Рет қаралды 6,384
Continuing this small house pad project. Great weather and a long day of work. I finish excavating for the pad and start to build it up with crushed 0-30mm gravel and laying drainage pipes. Also fixing a small pad by the lake for a hot tub with 8-16mm gravel!
I can not use the footage of me loading materials because I would need to blur the whole screen due to all the packages!
Excavator Neuson 6003 tiltrotator rotortilt
Compactor: Swepac fr85