бұрын
@@anupamdutta7451even dhaka is better than kolkata
@Soumyajit1924 ай бұрын
@@anupamdutta7451Biharis are indian just like us so why so much hate?
@RKBRIO5 ай бұрын
Please, do mention the BGM used in this video shot
@swastikbanerjee24305 ай бұрын
What is the name of the music at 2:16? Please tell me. ❤🙏🏻
@sgcreation57075 ай бұрын
Dada bolchi Esplanade theke city centre metro ki chalu hyeche na akono kaj cholche
@erwinrommel91375 ай бұрын
Please change the music Its same
@deepsengupta1965 ай бұрын
GARIA theke sector V connect hyejabe mnehocche ei sob hoteh akhno onek deri..
@Prajna_Paramita.3 ай бұрын
Hya 2026 election er aage Ruby to sector V operational hoye jabe I think...Beleghata obdi 2025 ae
@dancebyasmita54244 ай бұрын
Seriously sob lok tmc k vote dau. Kam Jodi hoga😅
@saptarsh15 ай бұрын
1 thing constant about kolkata metro is updates, although we know it'll never be a completed project😂 it's almost like mirage in a desert. It's literally taking more time than the man who built a road by cutting a mountain using an axle😂 kolkata Government and it's fake dreams😂
@sanjay597414 ай бұрын
Kolkata Metro is being built by Central Government i.e. Indian Railways.
@saptarsh14 ай бұрын
@@sanjay59741 yeah and the hurdles with land acquisition & implementation by State Govt, oh wait I mean Corrupt State Govt.
@joymalyabiswas28525 ай бұрын
Inse na ho payega
@thenilayrajshow28885 ай бұрын
Aur do TMC ko vote 😂
@asifseraj92875 ай бұрын
It's a Central govt project😂
@nishantkumar35235 ай бұрын
@@asifseraj9287 blocked by TMC due to Mamata Bano's power politics😂😂
@asifseraj92875 ай бұрын
@@nishantkumar3523 How can a Central project be blocked? Provide evidence here 💀
@akashchopra92205 ай бұрын
@@asifseraj9287 the same way schemes like ayushman bharat have been blocked
@asifseraj92875 ай бұрын
@@akashchopra9220 That doesnt prove anything. Bengal has Swastha Sathi so... Prove to the world that Central Metro Projects are blocked by Mamata
@kaustavchatterjee41585 ай бұрын
What update? There's zero progress 😂😂😂
@swarupbhc4 ай бұрын
Mamata hatao, Bengal bachao
@ss-4165 ай бұрын
west bengal only has kolkata metro but up has noida metro ghaziabad metro meerut metro kanpur metro agra metro lucknow metro delhi rapidx
@sayanmajumdar13605 ай бұрын
@mrb 2:35 - wrong info.. i guess hidco has scraped the flyover plan.. else we could have a double decker flyover there.. now they are doing feasibility study for under pass including one at nawabpur crossing, Westin and 7 rotary (total 4)
@ThatIndianRailBoy5 ай бұрын
Underpasses are proposed at Chinar Park, Crossing near Smart Cafe linking Silicon Valley nd Derozio College, Rajarhat road nd Westin on Jatragachhi road. There were only 4 underpasses proposed in Newtown area as of now nd one of them has Alrdy came up at Biswa Bangla Gate. So remaining 3 will be done..
@ayushghosh11555 ай бұрын
Yes, it now has been replaced by an underpass plan
@subhrendumazumdar5103 ай бұрын
Sector5 to eco park metro update and extension and work in progess and video
@piyushtekade39155 ай бұрын
In west bengal, remove the tmc and Congress party and indi alliance parties and bring the bjp govt and nda parties and then do development work there.