Hello Andy. Is that Pedestrian foot bridge to the station permanent, or are they going to provide a more substantial ( Lift wheel chair friendly acess and more?)
@burridgeandy8Ай бұрын
@@markchristopher8515 it certainly is not in use till the works finished
@pytradesfxАй бұрын
@markchristopher8515 they're building a new elevated footbridge over the tracks. It'll run from the far end of the new building and will cross into the old station at roof level. Lifts, escalators, stairs at either side. If you pause at about 1.58 and you can see them just starting to prepare groundwork either side of the tracks where the supporting columns will be constructed. And at @2.31 - the open space in the top floor of the building, (top left of the gable end if you were looking at it square on), that's where the new bridge will connect to the building. think its scheduled to go in for dec/jan