Amazing progress in only eight days. Looking forward to seeing this phase completed and would be great to see the next phase. Thanks Jack and Neil.
@phillipbuckross47592 жыл бұрын
Definitely want to see phase 4 videos, been following this from the very beginning and would love to see it all to the very end
@rosscorr2 жыл бұрын
Here I am on the other side of world (Sydney, Australia) learning about a project I knew nothing about in a place I most likely will never visit and I am fascinated! Your videos are better than any of the construction/engineering shows you see on television with mindless narration and endless recapitulation with largely pointless graphics etc. Absolutely fantastic work, not only the project but your insightful and beautifully produced videos. Thanks!
@TonyCarnell2 жыл бұрын
Loving these updates. Please keep them coming
@richardbedford28352 жыл бұрын
We want to see phase four. This development has been most interesting. A big well done to all those involved.
@riichardstratford31852 жыл бұрын
Yes please into phase 4. Brilliant update keep them coming.
@bernardsmith13292 жыл бұрын
This has been and still is a fascinating project to follow, even more so due to the live camera overlooking the scene. If it's possible to follow phase 4 in a similar manner, please do! Thanks for all your efforts!
@CoastCams2472 жыл бұрын
Thanks Bernard. Not sure if there will be any available locations for a camera, but if there is, one will be going in.
@stephenbonser21342 жыл бұрын
These vlogs are much better than Coronation Street so please continue making them into phase four. Thank you guys, great job as always.
@DavidShepheard2 жыл бұрын
I'm really enjoying these videos. The part of the BAM works, further along the coast, might not be in a place that is easily accessible by visitors, but I hope that you continue to go with Jack from BAM to continue the story of this important ciivil engineering project.
@richardpettet99962 жыл бұрын
I look forward to the updates and enjoy them so please carry on for phase 4. I watch sea breeze on a daily basis but the railway line blocks sight of much of the work and some takes place out of sight, so a regular update is much appreciated.
@anthonynimbus75302 жыл бұрын
Brilliant update and Jack and his team have done an amazing job in not just the last eight days, but over the last couple of years as well. Hope the weather holds out for you all and the storms are not as violent as in 2014. Look forwards to seeing it for myself.
@SaltleyLad2 жыл бұрын
We love to see phase four. It can be very relaxing watching the tides and as always watching someone else working 😂
@CoastCams2472 жыл бұрын
Glad you enjoy it!
@anniemac30752 жыл бұрын
I'd love to see Phase lV please, thoroughly enjoy these videos. That yellow robot is amazing to watch, making a potentially dangerous job much safer. The work they've done on this seawall is so impressive. 👍
@robertwoolley86322 жыл бұрын
Yes, that is some impressive progress in eight days and some key milestones also planned for in the near future. I do hope that the extra work introduced by planning will make a real noticeable benefit to the final project. Like other comments, I would very much like to see phase 4 and eventually the Holcombe sea wall project.
@terencelycett18792 жыл бұрын
Thank you for the update. It's amazing to see how much progress has been made in only 8 days. Well done to all the hard work these workers have done. Looking forward to the next update. Once again thank you.
@CoastCams2472 жыл бұрын
Thank you!
@thrift1542 жыл бұрын
Phase 4 yes please. Fascinating watching the progress and I need a regular fix of Jack's accent, being marooned as I am here in NZ far from my native Wolves 😀
@pattir95912 жыл бұрын
Fantastic video! I enjoy the updates very much and would love to see it continue to Phase 4. Jack and his crew are doing an awesome job. And Neil too in bringing to us the progress! Thank you for all your hard work!!
@AnthonyFurnival2 жыл бұрын
Would absolutely love to see phase 4
@jamesgallagher46552 жыл бұрын
Excellent content with so much progress over the last eight days. Phase 4 please without a doubt.
@Gina-vu4mu2 жыл бұрын
Thanks for the updates really injoyed this one too 👍👍👍
@CoastCams2472 жыл бұрын
Glad you enjoyed it
@johnallen88082 жыл бұрын
Phase 4 - yes please!
@wackerone72532 жыл бұрын
Thanks to all concerned with these videos, so informative and interesting. Looking forward to the next one.
@CoastCams2472 жыл бұрын
Glad you like them!
@raysimmonds65232 жыл бұрын
Brilliant work Jack and the guys! Looking forward to Phase 4 Video
@CoastCams2472 жыл бұрын
Coming soon!
