Create Detailed Manhour S-Curve from Primavera P6 to Excel | Manpower Stacked Histogram from P6

  Рет қаралды 14,595

SoftEdemy

SoftEdemy

Күн бұрын

Пікірлер: 24
@phemmy2008
@phemmy2008 Жыл бұрын
You are doing great, keep it up
@SoftEdemy
@SoftEdemy Жыл бұрын
Thanks for your comment
@samarahmad4784
@samarahmad4784 Жыл бұрын
Great 👍
@SoftEdemy
@SoftEdemy Жыл бұрын
Thanks for your comment
@reginaldibenne6875
@reginaldibenne6875 4 күн бұрын
Awesome! Can we still use this method to create Cashflow S-curve?
@SoftEdemy
@SoftEdemy 4 күн бұрын
@reginaldibenne6875 cash flow is something else . I Don't have video of it. The graph and calculation is different
@reginaldibenne6875
@reginaldibenne6875 4 күн бұрын
@@SoftEdemy Okay sir
@samarahmad4784
@samarahmad4784 Жыл бұрын
Sir if possible would you please make a video on cost control ... Like cash flow to create CBS etc
@SoftEdemy
@SoftEdemy Жыл бұрын
Sure ,Noted I will make a detailed video on cash flow.
@agbasogankem7164
@agbasogankem7164 6 ай бұрын
Thanks for the training. Is it possible for you to write out these steps? I want to replicate what you just explained by following the steps.
@SoftEdemy
@SoftEdemy 6 ай бұрын
Check captions
@denisagba3955
@denisagba3955 9 ай бұрын
I set up my plan with budgeted manhours against our total resources, but everyday the resources will be changing as some workers won’t be available. How do I show this constant change in the resources daily and how do I create an S curve for this?
@SoftEdemy
@SoftEdemy 9 ай бұрын
Create Planned vs actual histogram for manpower
@denisagba3955
@denisagba3955 9 ай бұрын
@@SoftEdemy So you mean changing the resources each day as they work and comparing it against the baseline resources on primavera? Or just doing it on excel?
@SoftEdemy
@SoftEdemy 9 ай бұрын
@denisagba3955 apply same actual on both. Show same curve in both P6 and excel
@SoftEdemy
@SoftEdemy 9 ай бұрын
@denisagba3955 you can only show actual histogram separately its also acceptable.
@SoftEdemy
@SoftEdemy 9 ай бұрын
@denisagba3955 you can only show actual histogram separately its also acceptable.
@user-kx1yt4vm6l
@user-kx1yt4vm6l 9 ай бұрын
how to convert budgeted units to manpower?
@SoftEdemy
@SoftEdemy 9 ай бұрын
P6 have default column as budgeted labor units .
@omeryasin23
@omeryasin23 9 ай бұрын
@@SoftEdemy I want to show manpower (Not labor units) on a monthly basis. How can I do that?
@SoftEdemy
@SoftEdemy 9 ай бұрын
@omeryasin23 resource assignment > Group and sort by > Resources . Change the user preferences to what measures do you want like Manpower by day per hour per week or per month. Choose the unit which you need to show in resource assignment. Every resource per day assignment will be their. Make sure while doing all this your schedule is loaded with resources as per their productivity rates . Thanks. For monthly basis change user preferences units to month and time scale should be also in month
Manpower Resource Loading including S-curve in Primavera P6
13:30
Box jumping challenge, who stepped on the trap? #FunnyFamily #PartyGames
00:31
Family Games Media
Рет қаралды 31 МЛН
How to make S Curve in Microsoft Project | S Curve in Project Management
12:57
Interactive S-Curve in Power BI in 17 Minutes ! - P6 to Power BI
17:57
Shrief El Gendy - Planning Engineer
Рет қаралды 1,3 М.