How To Estimate The Cost Of Shoring In Construction Projects

  Рет қаралды 8,916

Cost Engineering Professional

Cost Engineering Professional

Күн бұрын

Пікірлер: 29
@muzammilahmed4515
@muzammilahmed4515 2 жыл бұрын
You’re a gem of a person ….may you get bullion subscribers and billion of views
@CEPQS
@CEPQS 2 жыл бұрын
Thanks Muzammil for your kind support, and appreciate your valuable time watching the videos. 🙏🙂
@MohammadAdnan-ql3vj
@MohammadAdnan-ql3vj 2 жыл бұрын
Great explanation and alot of information in one awesome video . Thanks alot Eng Ahmed 👏
@CEPQS
@CEPQS 2 жыл бұрын
Thanks a lot Eng Mohamed and much appreciate your valuable support ❤️😊🙏
@goldensky.
@goldensky. 2 жыл бұрын
Thank you so much Mr Ahmed adil very knowledgeable video and please one video make for mep estimation for construction site
@ammuhasini3305
@ammuhasini3305 2 жыл бұрын
very clear explanation.. i would like to see more estimating videos..
@CEPQS
@CEPQS 2 жыл бұрын
Thank you for the support and appreciate your watching time 🙏😊
@mohammedjavadhkt
@mohammedjavadhkt 5 ай бұрын
Masha allah❤
@rizwan5571
@rizwan5571 Жыл бұрын
well explained,
@CEPQS
@CEPQS Жыл бұрын
Thank you 😊
@mesob210
@mesob210 2 жыл бұрын
How to prepare take off and bar for pille
@CEPQS
@CEPQS 2 жыл бұрын
As in the video 😃👍
@jackaffara2393
@jackaffara2393 2 жыл бұрын
there may be a little mistake in the calculation of your dia bar, kindly correct me if im wrong please (2x3.14xd/2)=(2x3.14xr2)=2x3.14x0.225= 1.413Lm as against 1.88Lm
@CEPQS
@CEPQS 2 жыл бұрын
Thanks for the hint 🙏👍. Yes you are correct.
@mohamadoubanhoro6678
@mohamadoubanhoro6678 Жыл бұрын
I got the same results as you. = 1.413 Lm
@rabahribouh3151
@rabahribouh3151 2 жыл бұрын
Great explication, please how can I find the POMI guide pdf ??
@CEPQS
@CEPQS 2 жыл бұрын
Thank you for watching 🙏🙂. You can search that Google, I believe easy to be found.
@rabahribouh3151
@rabahribouh3151 2 жыл бұрын
@@CEPQS I already found it but it's only 26 page or something like that I don't know if it is the full document or not. By the way your videos are amazing. Keep going bro
@CEPQS
@CEPQS 2 жыл бұрын
@@rabahribouh3151 thanks a lot for the support 🙏. Yes it is a small document, but applying what is in there results in an amazing BOQ
@rabahribouh3151
@rabahribouh3151 2 жыл бұрын
@@CEPQS thanks so much for your time. Keep going 💪
@gentlestrokes2139
@gentlestrokes2139 10 ай бұрын
Hello, I'm not an engineer but Iam pretty good with math. I am trying to make an estimation for a small project in my yard. I would like to know Where do you find the rate and the manpower cost for your country??
@leonardofetalvero6942
@leonardofetalvero6942 Жыл бұрын
bravo
@Elton-ie6uo
@Elton-ie6uo 2 жыл бұрын
Hi, do quantity surveyors prepare bills of quantities for M&E Works or is part of M&E engineer works? Are there any guidelines for preparing a BOQ for M&E Works? thk
@johncat6126
@johncat6126 2 жыл бұрын
Hello sir, great video as always. I just have a query. In the last part, you divided 1/0.60 = 1.67 piles. Why did you divide one (1) by the diamater?
@CEPQS
@CEPQS 2 жыл бұрын
Thank you 🙂. 1 linear meter devised by the diameter of one pile gives you the number of piles per linear meter 👍
@johncat6126
@johncat6126 2 жыл бұрын
@@CEPQS I get what you’re trying to point out sir. This means that this unit cost/linearmeter is applicable on different diameters of piles right?
@CEPQS
@CEPQS 2 жыл бұрын
See the reason we calculate the number of piles per linear meter is that when multiplied by the total length you get the total number of piles in the project and when that is multiplied by one pile cost you get the project total amount
@CEPQS
@CEPQS 2 жыл бұрын
Pile cost and number of piles per linear meter will sure vary if the diameter change
@johncat6126
@johncat6126 2 жыл бұрын
@@CEPQS Ahh. Got it. So this computation is like a simplification instead of direct counting all the pile heads for the project. Thank you very much for taking the time to respond. Btw I am a practicing quantity surveyor in the Philippines and your videos are very much applicable to my job and greatly help me in improving skills needed in the job. Keep up the work sir!!!
How To Calculate The Cost Of House Construction In 2025
8:51
Cost Engineering Professional
Рет қаралды 9 М.
How to Estimate the General Requirements Cost in Construction
32:56
Cost Engineering Professional
Рет қаралды 1,7 М.
Хаги Ваги говорит разными голосами
0:22
Фани Хани
Рет қаралды 2,2 МЛН
БАБУШКА ШАРИТ #shorts
0:16
Паша Осадчий
Рет қаралды 4,1 МЛН
Andro, ELMAN, TONI, MONA - Зари (Official Music Video)
2:50
RAAVA MUSIC
Рет қаралды 2 МЛН
Project cost management and the process of cost control in construction projects
47:33
Cost Engineering Professional
Рет қаралды 53 М.
Why Buildings Need Foundations
14:51
Practical Engineering
Рет қаралды 3,5 МЛН
The actual reason for using stirrups explained
9:01
The Engineering Hub
Рет қаралды 804 М.
How to take MTO from P&ID?
17:09
Ganesh Piping
Рет қаралды 9 М.
From Bored to Driven: Demystifying Pile Foundation Choices
12:58
BEng The Brazilian Engineer in Australia
Рет қаралды 52 М.
What Are The Types Of Contracts Used In Construction Industry
16:41
Cost Engineering Professional
Рет қаралды 15 М.
How to Estimate Equipment Cost In Construction Projects
10:16
Cost Engineering Professional
Рет қаралды 18 М.