sir baka pwede kayo gumawa ng video para sa structural analysis for building permit para sa fencing po, with stability check against over turning on footing design
@philipcalilan78424 ай бұрын
Sir meron na po ba kayo nahanap?
@AxlJonDelRosarioАй бұрын
hello sir thank you for this video. but can I ask if the safety factors is computed or constant? if that is constant where can i find that reference.
@jsdesign_engineeringtv3633Ай бұрын
@@AxlJonDelRosario I use NSCP 2015. Thanks
@dinotranssialatvia76168 ай бұрын
Thank you sir
@paperdragon83983 ай бұрын
Hi sir, bakit sa Peq for overturning hindi pang triangular loading yung ginawa niyo kahit inverted triangle siya? Tapos yung sa sliding naman ginamitan niyo ng 2/3h, paclarify naman po. Thank you!
@bordzilla8 ай бұрын
Hi sir! How to prepare structural form for building permit
@jhonpaulcardinal59807 ай бұрын
sir san po ginamit yung Cfs sa analysis?
@1989ENgVic8 ай бұрын
How about kh motion of structure itself?
@CIVILENGINEERINGTOPPICKS8 ай бұрын
pwede po kaya gumamit ng base shear V sa nscp 208.8.3? tapos divide po yung base shear sa mass ng rt wall, para maging horizontal acceleration?
@bobotesparagoza90616 ай бұрын
Sir baka pwede.kayo gumawa ng col/ ftng design ng chb fence with 2 or 3 meters backfill on the inner part.of the lot..thanks
@bonniejr.bellido28975 ай бұрын
Hello po sir, ask ko lang po, kung saturated ang soil at swampy yung exterior side ng retaining wall, ano po kaya yung assumption ng saturated unit weight ng soil at ano po kaya yung recommended depth ng foundation/footing from swampy soil natural grade level. Thanks po sir.
@jsdesign_engineeringtv36335 ай бұрын
@@bonniejr.bellido2897 I suggest sheet piles na gamitin nyo kung fully saturated ang ground. Posible maging mas expensive kung retaining wall. Thanks
@Shadddybb28 күн бұрын
Good day sir ask ko lang po saan nanggaling yung 1.75 sa x bar yung 90(1.75)
@jsdesign_engineeringtv363328 күн бұрын
@@Shadddybb 90 weight of fill, 1.75 came from 2m base - 0.25 stem thickness. Thanks
@Shadddybb28 күн бұрын
Thank you sir❤
@laurencedolorosa38525 ай бұрын
Sir ask lang, pag ba sa retaining wall need din lagyan both right & left side? Or yung rear side lang since andun ang slope? Salamat
@jsdesign_engineeringtv36335 ай бұрын
@@laurencedolorosa3852 You need to reinforced both but sometimes rebars on side facing soil are the main bars, meaning the spacing is closer and bigger. Thanks
@laurencedolorosa38525 ай бұрын
@@jsdesign_engineeringtv3633 ah okay po gets, pero yung sa start po ng retaining wall sa side ay from the slope or kailangan from the front connected sa front fence? salamat
@jsdesign_engineeringtv36335 ай бұрын
@@laurencedolorosa3852 you mean fence on top ret.wall? you can place it at the center
@laurencedolorosa38525 ай бұрын
@@jsdesign_engineeringtv3633 ah okay, where the slope started?
@jeffmv888 ай бұрын
sir ask lng sir, dba yung 15Kn/m3 is dapat 1530 kg/m3?
@jsdesign_engineeringtv36338 ай бұрын
Yes
@jasontagalag39915 ай бұрын
Good day, pwde po mahingi contact details, I have project retaining wall, I need design and plan details for retaining wall
@jsdesign_engineeringtv36335 ай бұрын
@@jasontagalag3991 sure, I'll check with my partner if they will be able to assess the location based from their previous data. Let me know the vincinity please. Thanks