Рет қаралды 1,488
In Fort Erie, Ontario, Canada, Western completed an accelerated bridge construction with Rankin Construction. The new bridge was constructed adjacent to the existing bridge and a skidding system rolled the bridge to the final location after the demolition of the existing.