11-13-2013 Dietrich Idaho Water Project. Lay pipe, backfill, excavate, install culvert, install fire hydrant.
Пікірлер: 9
@jefffuchs26672 жыл бұрын
Tip: when laying C900, lay pipe with the numbers facing up. Also, before backfilling coat the valve in grease and wrap with wax tap and then 10 mil tape. This will preserve the valve and help the next guy out when they have to make repairs to the pipe/valve
@tombo5520015 жыл бұрын
Nice job and using tracer wire
@wolffry10 жыл бұрын
Where is your trenching protection?
@jfreeman38725 жыл бұрын
Litteraly stole the words from my thoughts
@devalm94922 жыл бұрын
My guess is because water main lines are only 4 feet under ground. I think trench protection only applies to certain trenches and after specific depths.
@omasis192 жыл бұрын
For what dast shallow as fak
@richardcameron3681 Жыл бұрын
Videos like this should be automatically deleted when safety and detailed pipe treatments are not used correctly why pass that along for others to follow and get hurt or killed and a pipe system with only portions of the manufactures recommended treatment