hello again sir BIO CYBER, thanks again sa important information, go go go. lang sa pag update
@biocyber4544 Жыл бұрын
Salamat po Sir :)
@zorossense Жыл бұрын
I'm really glad they redesigned the South Commuter Line and gave its own theme compared to its northern counterpart. Very modern, classy, and natural energy conscious. I think ADB is very concerned about sustainability and eco-friendliness so the end result is very much inline with their ESG agenda so they were willing to shell out more funds to make that a reality. Definitely a big win for the whole line but more specifically the commuters from the south.
@teovlog8239 Жыл бұрын
Thanks for sharing so technically informative.. keep it up sir. Interesting samin tiga southern tagalog.
@biocyber4544 Жыл бұрын
Thanks po Sir for always watching! :)
@erpelomark2561 Жыл бұрын
Galing.. doon po sa part ng magsaysay wag na nila taasan ng sobra kasi tinanggal na nila iyong bridge doon tama lang na sa ilalim nalang siya ng lrt 2.. sana mag karoon ng conection ang station sa nscr at lrt 2 medyo challenging lang kasi malayo sana mapa lapit nila iyon soon..
@biocyber4544 Жыл бұрын
...let's see po kung anong option na ang gagawin nila sa Magsaysay area, now na na demolish na yung flyover... thanks for watching!
@dennisquicksign157 Жыл бұрын
option 2 na sigurado yan dahil ginawa ung plano ng nscr3 na hindi kinonsider ung pag demolish ng magsaysay bridge. magka level na lang sila ng connector rd na dadaan sa ilalim ng lrt2, kaya pati ung station ng magsaysay marerevised din. malayo ung station ng lrt2 kaya walang magiging connection.
@nakagawarem5729 Жыл бұрын
@@dennisquicksign157possibly na maggogo pa rin sila sa pag Flyover sa LRT 2 since hindi kakasya yung catenary kung ipapasok nila pailalim
@nakagawarem5729 Жыл бұрын
Ang problema kung kakasya ba ang Electrical wire sa ilalim
@parasoul26 Жыл бұрын
Request to make a video explaining how the Unified Central Station in North Avenue will be connected to the subway. Can you tell us where the bridges, tunnels or walkways will be to connect the central station to the nearest subway station. Thanks
@redlancelot2634 Жыл бұрын
Excited na mga taga laguna including me hehehe dito sa south para sa construction and operation ng nscr. Pa explain din ng banlic depot and the rest ng laguna segment din.
@biocyber4544 Жыл бұрын
Yes po Sir, gagawan ko rin po yan ng discussion in the next videos po, last time I heard may mga nag site visit na sa Cabuyao area na mga representative ng contractor...facebook.com/CUDHAOCabuyaoCity/posts/pfbid0xrKY61dn9CWE2uczY3TNk1cLcxHjAHPp6wJ3QHGo6zBHn7dYfeGyW3GCjRg6kJKbl
@biocyber4544 Жыл бұрын
and heres another update po newsinfo.inquirer.net/1775918/construction-begins-for-p873-b-clark-laguna-railway-project
@redlancelot2634 Жыл бұрын
@@biocyber4544 sana agaran maumpisahan na yan thank you ulit sa mga updates
@redlancelot2634 Жыл бұрын
they supposed to start na rin ng construction but still waiting for updates dyan ang sabi kasi around the end of may ang start ng construction and end ng operation ng pnr calamba line but still may schedule parin yung pnr fb site ng mga trains
@redlancelot2634 Жыл бұрын
Great video🎉👌
@biocyber4544 Жыл бұрын
Thanks po for watching :)
@salvadorelmercabotageiii9148 Жыл бұрын
very curious about how the line would cross the Pasig River
@biocyber4544 Жыл бұрын
according po sa plans, sa eastern side ng current Padre Jacinto Zamora (Sta Mesa) Bridge, and utilizing Balanced Cantilever method it will be almost 60 feet from ground level, Thanks for watching
@salvadorelmercabotageiii9148 Жыл бұрын
@@biocyber4544 salamat din!!
@batangriles4244 Жыл бұрын
Easy as making bridge😊
@batangriles4244 Жыл бұрын
There are already 11 bridges crossing Pasig River
@riyalsantazo5386 Жыл бұрын
Tingin ko sa ilalim din ng lrt line 2 kse wala na yung magsaysay Bridge eh mas ok din
@geraldsionzon7235 Жыл бұрын
Sir yong CP 01 Phase 1 hindi pala kasama hanggang Tutuban iba na pala Contract Package non.
