Рет қаралды 2,233
Saturday September 13 2014 at 3.28. The 14.42 London St Pancras to Margate (16.10) and the 14.53 Margate to London St Pancras (16.21) trains which do half their journeys on the high speed line. This crossing was filmed very badly in Nov 2011 from the other side. By coincidence, 2 high speed trains were filmed then too. This is the next LC from the manually operated Chartham. 3 minutes of the wait here was cut out so the barriers were lowered almost 5 full minutes before the first train arrived. Network Rail should operate level crossings better than this.