Difference between Agile model and V model | LTS Group

  Рет қаралды 19,849

LTS Group

LTS Group

Күн бұрын

Пікірлер: 5
@Guesswhokk
@Guesswhokk Жыл бұрын
1:11 I dispute this, you are look at "testing" as a 'process' and not as an end output. 1 - Remember the 3 classic conundrum for any given projects: "time" , "quality" and "cost" 2 - Agile is best suited to small org, when innovation / risks level are unknown and has not reach it "technological ceiling yet" (so no reference) and thus "time" and "cost" are harder to gauge as it need "iterative designs" (include testing) to achieve quality products, less appropriate in a large org with multi departments when traceability become difficult to manage. e.g Intel chip design, This is why moores law cannot be adhered to using Agile. 3 - Vee is used in large systems if Agile couldn't handle it, when risks & innovation are "pre-determined" (but in real world risk is usually unknown) and thus "time, cost & quality" have clearer outcome if risks is pre-determined, but it only as good as your "risk prediction" and if large number of high risks issues start comes up during development, it will seriously mess up on project planning like protected cost, time and quality. This is why Vee is not often used especially the product want to achieve not innovation. e.g. NASA TRL systems, using design iteration from good ole knowledge base aluminium and rocket technology borrowed from decades ago like space shuttle, rather than Space X using clean-slate material like Stainless for rocketry. It possible for both system to exist in engineering capacity when an organisation is big enough to adopt both, when Agile can assign to "conceptual phase" once found the right rough mix for product launch, then it can be transfer to Vee in the "development phase" as NPD milestones" It rare to find a company willing to merge Vee and Agile and doing it "effectively", usually out of necessity when limited resource was a factor (not based on size of the company), because it not easily understood or implement, because this mixed structure can be very specific to the product. But once it found the right mix, it can work far better and more efficient than either of the two stock method. e.g. scrum process
@thanhluudang4877
@thanhluudang4877 3 жыл бұрын
is it true that 5 sprints in Agile be equal to 1 cycle of V model ? in reality, a project can have 10 cycles of V model from beginning til the end. can we say that 1 cycle of V model be equal to 1 sprint ?
@maheshbabu637
@maheshbabu637 Жыл бұрын
hi, is V model and Agile applicable for same project at a time?
@danyeo1490
@danyeo1490 8 ай бұрын
I disagree with the majority of this video.
@chandpriyankara
@chandpriyankara 9 ай бұрын
This is wrong
Chapter 2.2 Waterfall, Parallel, and V-model Approaches
8:16
Geoffrey Hubona
Рет қаралды 11 М.
Mom had to stand up for the whole family!❤️😍😁
00:39
小丑揭穿坏人的阴谋 #小丑 #天使 #shorts
00:35
好人小丑
Рет қаралды 12 МЛН
Он улетел, но обещал вернуться...
00:30
ПРЕМИЯ ДАРВИНА
Рет қаралды 4,9 МЛН
Agile vs Waterfall: Choosing Your Methodology
5:28
OeLean
Рет қаралды 341 М.
Software Development Life Cycle: Explained
12:31
AltexSoft
Рет қаралды 49 М.
Agile Systems Engineering @ Volkswagen
22:33
Vector Consulting Services
Рет қаралды 3,2 М.
Verification and Validation model in SDLC, It's advantages and disadvantages
15:45
What is Model-Based Systems Engineering (MBSE)?
5:27
TECHNIA
Рет қаралды 42 М.
Difference between Agile Model and V-Model | Agile Model Vs V-Model
9:04
Automation Testing Insider
Рет қаралды 1,7 М.
Software Testing Tutorial #9 - V Model in Software Engineering
13:39
Software Testing Mentor
Рет қаралды 51 М.
Mom had to stand up for the whole family!❤️😍😁
00:39