@biocyber4544 Жыл бұрын
Opo Sir, nagkaroon ng descoping from CP01 at isasama na yung isang station (Tutuban) sa CP 05...
@hottesteverything6545 Жыл бұрын
Mahaharangan po ba ng Espana Station ang P. Florentino Street?
@biocyber4544 Жыл бұрын
Yes po, pero magkakaroon ng "Pass Through" with drop-off facility at mga pedestrian crossings sa Florentino Street na directly nasa ilalim (ground Level) ng Espana Station
@dennisquicksign157 Жыл бұрын
ung middle track pala sa solis Y ay single track lang, so mag share ung mga train going to tutuban from blumentrit vice versa di kaya may posibility mag bangaan sila kung may train from tutuban going to blumentritt?
@biocyber4544 Жыл бұрын
..kung tutuusin parang Flag Stop na lang yung Tutuban Station pag Operational na yung NSCR (^_^') ... although from the wye, 2 tracks na upto Tutuban Station... may planong bypass track (viaduct) papuntang Solis from Tutuban, di na kakailanganing mag maniobra sa Blumentritt..(designated as "Future Connection")
@dennisquicksign157 Жыл бұрын
@@biocyber4544 ang nabasa ko kasi gagawing grand central station din si tutuban para sa 2 NSCR, PNR, LRT west ext. kung magiging bypass track lang si tutuban ung ibang train lines di na hihinto sa tutuban parang express line ba?
@biocyber4544 Жыл бұрын
..base doon sa Train Services Chart sa Pre-Bid Conference Presentation ng CP N-04 /N-05, mga commuter services lang ang dadaan sa Tutuban Station at di ito titigilan ng Commuter Express at Airport Express Services...
@dennisquicksign157 Жыл бұрын
@@biocyber4544 parang ganon pa rin pwede mag cause ng delay or bangaan ung 2 regular commuter trains from tutuban to blumentrit at isa pang regular commuter train going to tutuban from calamba.
@tanya.computer7188 Жыл бұрын
Indonesia company will build this section?
@biocyber4544 Жыл бұрын
Yes... Adhi Karya - PT PP Joint Venture for CP S-01
@alejaguilar9408 Жыл бұрын
What do u mean po by standard gauge? Meaning nakabukas lang ulit sya? So pwede pa rin pamahayan ng mga informal settlers yung kahabaan ng pnr na nasa baba
@biocyber4544 Жыл бұрын
it means mas magiging malapad yung pagitan ng 2 Riles (1,435 mm) (example yung ginagamit sa LRT ) kumpara sa "Narrow Gauge" (1,067 mm) na kasalukuyang gamit ng PNR...although yung plan na muling pag reconstruct sa At-Grade or ground level na linya ng PNR ay after na matapos ang NSCR...di pa nating sure kung lalagyan na ng bakod ang linya ng PNR sa time na yun...
@Blud2827 Жыл бұрын
Question lang Po matatamaan ba Yung mga Taga Paltok street Yung papunta ng Magsaysay boulevard Kasi nasa likod namin Yung NLEX - SLEX connector tapos Yung riles malapit na sa bahay namin 240 square meter Po Yung property namin
@biocyber4544 Жыл бұрын
yung karamihan po ng mga properties sa tabi ng paltok street sa may rail side ay makakasama po sa Project Right of way ng NSCR CP S-02 (base sa plans)... wala pa po bang nag aapproach sa inyo na representative ng DOTr regarding sa ROW or relocation?
@EiroBangtan Жыл бұрын
Magkakaroon po ba ng freight train ang PNR?
@biocyber4544 Жыл бұрын
opo sir, eto po yung pahayag ng DOTr: kzbin.info/www/bejne/l5-lY5mngbJqmq8
@paulallenpatriarca Жыл бұрын
may connection po ba na walkway sa sta.mesa station ng nscr sa pureza station ni LRT 2? Kung protected structure pala ng NHCP yung magsaysay bridge based sa final draft report ni JICA, bakit po giniba na siya ngayon? posbile kaya ma consider ulit yung Option 2 at 4 since pwede na dumaan sa ilalim si NSCR dahil wala nang magsaysay bridge? Sorry madaming tanong curious po talaga ako HAHAHAHAH
@biocyber4544 Жыл бұрын
they plan a connection with Pureza Station, although sa Drawing ay walang details about a walkway connection...about naman sa Sta Mesa area, upto now di pa nila pinapakita yung renders ng new design ng Sta Mesa Station, yung Height nun yung mag dedetermine kung anong option na yung iimplement nila :)
@paulallenpatriarca Жыл бұрын
@@biocyber4544 Mukhang impossible nga po ang walkway since more than 500m po ang layo ng sta.mesa station sa pureza. Sumasakay pa kami ng tricycle pag papasok.
