EICR FAIL- Maximum demand

  Рет қаралды 77,672

David Savery Electrical Services

David Savery Electrical Services

Күн бұрын

An off the cuff on-site vid where I look at how maximum demand has played its part in this installation failing its condition report.
Warning: Contains no humour or strong language. Sorry, but I was on a customer site!
*Correction* At 12:09 I say the SWA has used "brown for neutral", I did of course mean 'black'.
There's a whole shopping list of problems at this site, but only a few are mentioned here, so don't yell at me if you spot something I don't mention on camera as it was the maximum demand I wanted to talk about in this vid!
A follow up video was posted 03 August 2019:
• EICR failure site - ri...

Пікірлер: 334
@MysticShiv3r
@MysticShiv3r 5 жыл бұрын
Never have I watched a video of a spark whom is so well spoken and informative. This is a cracking vid mate. You've earned yourself a subscriber. This comes from a fellow spark :)
@dsesuk
@dsesuk 5 жыл бұрын
Very kind of you to say so sir.
@kangtheconqueror
@kangtheconqueror 2 жыл бұрын
Ha, ha, ha... watch a few more videos from DS and you may have to edit the bit about being 'well spoken'!! Isn't that right, Dave? All joking aside though, I watch a lot of your vids David and consider your opinion to hold a great deal of sway. Your knowledge, together with your industry ethics, is essential viewing in my opinion. Plus, your banter makes for great viewing entertainment!!
@rogerlawson6031
@rogerlawson6031 5 жыл бұрын
As an ex emeb / cn / wpd mains engineer I'd be very surprised indeed if the one amp is actually leakage current from a phase conductor unless there's a solid fault to unbonded metalwork that has an impedance of circa 240 ohms 'within the ground' and the nigh on 0.25kW of heat energy is dissipated into mother earth, or a phase conductor is touching damp brickwork etc. (possibly via unnbonded metalwork) and the heat is being absorbed by the building structure. I've had both of these situations to sort out when customers were getting shocks when outside their property because of the potential gradient across sections of brickwork and across the surface of the ground. I mention heat absorption because circa 240W of power loss at one 'point' location would be most likely to quickly raise the temperature to a level where a fire would result. It's perhaps more likely that the problem is a neutral to earth fault within the property, the 1A of current in the main earth connection to the lead sheath of the service cable being some proportion of the neutral current of the whole installation because there wil be a tendency for the neutral bar to be at a slightly higher potential than the earth connection of the 'tns' type supply at this property - hence all of the instalation neutral current will be 'attracted' to some degree to flow from the neutral bar, along the neutral of the faulty circuit and via the fault into the cpc or bonded metalwork etc, back to the main earth bar in the consumer unit and then via the main earth lead to the lead sheath of the service cable....which will (should!) have an almost zero impedance link back to the supply transformer neutral point. The crossed colours on the armoured cable also has me wondering - is the neutral of that circuit actually connected to the earth bar of the consumer unit and the cpc conected to the neutral bar? - that would also explain what's happening - the 1A would be the neutral current from the load of that circuit!
@tasmedic
@tasmedic 5 жыл бұрын
That, everyone, is the voice of experience and wisdom. I hope this person teaches sparkys how to wire things up. There are a lot of crap ideas in the regulations, and a lot of good ways of doing things which aren't in the regulations, too. I get the impression this engineer knows the ins and outs of both these situations.
@jackflavell3908
@jackflavell3908 5 жыл бұрын
This is also needs to be taught to all jointers/linesman who havent got a clue what ohms law is
@richardwallace3477
@richardwallace3477 5 жыл бұрын
Tip: Instead of taking your earth leakage from the earth cable (which could potentially include currents from other properties) put your clamp meter around the two tails and you will get a true reading of the leakage from the installation - ie the difference between the current in and the current out.
@rusrus29
@rusrus29 5 жыл бұрын
I blimin love your videos!! you have a unique and addictive channel." I love how you go through the fault testing side in such detail" ! it's a channel that stands out from the rest on here....Thank you..
@dsesuk
@dsesuk 5 жыл бұрын
Thanks Russel, very kid of you to say so.
@coralbay00
@coralbay00 4 жыл бұрын
What do you charge per circuit if you don't mind me asking. I've been caught out a few times with a small dwelling that has several circuits. 👍
@christastic100
@christastic100 5 жыл бұрын
From my experience that cut out is a 60 amp version. Even then it takes a long period of time to blow on overloads such as it is . As for the split ring main I use a signal generator to trace the runs . Can be very good for finding cpc and other breaks too . Great to watch
@davidclark3603
@davidclark3603 5 жыл бұрын
That was a very interesting video David. I did years of testing many moons ago and it can be very taxing and tricky. Well done on spotting all the faults. It’s not easy, especially when you’ve got heaps of extensions, additions and alterations galore. I agree, R.C.B.O.s throughout. That’s my basic choice these days. It would be good to see a metal clad fire proof board in there. I hope you get the work, I think you’ll do a nice neat and tidy job of it. I hope you do a video of the shower switch you mentioned. That sounds very interesting. I don’t know about them? Thanks again for the video David. Have a good weekend!
@dsesuk
@dsesuk 5 жыл бұрын
Thanks David, I might see if I can push out that shower priority board video tomorrow (hangover pending).
@pauldavies9709
@pauldavies9709 5 жыл бұрын
Good video mate. Would be good to do a follow up to this video with the new DB and investigate the earth leakage source.
@dsesuk
@dsesuk 5 жыл бұрын
Was thinking the same. Might be a while before it's all done and dusted at that site, although I think we'll get the work.
@jgoddard0757
@jgoddard0757 5 жыл бұрын
I agree, the final outcome would be interesting!
@floorpizza8074
@floorpizza8074 5 жыл бұрын
@@dsesuk I hope you do. Would be nice to see them get a proper installation instead of the mess they currently have. Edit: Actually, I see this is an older video. Did you get the job?
@dsesuk
@dsesuk 5 жыл бұрын
@@floorpizza8074 Yes, we've been appointed for the work, but the new board still hasn't gone in. We've since been back for some remedial work to allow the upgrade to go ahead, but the delay is down to scheduling and to our waiting for some new consumer unit models to come out as manufacturers switch from type AC to type A RCBO's. We should hopefully be doing the board change in the next couple of weeks.
@floorpizza8074
@floorpizza8074 5 жыл бұрын
@@dsesuk Good to hear! Love it when guys that do high quality work (and take great pride in it) get the job. I know you're really busy, but would love to see a bit of video from that job. :)
@albertkleyn111
@albertkleyn111 4 жыл бұрын
Excellent, as always. If I did not live in the boondocks in Ireland, every job would go to you and Nigel. Albert.
@dsesuk
@dsesuk 4 жыл бұрын
Thanks Albert!
@alantorrance6153
@alantorrance6153 4 жыл бұрын
Very interesting, especially the ramifications as to potential disastrous failures and the widespread remedial work needed. Headaches - big ones for the new owner.
