Concrete Pumping is a widely used method for concrete construction. However, pumping is known to change the air content of fresh concrete. This video uses lab and field data to verify that the air is lost and the important air, the small bubbles seem to return to the concrete before it hardens. This is an important finding and a chance to change current specifications that require air content to be measured after a concrete pump.
www.tylerley.com
www.tylerley.com/giving

Пікірлер: 41
@sliderofelay
@sliderofelay Жыл бұрын
I work for a ready mix and had an air requirement on top of the mountain. 4000ft gain in the hour it took to drive up to it. We would loose 2-4% air from 7ish down to 3 or 4 and then if it sat in the mixer for 10-15min slowly turning it would come back up to 7%. Confused the heck out of me. This is probably why. I'd love to see more about vacuum stuff. Great info. Thank you.
@TylerLey
@TylerLey Жыл бұрын
Thanks! Did you remix when you got to the top of the mountain? Did you mix harder then when you were driving? This typically causes the jump in air.
@hamedmayani-v6v
@hamedmayani-v6v Жыл бұрын
You could air entrain right befor pumping Humbly this is what i would do
@Jsd_1
@Jsd_1 Жыл бұрын
I had a DOT job the spec’d 6% +/- 1.5 %. Got 7% before the pump, but after the pump it went down to 3.5%. They had me spike the air to a 12% so at the end of pump it would hit spec. I fought and fought until the threatened to reject the truck. Needless to say I had them sign off and make cylinders on both ends so they could see the weight difference. I actually sent them a video Tyler made a few years back on this topic.
@TylerLey
@TylerLey Жыл бұрын
I am sorry to hear this. I hope this will change soon.
@Westermen279
@Westermen279 10 ай бұрын
A project I was apart of in 2018-2019 with CDOT submitted samples for this study, but we never really heard a follow-up to it all. Colorado revised the point of sampling from after pumping to before the pump a couple of years after though, so we assumed something significant was the result. It's awesome to finally know more about the research and the conclusion! Great video too!
@geoffnorrena5707
@geoffnorrena5707 4 ай бұрын
Love ALL your videos man!!!!! I do QC in Colorado and your entertaining and informative videos help me so much!! Thank you
@lilanedaria
@lilanedaria Жыл бұрын
Fantastic work, I love the experimental and science-driven approach to presenting the information. I wish this was the norm. But of course, there is a considerable amount of work and knowledge that goes into making a video like that. Thanks to Tyler and the students for their hard work.
@TylerLey
@TylerLey 11 ай бұрын
Thank you very much!
@adamr1637
@adamr1637 Жыл бұрын
Bravo! This is valuable information! Thank you for the excellent content!
@TylerLey
@TylerLey Жыл бұрын
Thanks for watching!
@AlisonMaier-e7w
@AlisonMaier-e7w Жыл бұрын
Amazing! We are having a panel discussion at our next local ACI chapter luncheon. Thank you!
@uliclongford9694
@uliclongford9694 Ай бұрын
Seems to be like scuba diving. As you go deeper the bubbles dissolve, as you return to the surface the bubbles expand/return.
@HalaElia-m8u
@HalaElia-m8u Жыл бұрын
Thank you, Dr. Ley, for this presentation.
@TylerLey
@TylerLey Жыл бұрын
Thank you for the comment!
@MitzvosGolem1
@MitzvosGolem1 Жыл бұрын
Always use retarder and plasticizer in pump mix. Especially in hot weather . Always add 1-2 yards extra to prime pump lines . Then ensure pump has a place to clean out thoroughly. We had a Putzmeister 43 meter on NYC.
@TylerLey
@TylerLey Жыл бұрын
Great tips! Thanks for sharing!!!