@paulallenpatriarca Жыл бұрын
@@biocyber4544 Bale magiging magkapatong na cantilever bridge pala sila. Balanced cantilever bridge na din kasi yung ginamit kay line 2 sa area ng magsaysay brdige.
@paulallenpatriarca Жыл бұрын
@@biocyber4544 Thank you po ulit😄
@biocyber4544 Жыл бұрын
thanks po for always watching :)
@iaronbautista Жыл бұрын
Question lang sir may sinabi ba sa plano kung magkakaroon ng platform doors ang bawat station?
@biocyber4544 Жыл бұрын
Yes po, magkakaroon ng PSD ang buong NSCR System, MMSP at MRT 4
@iaronbautista Жыл бұрын
@@biocyber4544 nice, eh paano po yung sa lrt 1 and mrt7? May idea kayo sir?
@biocyber4544 Жыл бұрын
yun nga lang po, wala akong info kung magkakaroon ba eventually ng PSD ang MRT 7 at LRT 1... :(
@iaronbautista Жыл бұрын
@@biocyber4544 i see, thank you pa din sir. Last sir baka meron ka sample nung platform designs and per station designs ni nsrc baka pupwede post niyo rin po hehehe salamat sa info sir sobrang helpful
@millennialinmanila5621 Жыл бұрын
Meron daw psd ang MRT7
@marjonverzosa Жыл бұрын
Sir, ano ung effect ng phase 1 cp-05 na na-descope mula sa cp-01?
@biocyber4544 Жыл бұрын
eto po yung article from GMA News explaining the situation of NSCR CP 01... www.gmanetwork.com/news/money/companies/871513/dotr-dmci-taisei-withdraw-from-section-1-of-north-south-railway-contract-package-1/story/?fbclid=IwAR2RFXkQ1PsC_GqJFSxIaCr5Em3WKNgKtyIQRt9cudLY04b-4JKCpBMt-zU
@arizona7621 Жыл бұрын
Japanese po ba nag design yung structural nya?
@biocyber4544 Жыл бұрын
yes po :)
@riyalsantazo5386 Жыл бұрын
Gagamitin pa ba Yung riles ng tren sa baba ?
@biocyber4544 Жыл бұрын
yes po, it will eventually be converted to Standard Gauge at gagamitin ng Freight Service, Long Haul Services and possiby ng Local Commuter Service...
@espinosajuricbermudo4240 Жыл бұрын
Pano naman po gagawin sa ortigas subway station?
@biocyber4544 Жыл бұрын
Stay tuned po para sa video upload about that station :)
@marvinmanalo2021 Жыл бұрын
san link pwede makita yung mga redesign stations?
@biocyber4544 Жыл бұрын
..hindi po pinublish publicly ng DOTr yung mga plans ng Station Redesigns para sa NSCR South Commuter.... although naipakita po yung mga presentations ng 3d renders nung ibang stations during the contract signing ng CP S01 - S03...
@geraldsionzon7235 Жыл бұрын
Sir mga kailan mag start yan CP S-01?
@biocyber4544 Жыл бұрын
..maaari po sa 4th quarter ng taon na ito, ...it will coincide sa stop operations ng PNR (Tutuban to Alabang Section)
@geraldsionzon7235 Жыл бұрын
@@biocyber4544 Yong Muntinlupa to Calamba Sir?
@biocyber4544 Жыл бұрын
..supposed to be ay mas mauuna yung Alabang to Calamaba Section (around May) although di pa nag stop operation yung PNR and wala pang actual mobilization on the ground :(
@jetgo1010 Жыл бұрын
Mukhang sa 2024 pa uumpisahan yang S01 package dahil nag pullout na DMCI sa project na Yan dahil di raw nila ma access yang construction area dahil sa Nlex slex construction,I bi bid at uli ng Dotr Yan kaya lalong made delayed tutuban to Valenzuela depot ang construction.
@owheng Жыл бұрын
May link ka sir ng layout plan?
@biocyber4544 Жыл бұрын
...nasa website po ng DOTr, under "Procurement" then "Foreign Assisted Projects" 👍