@DaC-lt5mk
@DaC-lt5mk 5 жыл бұрын
Nice to see someone working properly
@paulteasdale7112
@paulteasdale7112 5 жыл бұрын
Excellent video David, amazing what you find! Thanks for sharing.
@dsesuk
@dsesuk 5 жыл бұрын
I found a can of Guinness in this case!
@adriantyler1820
@adriantyler1820 5 жыл бұрын
I purchased a 5 bedroom villa with pool in Thailand. When any of the 3 instantaneous water heaters are used, the lights go dim. The voltage at KWH falls from 220V to 200V. Luckily KWH is in the garden in a box with my neighbor"s and get to make an actual ring main when I do repair. They have same size cables and under voltage problem on our private estate. KWH are for from private distribution board.
@laernulienlaernulienlaernu8953
@laernulienlaernulienlaernu8953 5 жыл бұрын
I’m not surprised that the incoming cable has overheated! It was probably originally serving a 3 bed house with maybe an electric cooker and an immersion heater plus a few sockets and lights
@matthaddock6490
@matthaddock6490 5 жыл бұрын
David great video, as a learner this give me a good inside what you come across these discrepancies when doing a test 👍
@simonmaverick9201
@simonmaverick9201 3 жыл бұрын
That's a fishy comment....
@matthaddock6490
@matthaddock6490 3 жыл бұрын
@@simonmaverick9201 What a comedian!
@rossmurdoch7870
@rossmurdoch7870 2 жыл бұрын
Hi David, Second time watching this one. Really good advice. One observation, I think you should not be confident applying the correct cost for the jobs you offer to do. Professional advice and honest evaluation is a commodity which must have a higher value than a rushed cheap fix which will not stand the test of time. The people buying this place will have a couple of grand to protect their investment, I would assume. Get your bill in, and don't miss them for time spent saving their new home from burning to the ground.
@stephenpower9572
@stephenpower9572 5 жыл бұрын
Another great video. Nice to see a video of you out on site. Look forward to seeing the device for shower load. Thanks for sharing.
@chrisjinks5197
@chrisjinks5197 5 жыл бұрын
I do EICRs most days good to see someone posting videos about the daily rubbish we see. Keep up the good work!
@dsesuk
@dsesuk 5 жыл бұрын
Thank you for that compliment
@simonbmr
@simonbmr 4 жыл бұрын
And this is the best reason I have ever seen for EICRs. It often seems like a pointless paperwork exercise, but then you find this mess.
@RWATraineeElectrician
@RWATraineeElectrician 4 жыл бұрын
Was the previous spark playing "pin the tail on the donkey" when wiring the extension?
@horatiofluffytop
@horatiofluffytop 5 жыл бұрын
Really interesting and informative video, thanks for a great Chanel David.
@sdgelectronics
@sdgelectronics 5 жыл бұрын
Earth current is probably from another property with a failed CNE. You should clamp the two live conductors at the same time to determine the origin of the fault
@kangtheconqueror
@kangtheconqueror 5 жыл бұрын
'Exciting' be blowed! This video is fascinating. Cheers David.
@dsesuk
@dsesuk 5 жыл бұрын
The ones I think are really boring and waffle-filled always seem to do better than those I've spent a wodge of time and effort on!
@ashmanelectricalservices4318
@ashmanelectricalservices4318 5 жыл бұрын
I can remember about 10 years back when staying at a Park Resort chalet, the electric shower and cooker having some kind of 2 way control switch, meaning when one was being used, the other couldn't. I guess it was their way of preventing potential overload.
@rossmurdoch7870
@rossmurdoch7870 4 жыл бұрын
Hi David, Would it be worth asking for a 3 phase supply and reworking from there? Regards
@mahrous65
@mahrous65 3 жыл бұрын
yes u right i did not say any thing about the max demand and diversity how to solve the demand .the rcd do not solve the high demand.
@rogerlawson6031
@rogerlawson6031 5 жыл бұрын
Having looked again at the video, david says that it isn't a simple case of 'crossed cores' on the armoured cable, (and the circuit appears to be rcbo protected) so l hope he gets the job of sorting out why there's an amp of current in the earth lead and lets us know the answer...RL.
@CrazySparkie63
@CrazySparkie63 5 жыл бұрын
Around 4.8 KWh a day leaking to Earth. I worst I found was over 32A leaking to Earth in old stables at a riding school in Kent (100mA RCD fried)!
@Christian-dc1sb
@Christian-dc1sb 5 жыл бұрын
on alot of livery yards and riding schools as well the electrics are awful so that doesn't surprise me at all
@matthewcollis-long5233
@matthewcollis-long5233 5 жыл бұрын
Excellent and informative stuff DSES!! Keep it coming please.
@Pentium100MHz
@Pentium100MHz 5 жыл бұрын
Interesting that you can get high power single phase line in the UK. In Lithuania, if you want more than 5-10kW, you will get three phases.
@dsesuk
@dsesuk 5 жыл бұрын
You find few overhead cables here unless you go out into the countryside, it's all underground in the urban and suburban areas. I guess when they were rebuilding after WW2, they figured up to 100A single phase ought to be enough for anybody (domestically), although in these days of instantaneous hot water heating, induction hobs and electric vehicles it's all looking a bit creaky. A lot of digging up can be required to upgrade to a three-phase supply.
@the_real_hislordship
@the_real_hislordship 5 жыл бұрын
100 amp single phase? It amazes me that three phase isn't used more often with so many large loads. One shower per phase, split the other loads as well. Reduce voltage drop. Here (South Africa) I have 3 x 60A incoming (now it's normally 3 x 80A).
@nrg-5003
@nrg-5003 4 жыл бұрын
It will amaze you even more that the dno's give each property a diversity of only 2kw when designing their network. So on a typical housing estate with about 150 homes all capaple of drawing 60 to 100 amp each!! Is all fed from only a 500kva or 1mva transformer which is only capable of delivering around 700 to 1.45ka! If that is not diversity i don't know what is, and amazingly it all works!
@andrewstone841
@andrewstone841 5 жыл бұрын
Great video thanks David! Seen exactly the shower thing a couple of times now with multiple en-suite hmo conversions. The subject needs more attention to it, especially on the generally terrible EICR form, would love to see how you tackled detailing this on the cert.
@dsesuk
@dsesuk 5 жыл бұрын
Hi Andrew. It is an awful form, I quite agree! The failed RCD I've coded as a C2 in item 4.8 (manual operation of circuit breakers and RCD's) because it won't react in the event of a leakage fault, and as a C1 in item 4.19 (RCD's provided for additional protection) as it's handling more current than it was designed for, so all bets are off as to how it will react. The failed RCD also shows up elsewhere on the checklist of course (items 5.12.1, 5.12.3, 5.12.5 and 6.1). As the demand of the installation is potentially more than the service head should be handling, I've put that as a C3 in item 1.2. It could perhaps be argued that a C1 or C2 applies, but it's been coping for the past fifteen years, and besides the common sight of the tarry insulation having leaked out, there's no outward evidence of it being unable to cope. We have an enquiry in with WPD about replacing the head to 100A PME with an isolator, and we have the go-ahead for a board change. One of the showers will be decommissioned as they're turning that bathroom into a utility room, so that should help the situation!
