I’m lead to believe the first operator doesn’t know what he is doing.
@michaelmccarthy46157 жыл бұрын
Very cool Machine.... except damaging the concrete bridge starting at 1:47. That's not cool.
@buddyryeSE3 жыл бұрын
Drypack is cheap
@michaelmccarthy46153 жыл бұрын
Labor is never cheap...
@refillid7 жыл бұрын
I really like the music in this video. Can you tell me who wrote/produced it?
@metapatriot Жыл бұрын
As an equipment operator I can tell you from a productive standpoint (actual tasks achieved)the first example took a chunk out of that bridge and could have been achieved with an excavator with a long stick . Second example needed a bigger bucket. Third didn't achieve any meaningful task and the stunts could have been achieved with a track machine. And the last example didn't really need to climb the wall to do the small amount of grading that could have been done with a skidsteer.
@nandodenandos69572 жыл бұрын
At min 2:00 the machine broke the concrete of the bridge, damaging assets while operating is far from good!! You need to improve your design for safety and quality. Not recommended!
@aldylistyochanel2141 Жыл бұрын
good
@kusnan78292 жыл бұрын
Unit eksapator spider itu bharganya brp bos
@lp12nos203 жыл бұрын
Jesus that first guy should never operate one again... stuck between not sure what the hell to do and alright I'll go for it
@utpaldatta93217 жыл бұрын
Very cool Machine.
@bryankellsey76325 жыл бұрын
Rotating cuff and boom... I'm seeing application
@MG-nz6bx7 жыл бұрын
seems pretty impractical and inferior to a tracked machine to me. i mean it's a freaking excavator... it takes 2 minutes to build yourself a ledge to work from and 2 minutes to fill it back in when you're done.
@mrmolasses53667 жыл бұрын
that what i was thinking
@Zambonick2 жыл бұрын
The video emphasizes the site-work, but It's *getting to* the site that's a key advantage over tracked machines. The steep pitches and sideslopes these machines operate on would tip a tracked ex, even with the arm extended fully upslope to counterbalance. It's not time-effective, practical, or acceptable to build a series of ledges for 1/4 mile to access a work site, then tear them down on your way out. That's basically building a road so you can go dig a hole. Also, although the first operator does this no justice, it's possible to 'tiptoe' around (and between) infrastructure.
@Alastorm82 жыл бұрын
Typically used for railway embankment work over in the UK, love the tracked machines but sometimes there are angles you just can't work at safely, these machines are fantastic especially when kitted with tiltrotators.
@organicvids Жыл бұрын
This would b great with mulcher on steep slopes
@bryankellsey76325 жыл бұрын
I want that machine .. can it be equipped to supply Bigg building ... Supply?
@bryankellsey76325 жыл бұрын
I run tree chopping excavator too
@stephenhansen89067 жыл бұрын
I have seen track machine get into weirder places then this they just build areas with there bucket so the can move there
@lp12nos203 жыл бұрын
Stephen Hansen up the side of a mountain?
@janicewinnop68803 жыл бұрын
I operate a kaiser spider and I'm telling you a tracked machine can not go were these machines do. Before this machine I was operating tracked machines for 17 years. Again tracked machines could never go were these go. Not in a million years
@jantelowАй бұрын
music music music
@bryankellsey76325 жыл бұрын
The arborists
@bryankellsey76325 жыл бұрын
LMAO a telehandler that knows how to run an excavator
@salvenezia18172 жыл бұрын
The music is horrific
@porko8823 жыл бұрын
Pretty impressive but can it make love to a woman?
@Alastorm82 жыл бұрын
Considering how much these things cost to hire it must do, it would make breakfast too, covered in gold leaf.
@jacobkotsyuba79687 жыл бұрын
You
@183charlesspiva7 жыл бұрын
The music , like most SUCKS!!!!!!!
@buddyryeSE3 жыл бұрын
thank all the copyright a-holes that will shut down the video otherwise...