@GRUBB-MUDD
@GRUBB-MUDD 11 ай бұрын
No disrespect by saying bro, sorry Tyler, but yeah I'd love to discuss a few topics like this ,rebar , wire fiber ect
@robertbourg1010
@robertbourg1010 7 ай бұрын
I have a diy that even you may not have heard of. Underground roof slab for storage room. One way design. 4x9 plywood form base. Set up to pour one 8 inch wide section at a time sleeves for distribution bars on the movable side. The idea is to pour and cover. Wait three days ,then install the next side form. Remove the side form from the poured section. Drop in the rebar cage for the next section and pour . Continue for 20 linear feet. All poured concrete remains covered with visqueen for 28 days. Am I right, or have you seen this before ?
@danielwhite5705
@danielwhite5705 11 ай бұрын
Hope you're doin' well professor! Can we have a two way slab design video?
@TomaszSobierajski-c6m
@TomaszSobierajski-c6m 10 ай бұрын
Interesting presentation. Thank you!
@shanetaylor2498
@shanetaylor2498 21 күн бұрын
Love your videos. What if you pleased Concrete Dry wet it wait half hour or so and used a Viber plate on it ??
@GRUBB-MUDD
@GRUBB-MUDD 11 ай бұрын
Hey bro I'm a concrete youtuber, I have some questions I'd like to ask u about on a stream! I been a fan for years and even shouted u out b4
@TylerLey
@TylerLey 11 ай бұрын
Sure! Let me know when you want to chat.
@davidmichalski2634
@davidmichalski2634 Жыл бұрын
This is AWESOME!!! Great info. Yes should always be at the truck. With this info, why is everyone wanting more air in the concrete if 4% is great. This would mean less cement( like everyone is wanting, green world) better breaks with less air. Easier to control then the 7% or 6% required.
@TylerLey
@TylerLey Жыл бұрын
I agree! As long as the air is good air void distribution then 4% is perfect.
@JohnRobson-d1d
@JohnRobson-d1d 11 ай бұрын
Your presentation indicates that the spacing factor of normal temperature concrete recovers about 45 minutes after pumping. This suggests that while concrete sampled at the pump discharge may have a non-compliant air content/SAM number, cylinders cast from this sample of concrete should experience a recovery of dissolved air and have about the same spacing factor as cylinders cast from concrete sampled before pumping. When the concrete was sampled at various time intervals after pumping to check the SAM numbers, were cylinders cast and the spacing factor of the hardened concrete determined? If your premise is correct, the timing of casting the cylinders should not have a big influence on the results. If so, is the data available in one of your papers? My studies of annual LT results for a municipal QC program comprising dozens of samples indicate that there is often a characteristic relationship between hardened air content, spacing factor and specific surface, often unique to the concrete admixture package. I wonder if there may be something similar happening after pumping
@MsDJ619
@MsDJ619 Жыл бұрын
Hello tyler, can you talk about concrete repairing techniques, cracks repairing and touch on the life time expectancy of a building?
@TylerLey
@TylerLey Жыл бұрын
Thanks! I have two videos on these topics coming. I have one video on repair materials and another video on crack repairs. Stay tuned!
@MsDJ619
@MsDJ619 Жыл бұрын
@@TylerLey you're the best
@victimovtalent6036
@victimovtalent6036 Ай бұрын
Micro bubbles affecting concrete flexural?
@jacobdumars4515
@jacobdumars4515 8 ай бұрын
It has been an argument for a very long time. POP is the pump!! We have no control over the concrete when it goes thru the pump!! What happens when the pump has a leak? Or the pump operator doesn't do a good job cleaning his pipe? So many factors involved.
@thomasrmclellan
@thomasrmclellan Жыл бұрын
Will you be publishing this? It would be amazing to have this as a simple reference when specifiers require sampling from the pump.
@TylerLey
@TylerLey Жыл бұрын
Yes, you can see two reports at www.tylerley.com/pumping We have two other papers under review and one more about to be submitted.