@andrewstone841
@andrewstone841 5 жыл бұрын
Thanks for the detail David. Ar the difficulties of trying to express a problem with something that’s apparently been fine for an age, but good call on the service head item i feel. I would have probably gone with just C2s for the rcd but can’t fault you! At least it seems your client is interested in getting it improved, that’s 90% of the battle in my experience, and if you’re board changing with 2 showers you can get the rcd load sorted even if they don’t want to spring for rcbo’s. Not a bad result at all. Top notch work as always mate!
@LAsparkTVWireTestLimited
@LAsparkTVWireTestLimited 5 жыл бұрын
Really interesting. Thanks, I didn't know you could cook 63amp RCDs without them operating. I don't think I knew that anyway. It's never been an issue. Also didn't know you could get a device to stop two loads being used at once. And good points about more than one lighting cct hanging off an MCB. I always forget to check that before I price things up, and it did once completely snooker me, although I got the money back in other ways as they booked me for the rewire and board change. But it weren't funny. I hate lighting circuits, especially with dimmers and intermediate switches etc, you're supposed to test every damn bit of them, and it just takes for ever.
@benjackson1498
@benjackson1498 5 жыл бұрын
Really interesting mate 👌great content as always, really enjoy your chanel keep up the good work
@olafdossier7897
@olafdossier7897 5 жыл бұрын
Your videos are scarey A F. I don't want to touch any electrical switch or socket in my house anymore - fantastic content, how can you only have 6.3K subs?
@dsesuk
@dsesuk 5 жыл бұрын
It's a combination of bad language and uncontrollable nasal hair that keeps the subscribers away!
@carletonmould2001
@carletonmould2001 4 жыл бұрын
Hi Dave great video. I came back and watched this video after testing a single dwelling with over 30 circuits... If you don't mind me asking, what was the outcome in the end..?
@MartiA1973
@MartiA1973 5 жыл бұрын
Really useful. When are home buyers going to start asking for these reports before purchase.
@dsesuk
@dsesuk 5 жыл бұрын
I know. You wouldn't pay top price for a car without an MOT, yet people just aren't aware of the checks they should be doing before forking out five or six figure sums for a house.
@cameronloggenberg2867
@cameronloggenberg2867 5 жыл бұрын
In South Africa it is a legal requirement to have the full electrics tested, you also have to have the water and woodwork (roofs, floor joists). Means that cowboys cannot get away with things.
@curtisj2165
@curtisj2165 5 жыл бұрын
I thought it was required as part of the house buyers pack
@dsesuk
@dsesuk 5 жыл бұрын
@@curtisj2165 I believe this sort of thing was required as part of the Home Information Pack in England and Wales, but then the HIPs were scrapped a few years ago. We still come across plenty of people who ask us to perform an EICR after they've splashed out and moved in.
@matthewcollis-long5233
@matthewcollis-long5233 5 жыл бұрын
David Savery Electrical Services o
@idontthinkso2058
@idontthinkso2058 2 жыл бұрын
Even with the service cable changed and new 100amp bs 88 .the circiuts demand current is still over 100 amp supply .. 3 showers 40 amp each ..NO DIVERSITY ON SHOWERS SO 3X 40 120 A ? . A 3 PHASE SUPPLY IS REQUIRED ..
@LAsparkTVWireTestLimited
@LAsparkTVWireTestLimited 6 ай бұрын
Just watched this again 4 years since I first watched it. I will never tire of listening to your geriatric mumblings.
@sandman873
@sandman873 5 жыл бұрын
Do you get fries with an EIC?
@ursusmaritimus7159
@ursusmaritimus7159 5 жыл бұрын
Interesting video, thanks. It reminds me of an installation I was slightly involved in (I was doing the data cabling only) around fifteen years ago which had two electric showers. The system was TNS and the head really old with ceramic fuse carriers. The supply was strangely two-phase and neutral (with only one phase in use) and the electrician suggested getting the DNO to supply a second head for the second phase, with a separate CU connected to it for the second shower. What I didn’t get is that assuming the service head fuses are to protect the supply cable, surely the neutral would be carrying the combined current of both phases? The DNO guys seemed perfectly happy with the arrangement when they came (I recall the guy touching the neutral in the head with his finger and quipping “polarity test”!). Interested to know any thoughts…
@projectbuild9784
@projectbuild9784 5 жыл бұрын
The different phases are out of phase so when one is peaking the other is 120 degrees out of phase. They never put peak power out at the same time so the neutral isn't dealing with two synchronised phases which is the problem you seem to be imagining.
@petehiggins33
@petehiggins33 5 жыл бұрын
@@projectbuild9784 It's even better than that. If you add together the neutral currents from two different phases each being say 10A then the amplitude of the combined current is also 10A (and not 20A). This assumes sinusoidal currents which heavy loads will be.
@samuelfellows6923
@samuelfellows6923 5 жыл бұрын
Your description of the property - two pre-war houses turned into a mansion - if the price goes into the millions I call them that.
@tent7014
@tent7014 2 жыл бұрын
In the Shire of Will the Bard, I would have expected some Quipping and Japping
@gd-bq7em
@gd-bq7em 2 жыл бұрын
Hi David a friend of mine once went to a house with 4 electric showers. So he called napit and spoke to an adviser and he said he ust to work Blackpool area and ust to see that situation often and his answer was there is no way all 4 showers could run at the same time any way because the water pressure would not be strong enough. And it kind of makes sense I know if I run my shower and some one turns tap on there water just trickles out of the shower. What's your take on it. I have never actually tested to see if the shower still pulls the 32 amp if water not coming through at full pressure
@henrytwigger2245
@henrytwigger2245 5 жыл бұрын
Electric showers are an excuse for bad plumbing ! Apart from the maximum demand issue, there's also the peak rate issue. If you are going to heat water with electricity, which is expensive anyway, why no use off peak electricity to heat a tank of water at night ? Modern insulated tanks stay hot for a long time. You need to keep the electric shower on constantly while you are showering, to stabilize the temperature. While you're soaping up, you'll need to direct the shower away and waste hot water. With a thermostatic mixing valve you can get a quick blast of hot water to wet down; stop and soap up; and get another quick blast to wash off. You'll use less water in the shower and save dosh ! But you'll need a mains pressure, stainless steel hot water tank. But really everyone should have one of those nowadays. When the new smart electricity meters take off, using up cheep rate electricity is going to be even more important. When the wind blows and all the wind turbines come on-line, there's a glut of power. So why not get ready to take advantage of it by boosting your hot water on the cheep ? That's if this technology ever arrives !
@ashmanelectricalservices4318
@ashmanelectricalservices4318 5 жыл бұрын
Yes the RCD main switch is fried but has the DNO service fuse ever blown... It looks as though the service cable has suffered the most as a result of the overloading.
