Collector Wind Farm Construction

  Рет қаралды 944

RATCH-Australia

RATCH-Australia

Күн бұрын

RATCH-Australia's newest wind farm - Collector Wind Farm - has reached its final hold point and is operating at full capacity. The wind farm is located 4km North West of the town Collector off the Hume Highway. The 54 4.2MW wind turbines is expected to generate almost 530 Gigawatt Hours (GWh) per annum - the equivalent of powering 80,000 NSW homes based on average electricity consumption. This is the story of the construction of the Collector Wind Farm. For more information visit www.collectorwindfarm.com.au.

Пікірлер: 2
@amangautamjackangle
@amangautamjackangle 2 жыл бұрын
Amazing content thank you guys
@murin7185
@murin7185 2 жыл бұрын
Thanks
Wind Turbine Construction - Harnessing The Wind | Full Documentary
49:29
WELT Documentary
Рет қаралды 503 М.
“Don’t stop the chances.”
00:44
ISSEI / いっせい
Рет қаралды 62 МЛН
Offshore wind farm plans spark controversy | A Current Affair
6:37
A Current Affair
Рет қаралды 12 М.
How Wind Turbines Are Built
8:01
Tech Vision
Рет қаралды 113 М.
The Hidden Engineering of Landfills
17:04
Practical Engineering
Рет қаралды 7 МЛН
Wind Energy | Future of Renewable Energy | Full Documentary
52:55
THE MACHINIST TV
Рет қаралды 170 М.
Why This Hydrogen Fuel Cell is Engineering Genius
21:43
Ziroth
Рет қаралды 688 М.
‘Turbine graveyards’ sprawled across Texas
6:04
Sky News Australia
Рет қаралды 470 М.
Mount Emerald Wind Farm Construction
10:05
Showreel
Рет қаралды 186
“Don’t stop the chances.”
00:44
ISSEI / いっせい
Рет қаралды 62 МЛН