Thanks for the informative and detailed explanation. I have a question, when we are estimating for a project Tender, in which document states the priority of documents?
@vinods2655
@vinods2655 Ай бұрын
And what if the priority of documents are not stated. Could you please clarify?
@CEPQS
@CEPQS Ай бұрын
It will be a part of conditions of contract
@CEPQS
@CEPQS Ай бұрын
You might need to refer to some standard form of contract like FIDIC.
@ThapeloMangole
@ThapeloMangole Ай бұрын
You are indeed a good teacher
@CEPQS
@CEPQS Ай бұрын
Thank you 😊
@M.ri77
@M.ri77 Ай бұрын
Thank u بارك الله فيك و بعلمك يا مهندس معلومات قيمة جداً ❤❤❤
@CEPQS
@CEPQS Ай бұрын
Thanks a lot for watching and support ❤️
@daberechukwumiracle7562
@daberechukwumiracle7562 Ай бұрын
From Nigeria Thanks for the informative and detailed explanation ❤
@CEPQS
@CEPQS Ай бұрын
Thanks a lot for watching. All love ❤️
@mskmea
@mskmea Ай бұрын
Thanks for the information and explanation.
@CEPQS
@CEPQS Ай бұрын
Thank you for watching and commenting 😊
@fayazmuhammad2505
@fayazmuhammad2505 Ай бұрын
Masha Allah, and thanks for deep knowledge
@CEPQS
@CEPQS Ай бұрын
Thanks for watching comment ❤️
@ayeshishara2353
@ayeshishara2353 Ай бұрын
Thank you sir❤
@CEPQS
@CEPQS Ай бұрын
Thank you for watching 😊
@Engr.abidislam
@Engr.abidislam Ай бұрын
Very useful insight. Kindly upload more such informative videos
@CEPQS
@CEPQS Ай бұрын
Thank you for watching. Sure I will
@lofongojohnson
@lofongojohnson Ай бұрын
Hi manager Am Mr Johnson. Thx
@CEPQS
@CEPQS Ай бұрын
Nice meeting you 😊
@slaveOfAllah1013
@slaveOfAllah1013 Ай бұрын
Thank you Jazakallah haira ❤❤❤
@CEPQS
@CEPQS Ай бұрын
Thank you ❤
@BilalKhan60
@BilalKhan60 Ай бұрын
Thanks. Could you please differentiate among Claim, Variation and change with example.?
@CEPQS
@CEPQS 29 күн бұрын
Thank you 😊. I’ll do my best
@Gototop777
@Gototop777 Ай бұрын
Thankyou you Sir Jazakallah khair
@CEPQS
@CEPQS Ай бұрын
Thank you 😊
@BiroleP88
@BiroleP88 Ай бұрын
Hi! Could you post a video about calculating costs in Gypsum works as there’s many different materials and the labour costs increases per m2 if it’s 2 layer or 3 layer boards
@CEPQS
@CEPQS Ай бұрын
Thank you for reaching out. I’ll try to plan for it in the upcoming videos
@tylerhawkins2769
@tylerhawkins2769 Ай бұрын
Hello Ahmed, thanks for the awesome video, I just a question if the works are just a quantity addition, but the change is to affect works already complete (eg move a team down three levels cut into a wall to adjust pipes) how will the price be calculated as this task if more difficult than the SOR suggest? thank you for your time.
@CEPQS
@CEPQS Ай бұрын
Thanks for watching. Regarding your question, I believe the case you discussed is an additional scope that is not part of the contract (modification of existing / completed works), and hence this is type 3 (change in quantities and rates). For these new works, define the scope - in items - and for each item put the rate. For the items that have a rate in BoQ, use it, and for the new items, establish a new rate and substantiate it. Hope that concludes the case. Note: “the completed works can be claimed under the original contract, and the modification will be claimed separately under the VO”.
@HumbleExpedition
@HumbleExpedition 2 күн бұрын
Hey nice videos as usual. I am a qs myself with a year of experience in the position . I was wondering if the advance payment is increased or decreased subsequent to the contract amendment/ variation ?
@CEPQS
@CEPQS 2 күн бұрын
Thank you for watching, and wish you all the best in your work. The same contract terms will be applicable for variations 👍
@oluwaseunoguntuga5280
@oluwaseunoguntuga5280 Ай бұрын
Good evening, Sir. I would like to know if we can classify the increase in price of material during the cost of the project as a variation?
@CEPQS
@CEPQS Ай бұрын
It depends on what has been agreed in the contract. Some times it is agreed that if materials price increased more than a pre-agreed percentage then it becomes variation
@shaakiromar7311
@shaakiromar7311 Ай бұрын
Thanks. Mostly, we use wood for our buildings, so do you have a course that is related to wood estimation ..
@CEPQS
@CEPQS Ай бұрын
Thank you 🙏. My experience is mostly in RC structures 🥹
@priyankaevon2853
@priyankaevon2853 Ай бұрын
How we can do the omissions
@CEPQS
@CEPQS Ай бұрын
Contract quantity is a number and revised quantity is zero. The net will be in minus ☺️
@vinods2655
@vinods2655 Ай бұрын
❤❤❤
@CEPQS
@CEPQS Ай бұрын
😊
@MohammedAseem-p5u
@MohammedAseem-p5u Ай бұрын
PLE POST MORE USEFUL VIDEOS SIR
@CEPQS
@CEPQS Ай бұрын
I will try my best.
@engmubarakhaji6259
@engmubarakhaji6259 Ай бұрын
LIKE YOU WE DON'T GET EVERY WHERE I WOULD LIKE TO MAKE VIDEO FROM CONTRACT DOCUMENTS.
@CEPQS
@CEPQS Ай бұрын
Thanks a lot ❤️. Sure, will try my best 😊
Quantity Surveyor Duties: Your Career Guide
15:11
Cost Engineering Professional
Рет қаралды 2,2 М.
How to do rate breakdown analysis of civil engineering, arch, and MEP projects
15:35
Cost Engineering Professional
Рет қаралды 4,3 М.
99.9% IMPOSSIBLE
00:24
STORROR
Рет қаралды 31 МЛН
Quando eu quero Sushi (sem desperdiçar) 🍣
00:26
Los Wagners
Рет қаралды 15 МЛН
How to Estimate the General Requirements Cost in Construction
32:56
Cost Engineering Professional
Рет қаралды 1 М.
How To Prepare Interim Payment Application For A Complete Project - Full Project Example
20:13
Construction Cost Estimation in Excel, Step-by-Step Guide
20:00
Cost Engineering Professional
Рет қаралды 2,7 М.
What Are The Types Of Contracts Used In Construction Industry
16:41
Cost Engineering Professional
Рет қаралды 15 М.
How To Calculate Cement And Sand Mortar For Construction Projects
10:46
Cost Engineering Professional
Рет қаралды 14 М.
Simon Sinek's Advice Will Leave You SPEECHLESS 2.0 (MUST WATCH)
20:43
Alpha Leaders
Рет қаралды 1,3 МЛН
How to Write a Contract: Construction Contract Basics
16:50
Ogden Built
Рет қаралды 26 М.
“CONSTRUCTION CONTRACT VARIATIONS AND CLAIMS” WITH PETER MALLETT
32:12
Project Professional
Рет қаралды 1,3 М.
How to Go from Manager to Director
18:14
Ryan Stoltzfus - Career Coach
Рет қаралды 18 М.
Procurement Process In Construction - Supply Chain Management
13:31
Cost Engineering Professional
Рет қаралды 15 М.
99.9% IMPOSSIBLE
00:24
STORROR
Рет қаралды 31 МЛН