@sdgelectronics
@sdgelectronics 5 жыл бұрын
No degradation is apparent on the service cable.This is just standard PILC with a cloth outer covering.
@TheEulerID
@TheEulerID 5 жыл бұрын
Given the state of that system, it's almost like there isn't a working fuse in there.
@robertchapman4726
@robertchapman4726 3 жыл бұрын
As soon as you see an SwA terminated without a gland the alarm for shoddy work and incompetence should ring loud.
@maxdunning5612
@maxdunning5612 Жыл бұрын
just been testing a few properties with the issue regarding maximum demand, what did you code it as ive not been able to find any info from bpg4 ot any forums, last resort will be to call niceic
@dsesuk
@dsesuk Жыл бұрын
If I think too much current is being pulled through a device not rated for it, then I'd code it C1 Max. This isn't a fault current issue, it's the everyday design current that hasn't been factored in here.
@johnschlesinger2009
@johnschlesinger2009 5 жыл бұрын
The tails going to the cutout look like 16mm. I bet the cutout is 60A, which explains the overheating. Those things can carry 80A for quite a while. The board is a real mess!
@dsesuk
@dsesuk 5 жыл бұрын
Not pretty is it?! It is 25mm on the tails there. We had Western Power out yesterday who have confirmed it's a 100A fuse, the earthing is properly soldered onto the sheath and the cutout is in good nick. They've rubber-stamped it as fit for purpose to carry on, so that's some good news for the homeowner!
@simonmaverick9201
@simonmaverick9201 3 жыл бұрын
Isn't it possible to have the showers off a separate incomer tail supply fitted by the electricity supplier??
@jasonhowe1697
@jasonhowe1697 5 жыл бұрын
by looking at that likely ex gov 50's-60's house with retro fitted rcd that is only really designed internally in the rcd itself to hold 1 circuit unlike the 10-20 amp breakers of yester year where you overload to a degree before frying the break.. with the the rcd breakers are built today it is 1 point to 1 circuit I suspect with the granny flat modification you are looking at the power co to come and install a 200-300 amp service split between each home area.. looking at the extension i would say dyi bodge job within the life of the home my opinion i'd do an electrical gut and bring it into todays code rather leave it alone and do a date of install grandfathered mess the main rcd should be around 100-150 amps covering 2 30 amp circuits 2-6 15 amp circuits wall circuits, 2-3 10 amp circuits for lights..
@jasonhowe1697
@jasonhowe1697 5 жыл бұрын
@Cupid Stunt in australia skinny 80 amp main breaker with 2 x30 amp breakers feeding 3 single points and 4 double points and the other feeding 3-4 double points on 15 amp domestic wiring . 1 circuit has 2x outside singles, 1 internal single (fridge), 2 points double (bedroom) 2 points bathroom 1x double washer/dryer 20 amps draw, fridge 10-15 amps draw.. on an 15amp domestic wire.. @240watts mains though the basic point that the point to save cash 2xc15s were used where they could of wired each point individually given the amount of real estate in the fuse box.. Main point I was getting at most likely would been better if this was an ex council rental would of been to gut completely than mess around with the bullshit of grandfathered date of install which leaves people that don't know any better of blinders on see no evil, report no evil.. I am a firm believer of meet or exceed minimum electrical safety codes of today than live in the grandfathered systems of date of install.. as it leaves the consumer in a legal time mess
@michaellack5139
@michaellack5139 5 жыл бұрын
I did a test on a split load just yesterday and found all power rhs and all lights on lhs.. come on sparkys really....if you don’t know what your doing just leave it
@artisanelectrics
@artisanelectrics 5 жыл бұрын
Great video!
@dsesuk
@dsesuk 5 жыл бұрын
I need to follow your example of filming on site more!
@rogerbean393
@rogerbean393 5 жыл бұрын
Hi there , quality videos, thank you. Do you like the TIS MFT Pro ? Noticed you had a Metrel in another video. What’s you preference and why ?
@dsesuk
@dsesuk 5 жыл бұрын
Thanks Roger, I have a Metrel MI3100s, a Megger MFT1552, a Fluke 1651B and the TIS MFT Pro just because I like my toys! They're all fine instruments, and I can work with any of them. The Fluke was retired as it lacks an auto RCD test and I was getting some odd readings occasionally on the resistance function. The Megger was my original tester and still works, but I now keep it in a secondary box that is used only when additional personnel are working with us. The MFT Pro fits in my main tool box so is my everyday machine for basic faultfinding, and the Metrel is my calibrated machine used for the EICR and initial verification work. I prefer the Metrel over all the other testers simply because it displays more information at-a-glance. The voltage between line, neutral and earth is always on the screen regardless of the selected test, the Max Zs value for the selected protective device is shown on the display when loop testing so you can see how close you are to the limit, it supports phase rotation unlike my Megger and Fluke models and it works well with the neck strap (I can't figure how the TIS is supposed to be worn!) It also has a good clear display with nice big numbers and can be placed on charge without having to extract the batteries unlike all the others. The TIS machine has a couple of functions the Metrel lacks - PQA and earth leakage, but you need an expensive accessory to make use of them. I have one here, and will do a video showing it in action soon. The TIS has updateable firmware, so there may be an update in the future which allows it to do a couple of the things the Metrel currently does, e.g. show the max Zs for the selected device (it knows the number as it issues a pass/fail when testing, so there's no reason why it shouldn't display it for the operators reference), and show either the voltage or a warning of a voltage when one is present and the menu screen is selected (at present, it's the only tester that doesn't display any indication of live connection when first switched on, you have to enter one of the menus first). The TIS is the only tester of my bunch which can store results for later download - a feature I don't use!
@martynfulcher7386
@martynfulcher7386 5 жыл бұрын
David Savery Electrical Services o
@rogerbean393
@rogerbean393 5 жыл бұрын
David Thanks for reply , just brought a TIS voltage indicator after just viewing the video. Like you I have a megger/fluke and a metrel Like the touch screen. Think I might buy the Pro as it’s been a good month. Love the humour and knowledge base.
@dsesuk
@dsesuk 5 жыл бұрын
@@rogerbean393 Blimey Roger, now I'm getting worried that I'm influencing you to spend too much on the toys!
@ottoschless4115
@ottoschless4115 5 жыл бұрын
Maximum demand can be alleviated slightly with led lighting, new energy consumption appliances and going to gas hot water. Correct , split the sub circuit rcd to rcbo's. It is not to wiring rules to have multiple circuits on an individual rcd now.
@dsesuk
@dsesuk 5 жыл бұрын
LED lighting is a no-brainer, gas appliances are fine, so long as you accept that gas is on the wane and will cost a lot more a few years from now (there will be many switching from gas to electricity in the future). The wiring regs do still permit the use of RCD's for multiple circuits however, in fact, 18th Edition introduced a new reg specifically stating this, 531.3.5.2, although the implementation on this site is poor.