@lala77uk2 жыл бұрын
I have been watching all the work from the beginning mostly on cam but this last week I finally managed to get down there and walked along the beach wall and it was great ... O would love to see the rest of the work that is being done, and hopfully in the next year or 2 Ill can get back down there to walk on the finished wall. (I thought it was me in the background on the old sea wall but I dont think it was)
@francismewton32762 жыл бұрын
Phase 4 should be interesting ,one question for you guys-in time what with high tides and storms sand levels on the beach will mount up against the new sea wall !will you have people clearing the sand away to make it harder for the sea to rush over like it has in the past ? Thought I'd throw that out there .tell what though it's been wonderful to watch these videos as I live down in Camborne........keep up the good and all of you keep safe 🤗🙂
@CoastCams2472 жыл бұрын
They will only be clearing the rocks from the beach. The sand will manage itself. :-)
@francismewton32762 жыл бұрын
Ok seems reasonable thanks guys 🤗
@tardismole2 жыл бұрын
It amazes me how much can be done in eight days. Looking forward to Phase Four.
@PeterGaunt2 жыл бұрын
It's remarkable what's being done here. Certainly something to be proud of if you've been working on it. I know someone who has been at the sharp end of building Crossrail and he seems to love just watching people actually use it while thinking 'I helped make this'. The same must apply here. Definitely carry the series on into Phase 4 and if there's a Phase 5 after that.
@Sharron-Idol2 жыл бұрын
Wow the Orange Army have certainly got a shift on! - 'Great work. - I'd love to see phase 4 happening too. Thanks for the videos to date.
@stevekeiretsu2 жыл бұрын
Not from Dawlish but I love these videos, Jack must be the best example of 'corporate outreach' I've seen, I hope his employers are giving him a worthy bonus for his positive PR output on top of whatever his official standard job is (PM?)
@chrisbeaven65212 жыл бұрын
I had walked past all of this earlier this week when I had been staying down in Dawlish and can see this is definitely an interesting project. I had spent seven and a half years with BAM until I had left there in 2019. Despite all of this work, it still remains the only rail route into the South West and no signs that the Okehampton to Tavistock ink is ever going to be built as an alternative route.
@sydwoods.woodsendjunction94922 жыл бұрын
great video thats amazing progress in just 8 days really looking forward to phase 4 Jack & his team are working wonders brilliant job lads keep it up must say looks as though the weather has been kind to you as well . looking forward to the next video thanks for sharing well done Neil& Jack 👍😄
@trevormarshallsay67222 жыл бұрын
Well done to Jack and the team brilliant update please continue with yours tours on the next phase
@17snooker2 жыл бұрын
How much has all of the project has cost to date
@malcolmadams10512 жыл бұрын
What is happening to the rusty old bridge?
@johnlaw33232 жыл бұрын
Phase 4 yes please. Many thanks for sharing.
@philtucker12242 жыл бұрын
I love the clean lines and strength in the design of the whole sea wall project. It’s quality infrastructure work like this that gives satisfaction to many and vis a vis attracts further money and investment to an area. This sort of work can kick start a renaissance to a charming but relatively dormant area. Thank you for sharing 🙏
@johnlang41982 жыл бұрын
Brilliant project to follow. Has been fascinating. Thanks to Network Rail and the contractors for giving you such access.
@Rogermalaya2 жыл бұрын
Will the steel railway bridge be replaced?
@whoops6072 жыл бұрын
Is the bridge to be repainted as part of the contract?
@CoastCams2472 жыл бұрын
Sadly not.
@stuartbroome12582 жыл бұрын
Very interesting once again. I am rather surprised that the tides are still expected to still come up under the railway bridge? Surely it would have been better to prevent this still happening. It also means of course that a goodly amount of beach will also be washed up! Another question is, are there any preventative measures to stop people/children walking up the water course and under the bridge? The "old rusty bridge" happens to be an original GWR structure . Not sure if it is listed. Great video once again. Be nice if subscribers could get exclusive video of it all from start to finish Neil, just an idea.
@TheDaf95xf2 жыл бұрын
Looking absolutely fantastic guys 👍🏻 It’ll be a real shame when it’s all completely finished 😞 Following this project has been inspiring to say the least 🤩
@Stuart_Johnson_Solutions2 жыл бұрын
Deffo want to see this through to completion
@bogieman96542 жыл бұрын
Definitely want to continue into phase 4!
@davewoods38492 жыл бұрын
what are they doing to the bridge,and whats this lift they are talking about ?
