Рет қаралды 10,788
Welcome aboard Amtrak Pacific Surfliner Train #564, the weekday train from Los Angeles, CA to San Diego, CA! Our train today is led by a newly-built Siemens SC-44 "Charger" locomotive with a Sufliner Cabcar trailing on the rear. Our stops along the journey will be Fullerton, Anaheim, Santa Ana, Irvine, San Juan Capistrano, Oceanside, Solana Beach, and Old Town.
Amtrak's Pacific Surfliner route is one of the most scenic train routes in the country, offering unprecedented views of the Pacific Coast, especially around the San Diego Metro area. The Pacific Surfliner is Amtrak's busiest route outside of the Northeastern United States, surpassed in ridership by only the Acela Express and Northeast Regional services. The route is also one of the faster routes in Amtrak's network, with speed limits as high as 90 MPH on some sections of track. As a result, the Pacific Surfliner falls into the category of higher-speed rail, meaning that speeds greater than 79 MPH are achieved. While most Pacific Surfliner trains run between San Diego and Los Angeles, a few continue further north and terminate at either Goleta or San Luis Obispo.
Track ownership varies among different points of the route. From Union Station to Fullerton the trackage is owned by the BNSF Railway. From Fullerton to the Orange County-San Diego county line, the trackage is owned by Metrolink, the commuter rail agency for the Greater Los Angeles area. From the Orange County-San Diego county line to San Diego Santa Fe Station, the trackage is owned by the North County Transit District, the operator of the COASTER commuter rail agency.
Sit back, relax, and enjoy the journey!
Additional Information:
Recording Date: May 12, 2021
Editing Software: Sony Vegas Pro 18
Leading Locomotive: Siemens SC-44 "Charger"
Trailing Locomotive: Surfliner Cabcar
Train Number: 564
Service Class: Coach
Trip Booked: December 2020
One-Way Fare: $36
Departure Station: Los Angeles Union Station, CA
Arrival Station: San Diego Santa Fe Depot, CA
Scheduled Departure Time: 7:10 AM PDT
Scheduled Arrival Time: 10:04 AM PDT
Scheduled Journey Time: 2 Hours 54 Minutes
Track Owners: BNSF, Metrolink, NCTD
Railroad Lines Used: San Bernardino Sub (BNSF), Orange County Line (Metrolink), COASTER Line (NCTD)
Maximum Operating Speed: 90 MPH (145 km/h)
Average Operating Speed: 41 MPH (66 km/h)