@patrickvanlanen4037
@patrickvanlanen4037 Жыл бұрын
Use Sika Aer Solid for instance. What you put in you measure every where in the process and therefore you only need to measure once on the batching plant. It’s like really tiny ping-pong balls. The are specified for roadworks in Europe.
@TylerLey
@TylerLey Жыл бұрын
Thanks! When people have tried solid air in pumped concrete it has caused the spheres to be destroyed.
@grim6980
@grim6980 11 ай бұрын
I want to experiment with making Roman Concrete. I am suprised there are so few videos that even talk about it. I only found one video where a guy made it but that was before the discovery of hot mixing. I would think the concrete industry and people like yourself would be all over the subject of concrete that has lasted over 2,000 years.
@JELWwL6unE8V7iGB3
@JELWwL6unE8V7iGB3 Жыл бұрын
So, if I wanted to make concrete with even better air entrainment and especially lots of tiny bubbles, could I compress air into the water at high pressure, then heat exchange the water down to about 40 degrees before I release the pressure and use that water to mix up the concrete? I'm thinking air dissolved into the water would tend to make really uniformly spaced tiny bubbles as it is released by the water. Is there any chemical that I could mix with the water that wouldn't mess with the performance of the concrete, but would make this technique work even better?
@TylerLey
@TylerLey Жыл бұрын
I have done stuff like this before and imaged the bubbles in 3D with X-ray CT! It is published in this paper. The dissolved air in the concrete will come out of solution because of the high salinity pore solution. If you de air the water before you make the concrete and don't whip the water into it while mixing then you will significantly decrease the bubbles that form. I never made a video about it. I didn't think people would care. Moradian, M., Ley, M.T., Hu, Q, Robertson, B., Hanan, J., Xiao, X., “Direct in-situ observation of early age void evolution in sustainable cement paste containing fly ash or limestone”, Journal of Composites Part B, V175, 2019, pp. 107099, doi.org/10.1016/j.compositesb.2019.107099.
@ndenise3460
@ndenise3460 Жыл бұрын
So how do we control this on site for the pour?
@TylerLey
@TylerLey Жыл бұрын
I think the best answer is to measure it at the tuck and if it is good then you should be good after pumping. If you really want to minimize air loss while pumping because the specifier is going to make you measure on site then you can try and pump in a horizontal position as much as possible. You can also avoid having cold concrete because the air dissolves more in cold concrete. This wasn't really the focus of the work.
Water Reducer Admixture in Concrete
7:58
Tyler Ley
Рет қаралды 9 М.
Comparing Curing Methods for Concrete
11:13
Tyler Ley
Рет қаралды 34 М.
How Strong is Tin Foil? 💪
00:26
Preston
Рет қаралды 142 МЛН
Man Mocks Wife's Exercise Routine, Faces Embarrassment at Work #shorts
00:32
Fabiosa Best Lifehacks
Рет қаралды 6 МЛН
iPhone or Chocolate??
00:16
Hungry FAM
Рет қаралды 46 МЛН
Admixtures for Concrete - What is a Water Reducer?
13:12
Tyler Ley
Рет қаралды 42 М.
How to order ready mix concrete like a Pro!
15:20
Tyler Ley
Рет қаралды 12 М.
Plastic shrinkage and settlement cracking in concrete
9:54
Tyler Ley
Рет қаралды 74 М.
EP #087: The Importance of Properly Curing Concrete
44:50
Concrete Logic
Рет қаралды 496
Maintaining concrete for a long life
9:50
Tyler Ley
Рет қаралды 30 М.
Testing Dry Pour Concrete with an Expert
18:58
Tyler Ley
Рет қаралды 29 М.
Viral logic test from Brazil
6:41
MindYourDecisions
Рет қаралды 2,8 МЛН
Aggregates in Concrete Mix Design
22:49
Tyler Ley
Рет қаралды 83 М.
How Strong is Tin Foil? 💪
00:26
Preston
Рет қаралды 142 МЛН