@CoastCams2472 жыл бұрын
Info here at 7:20 kzbin.info/www/bejne/gJqbm5-BobGgjtU
@maypoleman2 жыл бұрын
Are there any plans to smarten up the railway bridge as this looks very rusty and could do with a clean up. Great video thank you
@andrewreynolds49492 жыл бұрын
Nothing has been announced as far as I’ve read
@KOI-nz3vn2 жыл бұрын
Awesome 🤗 Thanks guys👍
@lesleygilbert19452 жыл бұрын
I visited Dawlish for a few hours last summer. Went onto the station and took a photo of the railway lines and saw some works being carried out. I wondered what was going on - now I know! I look forward to your next video. Is there a photo/model of the plans showing how things will look when finished?
@andrewreynolds49492 жыл бұрын
There is a CGI model on Network Rail’s page “Dawlish Sea Wall - Section Two”
@lesleygilbert19452 жыл бұрын
@@andrewreynolds4949 Will check it out later - thanks for your reply 👍
@kitchbaby2 жыл бұрын
@@andrewreynolds4949 Sorry to trouble you - have you got a link for the cgi model? Not sure where to find it.
@andrewreynolds49492 жыл бұрын
@@kitchbaby I think KZbin often deletes posts with links nowadays because of copious amounts of unwanted bot spam, but on Network Rail's website there is a page called "Dawlish sea wall - section two" with that animation. It's the first result I get for "dawlish sea wall network rail", but it can also be found by searching for 'Dawlish Sea Wall' internally on Network Rail's website. The CGI model is under a section called "Our Plans". I will see if I can get the direct link to the page.
@lesleygilbert19452 жыл бұрын
@@andrewreynolds4949 Thanks for your reply. With your key words I managed to find the cgi model - very impressive. I was curious about the stream that runs into the sea and wondered if the sea floats back inland when it's high tide? I've seen an older video of sea surf coming through the tunnel. Also I forget I was using my Kitchaby account when asking for help - silly me. Once again thanks for your helpful reply. I've subscribed so I'll be kept up to date.
@richardpettet99962 жыл бұрын
Do the chaps work 24 hrs sometimes as occasionally the lights on and they are working at 11pm. Yet on other nights like Sunday there was no sign of life. Is it to do with the tide?
@666gregor2 жыл бұрын
With all this new shiny construction, are there plans to smarten up the railway bridge also?
@andrewreynolds49492 жыл бұрын
Nothing has been announced as far as I’ve read
@mikewilde2 жыл бұрын
Love watching these updates, so interesting and informative, as some others have asked, are the cast iron rail bridges being treated for corrosion ?
@CoastCams2472 жыл бұрын
Not as part of this contract. On the sea side there is a bridge being built now that will cover it. the town side will still show. We hope something will be done by Network Rail when the sea wall is complete as it will stand out.
@kathymcbride24252 жыл бұрын
part 4 please
@markrudd9172 жыл бұрын
Will there be any paint finish to the railway bridge once you’re nearing completion. The rust streaks will stand out like a sore thumb against the polished concrete and Portuguese granite surfaces your installing!
@andrewreynolds49492 жыл бұрын
That’s not included in this contract
@lynyarwood79772 жыл бұрын
While watching the Video seeing all the safety practices It reminded me how many lives were lost in Brunels time digging the tunnels between Dawlish and Teignmouth.
@barboror2 жыл бұрын
Can someone please tell us. We are intrigued. Where does the concrete come from? who is mixing it up , Where the cement mixer How come its on Tap so to speak
@martinwright58832 жыл бұрын
Have Been following these videos but aren't they going to replace the rusty railway bridge? as it at the moment it looks an eyesore.
@CoastCams2472 жыл бұрын
Not as part of this contract. On the sea side there is a bridge being built now that will cover it. The town side will still show. We hope something will be done by Network Rail when the sea wall is complete as it will stand out.
@martinwright58832 жыл бұрын
@@CoastCams247 Thanks For info
@sjr999r2 жыл бұрын
Great work as always gents. Will the ‘rail authority’ paint the railway bridge? Or have they handed that job over to BAM?
@andrewreynolds49492 жыл бұрын
There’s no work on the rail bridge included in the contract
@michaelhussey8572 жыл бұрын
More please
@cliveluff66222 жыл бұрын
How did that red digger get up to the lift shaft area?
@CoastCams2472 жыл бұрын
They had a 200 tonne crane carry it over the railway at the weekend. Sadly I couldn't make it to film.
