They can work in the mountain all winter. Makes sense to get the outside stuff done first
@gregwoottonАй бұрын
Yeah that makes sense to get outside stuff done first.
@kylesouthworth4963Ай бұрын
We are at the beginning of December already. I work for a construction management company, and as such, I know that the two weeks around Christmas and new year are slow. Even if guys are physically onsite, their focus and speed are not there. This year’s Opening day for the park was May 3rd. So they have about 4 1/2 months. To complete everything. Including landscaping, testing, certification and staff training. They really need to get moving here …
@AmusementInsidersАй бұрын
@@kylesouthworth4963 I know a few guys who helped build Yukon, Leviathan and Snoopys and even they’re like this is not a possible place to be in to finish on time
@TheDamusАй бұрын
@@AmusementInsiders I'm not looking forward to the lineups if this coaster launches in the summer
@kylesouthworth4963Ай бұрын
@@AmusementInsiders first, I love that you interact so much in the comments. Second.. that’s disappointing to hear rumblings from others that they may be behind. Thank you for all the videos. I mean it, they’re a welcome distraction
@JasmineDreamsАй бұрын
I’m just out here anxiously awaiting an opening date for Alpen Fury so I can book a flight lol
@Omomo2008Ай бұрын
It will probably be in April for the season pass preview
@hogle25Ай бұрын
R u joking....this is not ready in 4.5 months.....no way no way!!! They would have to have the best 8 weeks of any coaster construction job on the planet for that to be reality!!!
@hogle25Ай бұрын
July or August at best!!!
@dayumn271Ай бұрын
@@hogle25disagree
@rockyplayz7953Ай бұрын
U need to wait until 2025 when wonderland opens lol
@ThousanWhiteАй бұрын
If Behemoth doesn't get repainted by 2026, we riot.
@markvolpe2305Ай бұрын
I hope Ride of Steel at Darien Lake gets a new paint job by then too, it hasn't been painted (except the bunny hills) since it was built in 1999.
@MrTjp1906Ай бұрын
Thank you for all you do to keep us coaster nerds entertained during the cold season 🎢
@TheBigHeavyKevyАй бұрын
That was a very thorough up date. Probably the first time that I've seen a close up of a rebar tag on KZbin.
@cambriandude6205Ай бұрын
My guess is that vertical construction will start sometime next year, maybe in January should the weather cooperate. This will definitely be delayed atlest until july because 5 months to do construction, landscaping, and testing isn't enough, especially with snow on the ground.
@AirplanesAndAirtimeАй бұрын
YES a 10 minute update holy crap
@elevatoralarmcoasterandarc1214Ай бұрын
Very nice.
@clairefunnell8481Ай бұрын
Hope they get the outside stuff done for AlpenFury before the ground freezes. Love the track color, nice. Cant wait to ride it. ❤❤❤❤❤❤❤❤❤❤❤❤❤❤
@deletedaccountdndАй бұрын
“It’s a little late” took me out 😭
@Aidan265GamingАй бұрын
Hey Brendon! I was the one who said hi at the Chocolat Favoris booth on Sunday evening. Love the updates!!
@PeterPAC1994Ай бұрын
Thank you for the detailed update! It's hard to say, is the slow work because the track is coming in slow so they aren't in a rush or vice versa. In any case, the fact Wonderland also announced the silver pass after the passes went on sale in August and upgraded all regular season pass owners to Gold make me wonder if they already have a feeling this ride will be opening later in the year, as insentive. Even on their website they are advertising the Gold Pass to ride AlpenFury. I believe some of the other parks also announced the silver pass, so could be just coincidence though. Also I thought I recall in the walkthrough of the mountain earlier in the year, that they mentioned the new thunder run exit would go towards basically where the new Tiny Tom's is, which is where you are seeing the markings now 🤔
@hogle25Ай бұрын
How many pieces of track will thier be for the coaster? 115- 125? probably 100 left to be delivered...4 pieces a week? That put just track delivery at 6 months!!! That's june just to get the stuff delivered... 2nd if it's that slow, no company will have cranes, crews just standing around for weeks/months on end putting in that many pieces a week
@bakerfx4968Ай бұрын
The lack of track on site is absolutely concerning for the ride opening with the park lol
@Pad22Ай бұрын
I said this when they didn't go full throttle after labor day that they would be late. They are going too slow to make opening day. Its December folks.
@dreamy.reader52Ай бұрын
I've been hearing a bunch of enthusiasts say this coaster would be late. But I didnt believe them because you still had faith, Brendon. Now, since you're getting worried, im starting to question myself... I really hope they get Alpenfury open on time 🙏
@TheCoasterSpot26 күн бұрын
All the way back when you had the construction tour with everything, they said they needed to do and still design I was thinking that opening day seemed optimistic. Now I'm thinking at best June or July with how complicated the mountain construction will be. I figured with all the footings they did back in June that they would have gotten an early start on the station. The fact that they haven't every started the footings for that or gone vertical is alarming. Just so much to do.... BTW not only does Behemoth need a paint job it needs a new look that's not stealing Talon's colors!!!!!!
