Рет қаралды 50
Hi everyone! First, I apologize for the length of this video. It's long...and I've yet to figure out how to put those fancy bookmarks in to highlight certain areas. Anyway, in the 10th part of the build, the doors get finished up, then the roof panel gets installed, followed by the seat butt kicker installation and final assembly/installation of the seat base. The last part of the video I rig up the GoPro then we do some actualy flying on VATSIM from my home airport to KMFD. Thanks for watching! -- Watch live at / n8033fox