@JohnnyMotel992 жыл бұрын
I just realised from the design renders that the old cast iron bridge will remain and not be replaced. It must still be a viable structure after decades of abuse from the sea!
@DavidShepheard2 жыл бұрын
I believe that the railway was put in by Brunell. So they won't get rid of anything, that they don't need to replace, as it's all got history that might help attract tourists to the area. But, you can clearly see, from old clips of storms, that Brunell had zero idea that climate change would be coming to attack what he built here, and that we need some modern stuff to back up what was put in.
@JohnnyMotel992 жыл бұрын
@@DavidShepheard I imagine they will give it a fresh coat of paint though!
@andrewreynolds49492 жыл бұрын
This particular bridge went in in the 1920s or 1930s I think
@felixthecleaner88432 жыл бұрын
'..an awesome amount of work!
@maxplanck90552 жыл бұрын
Good to see civil engineering that is looking after sea level rise and flooding, something that is becoming more common, this should create a safe railway for Devon for generations into the 22nd century now ✌️❤️🇬🇧
@Liamtrainspotter402 жыл бұрын
Bro when u finish I wanna go to that beach again
@fletch612 жыл бұрын
Yes to phase 4.
@CoastCams2472 жыл бұрын
Thanks.
@westyham12 жыл бұрын
Will all these videos be put together and screened on national TV, just like they did with the Elizabeth line as its very informative and I bet most people would be pleased to see before and after.
@CoastCams2472 жыл бұрын
I plan on making a full length documentary about the sea wall when it's complete.
@westyham12 жыл бұрын
@@CoastCams247 thanks very much and keep up with the great informative videos 👍
@robertboughton112 жыл бұрын
I live the fancy wall.
@johncasey13142 жыл бұрын
Really interesting.
@terenceburchett61222 жыл бұрын
Mr Canute said " waste of money"!
@terrysmythe44832 жыл бұрын
Did anyone suffer from the noise of the works that were carried around midnight on thursday night? Was that neccesary and acceptable?
@johncamp25672 жыл бұрын
SECTION FOUR!! SECTION FOUR!! SECTION FOUR!!
@tonys16362 жыл бұрын
Phase 4 yes please, if the Planners stop sticking their oar in after they signed it off, planners? Couldn't plan a booze up in a brewery. What is said about things designed by a commitee? Johnie Cash and 'One Piece at a Time' springs to mind.
@andrewreynolds49492 жыл бұрын
I read the local council wanted the footbridge to look more like the existing building than the original design
@peterjaniceforan30802 жыл бұрын
👍
@englishcitystone16632 жыл бұрын
Gruesome concrete monstrosity. Probably necessary to preserve the coastal route but utterly incongruous with the landscape and out of character with the Dawlish ambience. Not to mention the carbon footprint. Did any authorities consider an inland route for the main line and leaving the existing for local use?
@jaycraze38532 жыл бұрын
Very impreesive
@fredgreen24312 жыл бұрын
My god this is gonna be ugly.
@andrewreynolds49492 жыл бұрын
Looks good to me
@jameskrell43922 жыл бұрын
Good grief, what an abortion. How have they allowed such vandalism.
@sgthree2 жыл бұрын
It’s called civil engineering designed to the quality required to protect the vital (and only) rail link to the far south west of the country, and the town. It is neither an ‘abortion’, as you put it, nor is it vandalism.
@jameskrell43922 жыл бұрын
@@sgthree You need to go to Specsavers.
@sgthree2 жыл бұрын
This project is not about the aesthetic (which is very subjective), but it is about protecting the town and infrastructure which is way more important. I am sure when the original wall was built people thought that was ugly too. It is happening, you need to get over it.
@derekambler2 жыл бұрын
How much would it have cost to update the line via Oakhampton to Plymouth without all this palaver?
@sgthree2 жыл бұрын
@@derekambler Loads. Plus when they tried to run a 'heavy' main line train (class 43 'HST' train', rather than light weight local Sprinter trains, they couldn't manage the hills and slipped on the tracks. You seem to be oblivious to the importance of this route along the coast to the local and wider economy. The south Devon coast would be under threat as the cliffs are protected in several places by the sea wall, which is what these works are for.
@geraldtomson81052 жыл бұрын
Hi very good progress, What is it that tickles you whenever Jack mentions any depths of any piles drilled out to as you always have a little giggle?
@CoastCams2472 жыл бұрын
I find it quite mind blowing that they go so deep.