@hogle25Ай бұрын
Furthermore...look at footings, mountian work...they r NOT in any rush whatsoever, why would they...they know track will be a while. Station is a little different, I almost bet all that was rush produced so they could start the station. U said yourself they r still bidding on vertical construction...of course, they don't need to start it yet, materials. Haven't arrived
@jf873gamerАй бұрын
Vertical construction should've started last month. If it did, they would've had the first inversion completed by now or last week.
@marcussorenson3380Ай бұрын
hope alpenfury it goes vertical soon for you guys, wrath of rakshasa just went vertical yesterday
@dreamy.reader52Ай бұрын
That coaster was completed a while ago. It even began testing a week or two ago
@marcussorenson3380Ай бұрын
@@dreamy.reader52 what do you mean?
@dreamy.reader52Ай бұрын
@@marcussorenson3380 omg I'm sorry! I was thinking of rapterra. My bad, two completely different coasters!!
@marcussorenson3380Ай бұрын
@dreamy.reader52 that's alright rapterra has gotten faster now since the first launch
@dreamy.reader52Ай бұрын
👍
@jordanrenwick8949Ай бұрын
I'm definitely hitting up Wonderland next summer. 5 hour drive but it'll be worth it!
@GuyT-z7oАй бұрын
I LOVR that color blue wow
@alexhage4935Ай бұрын
The only thing weird is the blue on those supports .. lol
@RollercostersАй бұрын
Its soo pretty 🤩
@rockyplayz7953Ай бұрын
Ask wonderland if u can write smthing on the roller coaster track 😂😂😂 like a signature or smthing lol
@KevinT3141Ай бұрын
Amazing if they fix Riptide's water!
@tahjo7Ай бұрын
Gearbox = transmission on coasters
@AmusementInsidersАй бұрын
Thank you thank you 🙏
@mayalazovic8758Ай бұрын
Nice video
@hogle25Ай бұрын
At this rate,they should immediately start our next coaster, so it might open on time for that year!!!! Lol lol lol
@cheese-x3mАй бұрын
I think that it is likely now that it will get delayed for a month.
@tylormollins9402Ай бұрын
Technically, they're not late with the 10 year maintenance because of covid.
@AmusementInsidersАй бұрын
Valid point
@jdrammer5664Ай бұрын
Covid didn't delay anything. It was the reaction to covid that messed everything up. Your government is as corrupt as ours here in the states.
@briandevine8292Ай бұрын
I think that this will probably open on may 24 weekend because there is not way they can get this done in time I hope I am wrong though.
@DeepSingh-i5vАй бұрын
Brendok more poles more poles excited
@JAGsFamily80Ай бұрын
Let's go
@Subtome-l4jАй бұрын
Hi
@andrewbinette2409Ай бұрын
I can’t see them getting this done in time at the rate things are going. Mid summer may mean hotter temperatures and faster trains at least
@stoadmiralaaron580529 күн бұрын
Brendok ride soon go up like Rake go down Thudie Run exit
@VexxR22Ай бұрын
Leviathan needs a paint job bad. On behemoth a paint job wouldn't be as beneficial.
@David51295Ай бұрын
That’s the other way around , behemoth is not even its original colour
@whittakerbs90Ай бұрын
@@David51295exactly… it is the coaster that needs a paint job the most
@davidphoenix-l3gАй бұрын
When did backlot get renamed cornerstone?
@chuggy202129 күн бұрын
1:46 don’t take medicine it screws of your mind
@jhoncena1111Ай бұрын
When will vertical construction start?
@gorff6Ай бұрын
Interesting comment about action zone at the end of the video. What do you think they should do with Action Zone? Could they make it a DC Universe?
@1982robgeorgeАй бұрын
I hope alpin fury will open opening weekend but I’m worried
@AmusementInsidersАй бұрын
Same here 😞
@jordankomakech5137Ай бұрын
55th like
@philhutchings7354Ай бұрын
We don't even have a national postal service right now, they are on strike. No doubt this ride will be delayed......
@inSpiaredАй бұрын
Canada Post isn’t involved - private shipping companies only.
@hogle25Ай бұрын
Lol lol they don't ship 1000lb coaster track throught canada post
@philhutchings7354Ай бұрын
@@hogle25 it's an example of how much more difficult it is to work in Canada vs most of the USA right now. All shipping is also at a higher cost than the USA all partially related to how the national service is run.
@davidm469Ай бұрын
You need to relax lol. They can start in March and have that thing done in 2 months lol Breathe Bran
@jdrammer5664Ай бұрын
This will not be ready by opening day. I'd say sometime in early to mid July.