@ottoschless4115
@ottoschless4115 5 жыл бұрын
@@dsesuk My work is in Australia and rcd circuit protection cannot be greater than a 50/50 ratio. In other words if you have 4 power circuits then they have to be on a 2 to 2 rcd ratio and not 1 rcd for all. I have found recently with the more reasonable price of rcbo's that the majority of customers will go with all individual circuit protection on light and power circuits. We normally install a 3 phase service line and there is no problem with max. demand issues. It seems the installation there has not been inspected by the regulatory authority. Probably a cash job.
@dsesuk
@dsesuk 5 жыл бұрын
@@ottoschless4115 Ah, well you probably have more sensible rules than us - the regs here didn't even acknowledge the RCD issue until last year's 18th Edition, and even then it seems to rubber-stamp it rather than recommending a ratio. We're mainly single phase domestically here, and with most services underground that isn't going to change easily. As for regulatory authorities, there are none. This was probably all done by the builder rather than an electrician, no certificates, no warranties, nobody checking until it's all too late!
@ottoschless4115
@ottoschless4115 5 жыл бұрын
@@dsesuk Thanks for your reply. The electrical trade there really needs some scrutiny, otherwise you will be inundated with cowboys. Hopefully nobody gets injured or killed by someones stupidity. If you are correct and the builder did it, ( electrically unlicensed ),well he will be severly fined and punished here. A notification of electrical work certificate must be given to the regulatory authoriry here when the connected load is increased with any additional installation. Anyway enjoy your work.
@brotheradam
@brotheradam 4 жыл бұрын
I like all the information. Wouldnt it be better to use two or even three split boards? One for running the other two and common areas? then one for the sections? Shouldnt the Granny flat have its board in the flat, like a Shed? So in effect, board one from the meter would be three outputs for other boards, plus common lights, second board for main house, third board for granny flat, ad fourth board being shed?
@brotheradam
@brotheradam 4 жыл бұрын
In USA and Jamaica the granny flat and the shed are usually on their own boards, as sub panels from the main board. In Jamaica actually a multifloor house is usually set with a panel on each floor, for that floor, and a main panel supplies those panels.
@dsesuk
@dsesuk 4 жыл бұрын
Hi Adam. Had this been my design when being extended/renovated, then I would have made a more logical layout of the circuits and perhaps used a sub-board to split things off. Sadly, what we found here was a builder's breakfast that someone had thrown in about fifteen years prior. A lack of planning and execution left the place with more circuits than were needed all coming back to an oversubscribed board in a single location. When we performed the remedials and upgraded the board in a later video, some of the circuits were combined into more logical arrangements, but without being able to damage finishes and renew large parts of the wiring, we were left with the single location and making the best of what we could.
@sosurko
@sosurko 5 жыл бұрын
Great video. Helps to see someone else carry out an EICR and how you investigate
@robertchapman4726
@robertchapman4726 3 жыл бұрын
If your adding circuits to an existing install and not even labeling the circuits....then you should ensure your spurs dont mark the floor whilst you are there
@graemebell8242
@graemebell8242 5 жыл бұрын
What is the story behind the McDonalds cap? I got more interested in the hat than the faults. Lol
@dsesuk
@dsesuk 5 жыл бұрын
Daughter #1 used to work there, so it's spare and...well... I needed a hat.
@graemebell8242
@graemebell8242 5 жыл бұрын
Fair play to you. 😂
@hannahranga
@hannahranga 5 жыл бұрын
I wonder if they meant to fit a 63A rcd and breaker combo (or that was fitted till they got fed up with the "nuisance" tripping and got a fuckwit who just replaced it with an rcd)
@Berkeloid0
@Berkeloid0 5 жыл бұрын
Apparently some people confuse the rating on the RCD thinking it will trip like a breaker at its rated current, not realising that RCDs don't work like that. I've seen a few videos where plain RCDs were installed as if they were MCBs/RCBOs, with the installer apparently not knowing the difference.
@Volt268
@Volt268 5 жыл бұрын
Is there a calculation that could be applied to work out the maximum demand?
@dsesuk
@dsesuk 5 жыл бұрын
See Appendix A of the OSG for maximum demand and diversity. It's a tricky one as you can never really be sure what the client will be connecting up, but unless you have known load values, then you assume 100W per lighting point (and can then take 66% of all lighting overall), 100% for the highest rated two electric showers/instantaneous water heaters, then 25% for any subsequent, 100% for the highest rated socket circuit, then 40% for each additional, 100% of any immersion heaters, cookers are 10A plus 30% of the remaining load plus an extra 5A if the control unit has a socket built in (etc.) I've also done it via measurement by using a clamp meter set to record a MAX value over a period of 24 hours average use. Usually you don't have to worry too much about it, unless you come across an installation with some heavy circuits such as multiple showers, car charge points etc. or if you get called out somewhere where the main fuse has blown without an obvious cause.
@Volt268
@Volt268 5 жыл бұрын
@@dsesuk sounds like a lot that I need to get my head around then. Will research more into it. Thanks for taking the time to reply. Great vids btw 👍🏻
@rogersmith9579
@rogersmith9579 5 жыл бұрын
I've got a copy of BS7671 and I've checked through the model forms but I can't find the place where the demand would need to be recorded or even where it is requested. Are you able to point it out?
@dsesuk
@dsesuk 5 жыл бұрын
On the EIC it's on page 415 of the blue book under Particulars of Installation Referred to in the Certificate. I don't think it's ever been on the model EICR, at least it wasn't in the preceding yellow or green books. The software I use to create certificates and reports, Easycert, differs from the model forms as most third party certs do, and it is something listed on an Easycert EICR. I don't know why it's not a part of the model EICR as it seems it ought to be.
@johnnevin5706
@johnnevin5706 4 жыл бұрын
Thank you, David, for your upload
@dsesuk
@dsesuk 4 жыл бұрын
Cheers John, thanks for your comments.
@carforumwanker
@carforumwanker 3 жыл бұрын
David , Can you tell us more about your MFT you are using ?
@dsesuk
@dsesuk 3 жыл бұрын
That's the TIS MFT Pro which I carry in my main toolbox. There's an older video of it where I was a bit sniffy about the thing after I bought it in 2018, but I get on rather well with it after a firmware update addressed the main issue I had at the time. I keep meaning to do a new video showing its cheaper sister, the MFT Eco, and how they compare, but there are never enough hours in the week.
@PJB71
@PJB71 5 жыл бұрын
David, that was an interesting video, sometimes it’s unbelievable what you actually find. I find it hard to believe that there’s 3 electric showers & 2 cooking circuits as well as everything else. In a domestic situation, sometimes, I just don’t want the rectifications. It would be interesting to see the EICR & your reasons behind the coding. It would also be interesting to see your plain English version to the client. I have found electricians tend to code & have different interpretations of the regs. I have installed a priority switch many years ago for 2 showers. I am curious to know what you would do with the third.
