CBL VDL logs Basics Explaination

  Рет қаралды 7,031

Petroleum GATE Concepts

Petroleum GATE Concepts

Күн бұрын

CBL VDL logs , Some Basics Explained.
Cement Bond Log: It measures integrity of cement bond between tubing/casing and well bore. The log is typically obtained from one of a variety of sonic-type tools. The newer versions, called “cement mapping”, can give detailed, 360-degree representations of the integrity of the cement job, whereas older versions may display a single line representing the integrated integrity around the casing.
Tool component for CBL currently mostly consists of following equipment:
Gamma Ray/ CCL: It is used as correlation log. Gamma ray measures formation radiation and CCL records collar depth in tubing. Correlation log is a reference for a number of cased hole jobs as perforation, set plug, set patch, etc.
CBL/VDL: CBL measures cement bond integrity between casing/tubing and well bore. It apply concept of acoustic wave transferring through media. VDL is the top view of the cut away of upper part of acoustic wave that represents how cement bond from casing to wellbore
Caliper: Caliper measures wellbore diameter.
Downhole conditions that can cause errors in acoustic CBL interpretation or reliability are as follows:
Cement sheath thickness: Cement-sheath thickness may vary, causing changes in attenuation rate. The suitable cement thickness of 3/4 in. (2 cm) or more is required to achieve full attenuation.
Microannulus: A microannulus is a very small gap between casing and cement. This gap would affect the CBL presentation. Running the CBL under pressure can help eliminate the microannulus.
Centralize tool: Tool must be centralized in order to get the accurate amplitude and time
Source of text : Drillingformulas
Concept of CBL: Transmitter sends acoustic wave to casing/cement and then receivers receive acoustic signal that transfer through casing to cement and reflects to receivers. Acoustic wave at receivers is converted to amplitude (mv). Low amplitude represents good cement bond between casing and hole; however, high amplitude represents bad cement bond. The concept likes when we knock pipe. If there is something coverage around pipe, the reflection sound will be attenuated, and vice versa

Пікірлер: 1
@Ven_kat_ven_ky_
@Ven_kat_ven_ky_ 3 жыл бұрын
Keep continuing
What is Cement Bond Log?
5:58
Production Technology
Рет қаралды 16 М.
Common Well Cementing Problems and Solutions
4:21
Pegasus Vertex—A LINQX Company
Рет қаралды 9 М.
Sigma Kid Mistake #funny #sigma
00:17
CRAZY GREAPA
Рет қаралды 30 МЛН
Что-что Мурсдей говорит? 💭 #симбочка #симба #мурсдей
00:19
小丑女COCO的审判。#天使 #小丑 #超人不会飞
00:53
超人不会飞
Рет қаралды 16 МЛН
“Don’t stop the chances.”
00:44
ISSEI / いっせい
Рет қаралды 62 МЛН
Cement Bond Log & Its Interpretation | TOP Energy Training
59:34
TOP Energy Training
Рет қаралды 8 М.
Well Logging : Sonic Log
2:39
Harvest Chemical
Рет қаралды 36 М.
wellhead instillation.wmv
9:00
Oil and Gas
Рет қаралды 506 М.
How does an Electric Motor work?  (DC Motor)
10:03
Jared Owen
Рет қаралды 20 МЛН
Animation Rektifikation
6:47
magenta Kommunikation, Design und Neue Medien
Рет қаралды 275 М.
Lesson 4 - Introduction to Well Logs
41:34
IRIS Earthquake Science
Рет қаралды 113 М.
Running Casing
7:02
Frank's International
Рет қаралды 163 М.
cement bond log cbl
2:42
Hydrocarbons and petroleum informations
Рет қаралды 13 М.
How to Make a Real Diamond - (Not Clickbait)
8:51
JerryRigEverything
Рет қаралды 5 МЛН
Sigma Kid Mistake #funny #sigma
00:17
CRAZY GREAPA
Рет қаралды 30 МЛН