In my country we do not let water flow directly back into the sea. Need to build revetment (walls) to close the reclaim area first to let sediment settle then pump the unsuitable silt to silt pond area.
@ovi. Жыл бұрын
if you watch closely you can see that the water will flow and the sand will remain , chec it out I have more videos with this process
@ss22076 Жыл бұрын
@@ovi. it could be sand components that create suspension in the water also depending the different on local regulations
@kdlehel2 жыл бұрын
Arata bine. Faina filmare.
@mony16iri2 жыл бұрын
Mulțumim pt filmare! Apăruse o știre că lucrările vor lua o pauză deoarece s a descoperit o corabie pe fundul mării și trebuie studiată
@RobertHasty Жыл бұрын
You need a spreader at end of pipe. That dozer should never got stuck. No experience obviously.
@markknoop6283 Жыл бұрын
That dozer wasn't stuck when it lowered the front it could move on. Whit these large volumes and fast progress you don't need a spreader it just lows you down. Because whenever you @ a pice of pipe you need to replace the spreader.
@valimica68022 жыл бұрын
Mulțumim pentru filmare! Eforie Sud? Boscheții și delăsarea ne omoară din păcate...
@ovi.2 жыл бұрын
Da Eforie Sud!
@yaaseenali4152 жыл бұрын
thank you nice upload
@ovi.2 жыл бұрын
Thank you too
@bahtiarefendi5752 жыл бұрын
New beach,,new hotel..am i right?
@ovi.2 жыл бұрын
In the resort are many constructions going on but, on the seaside, I didn't see nothing