Рет қаралды 211
This was a Time to Task drill with a 1.75" deployment, scene size up, and then a force of the front door.
We utilize a 100' strapped bundle of 1.75" and then 100' of travel length. Total of 200' of hose.
The training was conducted at an acquired home that was donated to the FD. What we do works for us and our staffing/run district. It may not work for you but it's always worth a try!