Prototype and prelaunch control plan ko with format explain kro sir , usme kya kya dalnge kese kese dalenge
@Pavankumar-ph4bg2 жыл бұрын
Thanks sir
@baliramkumar3240 Жыл бұрын
What is different between FIRST PART APPROVAL AND JOB SET-UP
@jitendrapradhan15982 жыл бұрын
Thank you🙏
@haritsaini31213 жыл бұрын
This is first video for me of this channel and i will see another videos also. It is a great Video about Control Plan. You have cleared everything about it. can you make one Video on Difference among PPAP, Control plan and APQP? And also explain How they relate to each other and What documents are required for each (PPAP, Control Plan and APQP). And give One Product example for understanding the difference among APQP, PPAP and Control Plan.
@AmanSingh-rg4fn4 жыл бұрын
Very important topics for manufacturing industry
@cookingwithshravan23563 жыл бұрын
Sir pls tell me pilot part kya hota hai
@QMSDIVYANSH4 жыл бұрын
You are Great SIR
@Rockstar-tv6kv4 жыл бұрын
Sir proto type control plan jab hum first piece sample banate he tab banta he kya...
@qualitydocumentssolution-q81834 жыл бұрын
Prototype can be made in two phases 1st is design prototype and 2nd is Production prototype and production prototype is made during tool trial.
@Rockstar-tv6kv4 жыл бұрын
Sir tool trial ke doran means sample piece hota he na.
@qualitydocumentssolution-q81834 жыл бұрын
No, sample part is made during significant Production trial run which is called initial sample as well.
@Rockstar-tv6kv4 жыл бұрын
@@qualitydocumentssolution-q8183 thank you sir ... Clarify my question..
@BharatKumar-cz9rt2 жыл бұрын
If supplier and design is changing for one part but function is same only esthetic is changed than CP will be revised or not if yes than which things will be changed.....
@hemant86211 Жыл бұрын
All things are changed.because part DESIGN are change than again part gone under to DFMEA study & so protype cp are made 1st And 2nd one if only supplier change than also all thing are change.... for new supplier coming..
@hariomtripathi54644 жыл бұрын
Nice video sir Please send a sample filled control plan in excel format
@souraranjanrath99523 жыл бұрын
Nice dedicated elaboration of the Format. At the Same time Requesting you to please prepare SPC video as related to Electronics industry please.
@aarifsheikh71844 жыл бұрын
Sir IATF 16949 :2016 ki complete vedeo ..bnaye plzz
@qualitydocumentssolution-q81834 жыл бұрын
Will come soon
@lokeshpandey85674 жыл бұрын
How to fill part familiar control plan format
@krushnapanda17904 жыл бұрын
In one slide you told production CP is made in APQP 4th Phase, in another slide you told Production CP is made before hand over to production both are contradicting if the 2nd line is correct then prelaunch CP will continue till the end of APQP 4th phase
@qualitydocumentssolution-q81834 жыл бұрын
First of all Thank you for watching Production CP preparation is done in APQP 4th phase and before handover to production as per AIAG manual but it will be implemented after handing over to Production. During all trial and before SOP at customer end prelaunch CP exists.
@pradeepsingh-it5oo4 жыл бұрын
Nice vedio sir
@qualitydocumentssolution-q81834 жыл бұрын
Thanks
@BharatKumar-cz9rt2 жыл бұрын
This part is introduced to come up from supply issues due to covid19
@facts_technology37744 жыл бұрын
Sir CP ko review karne ka plan bana skate h ya chahiye
@vipinmandaliso22924 жыл бұрын
As per IATF 16949:2016 Clause 8.5.1.1 (e) review as a set frequency based on FMEA. You can prepare review plan as once in a year or twice in a year.
@AmanSingh-rg4fn4 жыл бұрын
Doing very well sir
@qualitydocumentssolution-q81834 жыл бұрын
Thank you
@s.schouhan94294 жыл бұрын
👌👌👌👍
@hariomtripathi54644 жыл бұрын
Nice video sir kindly send case study. CP in excel sheet .
@puneetsharma25224 жыл бұрын
Sir thank you for such an informative video. Actually i have doubt related to Prototype control plan. Do we manufacture the part during prototype control plan? And if yes then how many parts are manufactured during this phase?
@hemant86211 Жыл бұрын
As per customer demand or very less Qty may be 5 /10 .