been enjoying the series so far. Just fyi i have a ton of USRA based locomotives starting 1918 from 2-8-2, 4-8-2, 2-10-2, and 4-6-2 to fill alot of gaps.
@ultimatearchitect2 ай бұрын
Glad to hear you're enjoying it! I have seen a couple of those and I believe I already have a few downloaded, but I'll look to add more. Thanks for making them, it really helps bring the game to life.
@ZjednoczeniGM2 ай бұрын
35:38 is a mistake , the way you set it up makes it that you will load 80% of the available space of each , meaning even at "full" of both you will still have a few empty cars. set one of the resource to 50% and leave the other at 100 so that the other will take all the available space in the train
@ultimatearchitect2 ай бұрын
I was under the impression that was the maximum allowable load for that resource on the train so as long as it adds up to more than 100% then the train can leave fully loaded. I could be wrong though so thanks for bringing that to my attention, I'll look into that a little more closely.
@ronphil66662 ай бұрын
Good video, but why you dont use more the water ways with so much water ? You can also adjust the water ways when necessary.
@ultimatearchitect2 ай бұрын
Good point, I do want to use them more but trains have been much more beneficial at the moment with some of these projects. I do have plans for lines that can utilize boats more but I can only work on one thing at a time.