@dsesuk
@dsesuk 5 жыл бұрын
Thanks Patrick, you're right about the coding, it is open to interpretation and often down to the discretion of the inspector as to how something should be listed. Besides that, the report is an awful form and there's nothing in the inspection schedule checklist specifically about demand. Apart from the individual circuit faults, the failed RCD I've coded as a C2 in item 4.8 (manual operation of circuit breakers and RCD's) because it won't react in the event of a leakage fault, and as a C1 in item 4.19 (RCD's provided for additional protection) as it's handling more current than it was designed for, so all bets are off as to how it will react. The failed RCD also shows up elsewhere on the checklist of course (items 5.12.1, 5.12.3, 5.12.5 and 6.1). As the demand of the installation is potentially more than the service head should be handling, I've put that as a C3 in item 1.2. It could perhaps be argued that a C1 or C2 applies, but it's been coping for the past fifteen years, and besides the common sight of the tarry insulation having leaked out, there's no outward evidence of it being unable to cope. Other's may have coded things differently, but whichever way you look at it, the report deems the installation to be unsatisfactory with 23 observations listed, and the covering email that went with it had about 1200 words explaining the issues and what needs to be done. The client tells me she has already contacted Western Power about putting in a new 100A PME service and isolator after I sent her a link to their contact form, and she has asked me to go ahead with a board change plus remedials so we should have a follow-up video in a few weeks.
@mickbitchum4664
@mickbitchum4664 5 жыл бұрын
@@dsesuk congratulations on being awarded the remedial works.... I think🤔🤣
@dsesuk
@dsesuk 5 жыл бұрын
@@mickbitchum4664 It might be a bit of a short straw job!
@001Neal100
@001Neal100 5 жыл бұрын
Am I correct in my understanding that the leakage current can also come from switched on electronic devices as well as the low insulation resistance on the cables themselves?
@dsesuk
@dsesuk 5 жыл бұрын
Electronics can add to the leakage current which is why the likes of server rooms and I.T. suites need some design consideration (not that I've ever installed such).
@Lacking_something
@Lacking_something 3 жыл бұрын
When negotiating a reduction on the purchase price, would you expect vendor to pay for C1 and C2 remedial work?
@dsesuk
@dsesuk 3 жыл бұрын
Hi Neil. When we undertake EICR's, we try to provide a fair reflection on the state of things which can be tough if appointed by either the buyer or seller. The former can of course use it as a stick to beat down the price a little if things are bad, but if someone hasn't invested in maintaining their electrical installation over the years, then they shouldn't be too shocked if it bites them on the arse. It all depends on what the buyers plans are. C1/C2 issues probably aren't really issues if they plan a back-to-bricks refurbishment, but if they pretty much expect to move in and start living with things as-is, then they may want to negotiate on price if the seller has let things degrade or had a pop at poorly making modifications.
@matijakobas5369
@matijakobas5369 5 жыл бұрын
Hi i am wondering why in the UK households always use obe phase system while here in Croatia most of the houses use three phase(my little 75 sq m apatment too).That house you are working in seems huge and they only have single phase electric. Why? Isn't three phases much better. For instance cooker in Croatia is connected by three phase and it has same power as one in the UK, while using much less power per phase. Wouldn't bringing three phase into that house solve all the problems?
@dsesuk
@dsesuk 5 жыл бұрын
I don't know, but I assume it's down to cost. I don't know what it's like in Croatia, but unlike many countries our cabling infrastructure is largely all underground in the towns and cities, and I imagine that after World War II, those responsible for rebuilding figured 60-100A single phase ought to be enough for anyone domestically. Generally, it is, but where a service needs upgrading, a lot of digging is called for which is expensive on the public carriageway, and not very desirable for someone who has a smart looking driveway or garden in front of their house!
@KevinRoseYT
@KevinRoseYT 5 жыл бұрын
Would it not have been more accurate to measure the earth leakage by putting the clamp around the line and neutral and measuring the resulting difference between the two? By measuring the earthing conductor you only get part of the earth leakage current as the rest will be flowing through parallel earth paths like bonding, pipework etc.
@dsesuk
@dsesuk 5 жыл бұрын
Yes. I'll show that in a future video.
@londontrada
@londontrada 5 жыл бұрын
I thought Rik Mayall was dead.
@deankeys8185
@deankeys8185 4 жыл бұрын
will you have to remove some of the loading so it sits under the 100hrc main fuse ? be nice as i'm a crap 16th ed spark. great video's as i'm learning more now than when i was at tech.
@dsesuk
@dsesuk 4 жыл бұрын
Hi Dean. I'm always nice! Well, mostly. But yes, two of the electric showers will be booted out. One's going on the boiler, the other is being converted into a utility room.
@deanames5614
@deanames5614 4 жыл бұрын
@@dsesuk many thanks and keep up with the great vids
@mark90229
@mark90229 Жыл бұрын
Need priority switches for the showers
@MrPaul1f
@MrPaul1f 5 жыл бұрын
Great video, be great if you could do a follow up
@tasmedic
@tasmedic 5 жыл бұрын
Bring another phase in. It might sound clever to put a contacter in so only one shower can be used at a time, (which is all that is actually needed to do the job, nothing new or exciting about that) but if you do that, what exactly is the point of having more than one shower? You'll end up with the usual scenario of teenagers fighting over the shower at weekends. Which is probably why the extra showers were put in to start with.
@mondotv4216
@mondotv4216 5 жыл бұрын
Interesting how popular electric showers are in the UK. Do they actually save money over an off peak storage tank or is it purely done for convenience and space? In Australia we generally have instantaneous gas or gas or electric or even solar storage tanks. Of course we don’t have a ring system either so you’re probably wondering how we survive without getting electrocuted daily :)
@dsesuk
@dsesuk 5 жыл бұрын
It's a convenience thing I guess. Traditionally, people did have hot water tanks, but they're generally ripped out of our pokey little homes for more storage space. Electric showers are easy to install and can heat water on demand which makes them handy for a larger family environment. On a back-to-bricks refurb, a combi boiler which can heat the water via gas would be better. Don't knock your lack of rings, they're awful things, a throwback to WW2 that nobody else in the world bothers with. I don't install rings myself, they're for the old boys who won't change, or the cowboys who know no better!
@mondotv4216
@mondotv4216 5 жыл бұрын
David Savery Electrical Services Oh I know rings are a pain compared to a conventional radial circuit. Did they come about because of a shortage of copper in WW2?
@dsesuk
@dsesuk 5 жыл бұрын
@@mondotv4216 So Wikipedia tells me!
@andrewmayes3271
@andrewmayes3271 5 жыл бұрын
Great vid once again is there an easy way IE app or website to find out who the snow is for a property
@dsesuk
@dsesuk 5 жыл бұрын
One DNO lookup is here: www.energynetworks.org/info/faqs/who-is-my-network-operator.html
@stuartmc18
@stuartmc18 3 жыл бұрын
This EICR has possibly saved the property owner from a house fire!
@Roverturbo
@Roverturbo 4 жыл бұрын
I thought you had to contact the dno if wanting to connect two or more electric showers?
