No video

Amount of Cement and Sand needed during Plastering Walls/Estimation and Costing Building Materials

  Рет қаралды 5,553

Easy QS

Easy QS

Күн бұрын

/ @easyqs
Reach me on email naomi.kangangi@gmail.com for the following services;
1.Tutoring services on quantity surveying
2.B.Q preparations and Material estimates for your project
Follow me on my pages
Facebook / naomi.kangangi.3
Instagram / easy_qs
#buildingmaterials #cement #estimationandcosting #quantitysurveyor #civilengineering #civilengineer #concrete #howtocalculate_price #civilsite #civilsitevisit

Пікірлер: 34
@PRESIDENTKINTUJONATHAN
@PRESIDENTKINTUJONATHAN 11 күн бұрын
This was great
@eliaskotopo1870
@eliaskotopo1870 4 ай бұрын
Have to be honest with you sis You gave really helped me on taking off,, I just prefer more this videos where you write on the board that the other ones because sometimes am un able to follow you using the point and I think you forget to point everything while in a videos like this its always like in class Thank you so much sis God bless you you have really helped
@DaltonRwabyomaAkanyijuka
@DaltonRwabyomaAkanyijuka 3 ай бұрын
Built up contrac all in unit rates plain cast in situ concrete in ratio of 1:3:6 with 20mm aggregates in a foundation by hand mixing given the information below, density of cement and sand and aggregates are 1400kg/m³,1500kg/m³ and 1600 kg/m³ respectively, labour for hand mixing per m³,5 hrs. Transport ,placing and compaction per m³ 2.5 hours. labo hourly 2000shs per hour.wastage 5%.contingency 5%.profits and over heads 25%.Cement 30000shs per bag.Unloading cement 500shs per bag.sand 80000shs per tonne.Aggregates 250000shs per tonne.shrinkage 40%.All materials are as per delivery to site.
@josephlokitela9070
@josephlokitela9070 10 ай бұрын
very intresting ,wonderful explanations
@semiloreakinnawonu2048
@semiloreakinnawonu2048 Ай бұрын
Great job Sis, The Volume of sand as calculated at 0.3888*4/5 should be equal to 0.311104. Please reconfirm this. Well done. More knowkedge
@georgerether79
@georgerether79 Ай бұрын
0.3888 should not be used since it's the density of cement not mortar. Instead use 1.944
@georgerether79
@georgerether79 Ай бұрын
The density of mortar used for sand is different from that used for cement
@agabakanie6426
@agabakanie6426 9 ай бұрын
Thank you so much this lesson is the best, be blessed.
@easyqs
@easyqs 9 ай бұрын
You are very welcome.More content is coming.Kindly keep tuned.
@PRESIDENTKINTUJONATHAN
@PRESIDENTKINTUJONATHAN 11 күн бұрын
Can someone leave this channel before subscribing, its impossible
@amoskinyaba6114
@amoskinyaba6114 4 ай бұрын
Sorry madam 1.35 ,I do not understand where you get it , please help me
@Civil5292
@Civil5292 7 ай бұрын
Thank you so much
@easyqs
@easyqs 6 ай бұрын
You're most welcome
@simonjojo8770
@simonjojo8770 11 ай бұрын
Great lecturer Naomi
@easyqs
@easyqs 11 ай бұрын
Glad it was helpful!
@kimeudennis8464
@kimeudennis8464 Жыл бұрын
Nice content esp one about fillings joints and depressions Secondly on finding dry volume But i think to find wall area we first calculate the girth then multiply by height I think it was incomplete,you didn't proceed to find the cost in either m2 or the whole area 100m2 What about labour ,profit For water we all know its costed in the prelims Anyway i like you videos good job
@easyqs
@easyqs Жыл бұрын
This video was about material cost alone.Not unit rate.In unit rate,thats where we consider labour costs and overhead and profit.Here we wanted just to know the material cost of an area of say 100m2
@agabakanie6426
@agabakanie6426 9 ай бұрын
@@easyqsthank you but you can help me in building unit rate.
@easyqs
@easyqs 9 ай бұрын
@@agabakanie6426 yes I can.. kindly reach out to me via my email naomi.kangangi@gmail.com
@LloydWaihenya
@LloydWaihenya 9 ай бұрын
Thankyou so much
@easyqs
@easyqs 9 ай бұрын
You are so welcome!
@LloydWaihenya
@LloydWaihenya 9 ай бұрын
Im a Qs as well graduated 2012 UoN!@@easyqs
@muriithikiragu2932
@muriithikiragu2932 Жыл бұрын
Great good job
@easyqs
@easyqs Жыл бұрын
Thanks so much
@alkay7038
@alkay7038 Жыл бұрын
Very smart lady❤
@easyqs
@easyqs Жыл бұрын
Thanks so much!
@miketracker4636
@miketracker4636 23 күн бұрын
I have a question
@njoshdan7921
@njoshdan7921 Жыл бұрын
Can you do estimation for painting plz
@user-xc1yk8bi1l
@user-xc1yk8bi1l Ай бұрын
(L+b)ft/350 x no of coats and spreadablilty
@user-mp2vy5uc9t
@user-mp2vy5uc9t 4 ай бұрын
Why use 0.388 as dry volume of sand???
@tomjuma8053
@tomjuma8053 3 ай бұрын
Should 1.94
@hillaryowinomayende4084
@hillaryowinomayende4084 Жыл бұрын
Can you do for -Paint. -Block.
@easyqs
@easyqs Жыл бұрын
Material calculation?
@DaltonRwabyomaAkanyijuka
@DaltonRwabyomaAkanyijuka 3 ай бұрын
Built up contrac all in unit rates plain cast in situ concrete in ratio of 1:3:6 with 20mm aggregates in a foundation by hand mixing given the information below, density of cement and sand and aggregates are 1400kg/m³,1500kg/m³ and 1600 kg/m³ respectively, labour for hand mixing per m³,5 hrs. Transport ,placing and compaction per m³ 2.5 hours. labo hourly 2000shs per hour.wastage 5%.contingency 5%.profits and over heads 25%.Cement 30000shs per bag.Unloading cement 500shs per bag.sand 80000shs per tonne.Aggregates 250000shs per tonne.shrinkage 40%.All materials are as per delivery to site.some help madam thanks
Retaining Walls Explained | Types, Forces, Failure and Reinforcement
10:24
Structures Explained
Рет қаралды 904 М.
Cute kitty gadgets 💛
00:24
TheSoul Music Family
Рет қаралды 17 МЛН
Or is Harriet Quinn good? #cosplay#joker #Harriet Quinn
00:20
佐助与鸣人
Рет қаралды 12 МЛН
Construction Estimating - Civil: Part 1
1:59:07
Dan Seydel, Creator of EIW Contractor University
Рет қаралды 28 М.
Cute kitty gadgets 💛
00:24
TheSoul Music Family
Рет қаралды 17 МЛН