My guess is vertical construction won't start until next month and then add there will be days where they won't be able to do anything at all due to weather conditions. I am highly skeptical this will be ready by the time the season starts
@dreamy.reader5210 күн бұрын
Thank you for all these updates! Even though the progress is slow, I still love watching your updates!!
@cw958310 күн бұрын
I’m a contractor for American Honda (in the USA); I saw a story online about the possible merger, but haven’t heard anything internally (it may be too early for anything to have surfaced). It will be interesting, to say the least. Thanks for your reporting.
@monkeydesigner9 күн бұрын
I really hope they push themeing more. bring back more waterfalls on the mountain!
@Rollercoasterboi27910 күн бұрын
I really hope Alpen fury opens on time.
@TheBigHeavyKevy10 күн бұрын
We should be seeing guys scrambling to get work done before the holidays. Most sites are shut down for the next 2 weeks, snow is coming, work isn't any easier in January.
@PcGuy-t1f10 күн бұрын
Got to consider what a HUGE and intergrated project this is... its basicly running through a third of the parks already in place attractions and sites... this was always gunna be tricky and messy looking. but i think theyll get there soon
@clairefunnell848110 күн бұрын
Awesome Brenden. Wow! Can't wait to ride Alpen Fury. Insane. Anything on Wildebeast?❤❤❤❤❤❤❤❤❤❤❤❤❤
@maaltagabriel10 күн бұрын
1:50 I'm sorry what now???? How is this the way I find this out?
@26frenzy10 күн бұрын
Fun fact , Walter’s designed and built the skywalk on the CN tower .
@antivillain10 күн бұрын
You’re right about there being a 2026 coaster being vertical before Alpenfury. Hollywood Drift 😂
@AmusementInsiders10 күн бұрын
lol that’s too funny lol 😂
@Evaine10 күн бұрын
To be fair that was for 2025 and got pushed back
@alexhage493510 күн бұрын
Construction will go vertical once Six Flags Qiddya opens lmao xD
@briandevine829210 күн бұрын
2:55 I don’t know if you mentioned this in another video but they did not keep that black paint near the exit tunnel.
@mary_berries10 күн бұрын
Doubt this coaster opens with the park tbh. I’m not sure the weather’s gonna do em any well later on either which will probably make it more difficult. Again, there’s still lots of work to be done even after the ride is up. I know Wonderland tends to work ahead when we least expect it at times but idk about this one. Also had no idea about the two car companies merging, complete news to me.
@elliottgdanski76610 күн бұрын
I know Sirens Curse was already produced - but they’re moving extremely fast on that one. Already vertical. Worries me about AF.
@AirplanesAndAirtime10 күн бұрын
Think positive lol I think they will be ready opening day but probably not with all the theming
@jasonbyl869510 күн бұрын
@@AirplanesAndAirtime I don't see it. They would need to have Alpenfury built by mid March in order to have enough time to get the amount of test runs for it to pass inspection to open. Personally I see late May at best.
@AirplanesAndAirtime10 күн бұрын
I’ve been watching Brenden for so damn long, at this point i literally read the titles of his videos in his own voice. He sounds the same irl too lol
@TheDamus10 күн бұрын
His name is alrighty
@AirplanesAndAirtime10 күн бұрын
@ why not
@TheCoasterSpot10 күн бұрын
How is siren’s curse vertical before this?
@ThrillRider24710 күн бұрын
They want it up..cp doesn't mess round 💯💯🎤🎤
@deletedaccountdnd10 күн бұрын
There is a coaster that is already vertical for 2026: F&F @ Universal Hollywood😂😂
@zombiepetmonkeyofficial10 күн бұрын
that must suck it has to be really cold and windy working on the mountain
@AirplanesAndAirtime10 күн бұрын
How many footings are there?
@snorkob9 күн бұрын
my voluime was way to loud for the first half of alrighty so it was like ALLLLLLLLLllllllllrighty
@DeepSingh-i5v10 күн бұрын
Brendok Nissan a d Honda merge maybe bc Nissan in big trouble. Alfin Tury I think AlLate July open
@levisimp386010 күн бұрын
i am quite scared tbh, i am gonna be going to cw this year on the last week of june, im nervous it wont be ready
@mayalazovic875810 күн бұрын
Exiting.
@rdabadie10 күн бұрын
Alpine fury, new for 2026. I don't see how they go vertical coming into the worst part of the winter, I bet they don't go vertical until the spring and at that point they won't get it done for 2025. As for Honda merging with Nissan, the Nissan CFO said they only had 12 to 14 months before they ran out of cash and that's not enough time for a turnaround, so the stock is probably about as cheap as it's going to get. I'm not exactly sure what Honda gets out of the deal.
@whittakerbs9010 күн бұрын
Bro relax alpenfury is not that far back… it will be done by late April early summer at worst
@1982robgeorge10 күн бұрын
It’s not opening opening weekend.. wonderland really should had started sooner, delays on tudra twister moosehorn falls and now this…
@ryan652310 күн бұрын
LazyBear Lodge was also delayed by a few months
@ThrillRider24710 күн бұрын
Sirens vertical.. wrath vertical..rapterrra all ready testing..this will not be open on open day .. period..they sooo far behind it's not even funny 💯💯🎤🎤