@dsesuk
@dsesuk 4 жыл бұрын
In theory, I think (and I may be wrong) that if your MD exceeds 60A then you're supposed to inform the DNO, but in practice I've never seen it done. The only time I inform the DNO of a load to be connected is on a car charger installation. Personally, I wouldn't recommend more than one electric shower on a 100A single phase installation, and if more than one is insisted on, then I'd advise a load sharing option such as the Garo product I spoke of in another video. I suspect that most installers just do what the client asks for, and to hell with the consequences because nobody is policing anything.
@peterfitzpatrick7032
@peterfitzpatrick7032 5 жыл бұрын
A question please Dave (or other qualified electrician)... should the sum total MCB amp rating never exceed the main service fuse or does diversity apply...e.g. is 60 amp service with 80 amp total MCBs allowed ?? It seems like a situation of overload would exist in this case if , theoretically, every MCB was at max load ??
@dsesuk
@dsesuk 5 жыл бұрын
Adding up the sum total of MCB ratings would blow maximum demand in most properties, so diversity is taken into account. Some circuits, such as those electric showers, are going to be taking near the rated value, but that's usually not the case with lighting and sockets. It can be tricky to work out, you could have two small houses, one with two socket circuits, one with a single socket circuit, but even if they had the same appliances and the same number of outlets, the one with two circuits would, on paper, have a higher maximum demand if calculated according to the regs.
@mickbitchum4664
@mickbitchum4664 5 жыл бұрын
Yes your right diversity should be applied, as you said if all mcbs were at full load they would exceed the rating of the main fuse in 99% of modern installations, most homes have a 32A circuit for cooker and a couple of 32A socket circuits, chuck in a 16A water heater and 2 x 6A lighting circuits and your way over the normal 100A single phase supply. Also many new homes are increasingly being fitted with 80A supplies so diversity is definitely needed. There are tables in the on-site guide for guidance on diversity but they are really outdated, especially with the influx of LED lamps and energy efficient appliances. Personally I think It's best to look around the property and check what lamps/appliances etc are in the home and calculate the demand that way
@mickbitchum4664
@mickbitchum4664 5 жыл бұрын
If I remember right John Ward did a good video a few years ago about maximum demand and Diversity which is worth a watch if your interested 👍
@tbohlsenNSWSSMRC
@tbohlsenNSWSSMRC 5 жыл бұрын
@@mickbitchum4664 kzbin.info/www/bejne/jaKTpoJ6rtWUfas
@dsesuk
@dsesuk 5 жыл бұрын
@@tbohlsenNSWSSMRC Thanks for that, I've seen a few of the great man's vids, but I don't think I've caught that one, so will tune in!
@KevinRoseYT
@KevinRoseYT 5 жыл бұрын
Are you sure that the brown has been used as the neutral at the RCBO? I think you've made a mistake. Remember that different RCBOs have their connections the other way round. The brown is at the front and going to the upper L terminal. The upper terminal is always the front and lower always the back irrespective of which one is L or N. The only swap is the grey and black.
@dsesuk
@dsesuk 5 жыл бұрын
Hi Kevin. That was a 'voice typo' addressed in the description; I said brown, but I meant black. I didn't notice the error until after upload which is why there is no on-screen correction.
@AllkoDH
@AllkoDH 5 жыл бұрын
Hey, thanks for this video. How does current leakage occur? How is it getting on that earth wire?
@dsesuk
@dsesuk 5 жыл бұрын
I'm not showing the current leakage measured properly here as others have commented, but where it is coming from this installation, it'll be either through appliances that have a natural leakage such as with some electronic equipment, or more likely through poor insulation resistance. Two of the socket circuits on this RCD have zero readings when I.R. testing, and if the RCD were operable then it would be tripping all over the place.
@richsand007
@richsand007 5 жыл бұрын
Great video, just wondered which form filling software you’re using? Thanks
@dsesuk
@dsesuk 5 жыл бұрын
Thanks. I'm using Easycert. I've been meaning to do some videos on using it for a while now, I'll try to get them out this month!
@richsand007
@richsand007 5 жыл бұрын
Yes that would be helpful if you get a chance as there’s not much on KZbin about it. I’ve had to stop using ELECSA online software, it’s just so bad now. Temporarily moved on to Electraform to keep my sanity!
@dsesuk
@dsesuk 5 жыл бұрын
Yeah, the CPS in-house solutions are poor. Electraform looks good, but they're pay by cert, and when I did the maths for the number of certs I issue in a year, I found sticking with Easycert was cheaper. It has some flaws, as I'm sure they all do, but I'll be starting work on those videos soon (it may be a three-part job), so watch this space!
@alinili5569
@alinili5569 5 жыл бұрын
People charge by the circuit looks like they do good works and proper and safe testing but people just say price or set price they don’t do test and check every points or they way they should do I noticed that for few years and lots of people go by price regardless of their safety and good jobs I charge 70 call out and 25 per circuit on domestic and three phase 90 and 35 per circuit and truly I don’t like to do EICR
@MrBanzoid
@MrBanzoid 5 жыл бұрын
Great vid. It explains a lot. Thanks and subscribed.
@markyd2633
@markyd2633 5 жыл бұрын
Now that was a very interesting vid......Thanks for that.......by the way I am being serious....enjoyed that
@dsesuk
@dsesuk 5 жыл бұрын
Thanks for the feedback!
@paullyons4624
@paullyons4624 5 жыл бұрын
Great vid. Would be good to see a video of the shower sharing thingy. You were in your element under there with all that alcohol
@dsesuk
@dsesuk 5 жыл бұрын
I couldn't touch a drop unfortunately! Yes, I'll get a vid uploaded of the shower switcher! It's high on my video to-do list because it should be quite quick and simple as I have one a metre from my desk!
@djryanking
@djryanking 4 жыл бұрын
When coming across properties where it looks like maximum demand will exceed the main breaker rating regularly, do you make a recommendation on the EICR for a three phase consumer unit to be installed ?
@dsesuk
@dsesuk 4 жыл бұрын
Hi Ryan. Getting three-phase into a property is no easy feat, nor is it cheap. Here it would involve digging up the driveway, and to be honest 100A single phase is enough if it's loaded correctly. I'd be more likely to look at reducing load such as by changing halogen lights to LED or decommissioning a shower, or shedding it by using a device like the Garo priority unit I blabbed on about in another video which, in my case, allows my car charger to share a circuit with an electric shower by ensuring only one can be in use at any one time.
@djryanking
@djryanking 4 жыл бұрын
David Savery Electrical Services I appreciate that, and a priority unit is probably the best option for economic reasons. If somebody is buying a £1 million house, I imagine money would not be as much an issue for them, and if they wanted to use several showers at the same time, and ovens etc, then I guess you would suggest it to them ?
@djryanking
@djryanking 4 жыл бұрын
David Savery Electrical Services Would there be any circumstances where you would suggest three phase ? Do you know the costs of the DNO to run a three phase supply into a property, it’s an area that interests me.
@dsesuk
@dsesuk 4 жыл бұрын
@@djryanking I don't know the costs I'm afraid. I know it's the best part of £1k just to relocate a service head, so I suspect beefing up a supply cable from the street into the property would command a pretty strong price tag.
@jasontrundell8349
@jasontrundell8349 5 жыл бұрын
good video mate informative and to the point well done
@90sw12
@90sw12 5 жыл бұрын
Great video. Really well explained 👍
@mohammedkhan5344
@mohammedkhan5344 5 жыл бұрын
This is For all those guys who ignored the electrical science in college ank kept saying it will never be useful. P=VI
@ef7480
@ef7480 4 жыл бұрын
Indeed.... VIR PIV,,,
@carlrobson5745
@carlrobson5745 2 жыл бұрын
Probably a builder lashed the board in who thimks he can do electrics as its only three wires in it 😵‍💫
@ArcanePath360
@ArcanePath360 5 жыл бұрын
What is the difference between EICR and NICEIC? I had a certificate for the latter when I bought my home but I've found nothing but horror shows all round the house. You wouldn't believe some of the things I've uncovered.
@dsesuk
@dsesuk 5 жыл бұрын
An EICR is an Electrical Installation Condition Report which is a process that may be undertaken by a suitably qualified and insured electrician to ascertain the current state and safety of your existing electrical installation and to compile a report compliant with that laid out by BS7671 showing the results of the test and inspection process. NICEIC are an accrediting body the same as NAPIT, Elecsa, Stroma, NAPIT et. al. Someone registered with an accrediting body should, in theory, know their onions, as continual assessment by that body should ensure they're working within their means. My company is accredited with NICEIC to undertake EICR work as I hold specific qualifications and professional indemnity insurance to do so. Someone else may be registered with another accrediting body to the same standard. That said, you'd be amazed at the crap reports we come across, both by chancers who aren't accredited at all, or by those who are for installation work only but not testing/inspection. If you think you've been short changed on an inspection by someone who is accredited, it may be worth speaking with the accreditation people on their helpline number or to have someone else cast a second opinion.
@ArcanePath360
@ArcanePath360 5 жыл бұрын
@@dsesuk Thanks. It was a number of years ago and I've put right most things myself as I went along, while my builder Dad did extensive work on the home, replacing walls, ceilings, floors etc. I saw things electrical wire running over heating pipes, an outlet spurred off the cooker socket and installed on the inside of a cooker extractor (where the steam from cooking passes directly over it) to power the fan, metal light switch face plates which aren't earthed, wires running out through the wall on the outside of the house, going in through the top of the junction box with a busted gland and cloth tape wrapped round it.... just off the top of my head. These all felt like one off things at the time I put right but they all added up to make me wonder what other sins are going on that I haven't seen. I did notice the old black and red wiring in the ceiling in parts of the house.
@TheEulerID
@TheEulerID 5 жыл бұрын
Get rid of the electric showers, put in shower pumps or, better, a mains pressure hot water storage system, like a Megaflow. Three 10 kW electric showers in a domestic premises is crazy, besides which, you don't even get a decent shower. More money, but the proper way to do it. Either that, or with two kitchens, three electric showers and all the rest, they'd better get the order in for three phase supply...
@dsesuk
@dsesuk 5 жыл бұрын
I agree, a Megaflow or similar would have been ideal, and it's a shame the previous owners and the idiot builder who converted the garage into a 'house within a house' with it's two additional showers and cooker just didn't think about it. It's difficult to retrofit now that we have fitted kitchens and (in much of the new section) a flat roof, so running new pipework would be tricky. Work is already underway to sort all this out though, WPD have been out and confirmed the head is in good nick and has a 100A fuse, one shower is being decommissioned as that bathroom is to be converted into a utility room and we'll be making some other changes, so a follow-up video in a few weeks should detail the differences.
@TheEulerID
@TheEulerID 5 жыл бұрын
@@dsesuk An excellent video by the way, but there was so much wrong with that installation it's one of those what on earth were they thinking of moments. It was an electrical fire waiting to happen.
@adrianwint6177
@adrianwint6177 5 жыл бұрын
Your "earth leakage" test is flawed. You are measuring the current in the main earthing conductor with the bonding still connected on what appears to be a PME system. You are measuring diverted network neutral currents which will exist in a healthy system. Repeat your test by clamping both meter tails into the current clamp & see if you get the same result.
@dsesuk
@dsesuk 5 жыл бұрын
It's not PME, but off camera I did check with the bonding off and via the tails. Results were similar, so I went with what was easier to demonstrate. I take your point though.
@anwah100
@anwah100 5 жыл бұрын
Its not pme
@johnwaby4321
@johnwaby4321 4 жыл бұрын
Don't you just love circuits not labelled up . And some that just say plugs with no location indicated.
@michaelwhite28
@michaelwhite28 5 жыл бұрын
I enjoyed it. Why are you wearing a cap under the stairs? are you allowed to be there?
@dsesuk
@dsesuk 5 жыл бұрын
Keep the cobwebs out of my hair!
@Berkeloid0
@Berkeloid0 5 жыл бұрын
I find these videos really interesting. Here in Australia it's illegal to do any electrical work unless you've done a four-year electrical apprenticeship, and I used to think that was overkill but I'm beginning to think it's not a bad idea, as it weeds out all those people who can't be bothered to properly learn what they are doing.
@curtisj2165
@curtisj2165 5 жыл бұрын
When you filled out the condition report what figure did you put for maximum demand?
@dsesuk
@dsesuk 5 жыл бұрын
An excellent question, and one I cannot answer tonight as I haven't compiled the full report yet. I have the raw data for all circuits, so I'll go through it this weekend as I prepare the paperwork for submission to the client along with the invoice. I'll let you know when I've worked it out!
@dsesuk
@dsesuk 5 жыл бұрын
Hi Curtis. Have just done the calcs as I prepare the report. The figure on paper is 236 Amps. It isn't really that high, but because there are five 32A ring circuits it gets bobbed up artificially if calculated according to Appendix A of the OSG. I've taken diversity into account here, 66% on lighting, 10A full load plus 30% of remainder for each of the two cookers, 100% for two showers, then 25% for the third shower. 13A has been allowed for the shed where there is a single socket outlet and 13A for the water heater. Max demand calcs are a bit of a nonsense though as splitting up socket circuits just drives the numbers up on paper even if the number and utilisation of sockets remains the same. Usually, I just add up the MCB's and multiply by 0.4 to get an (arguably) more realistic figure. I know other sparks also do this, but I'm not sure where it comes from. Doing it using the 0.4 rule-of-thumb would give a figure of 168A in this case.
@tonymariner5519
@tonymariner5519 5 жыл бұрын
I find the formula a bit of a nonsense personal. Nothing like experience when calculating maximum demand.
@laernulienlaernulienlaernu8953
@laernulienlaernulienlaernu8953 5 жыл бұрын
3 showers on the go in the middle of winter must be pushing 100 amp?
@albertkleyn111
@albertkleyn111 4 жыл бұрын
Easily as David mentioned, Each shower is almost 9KW. 27000:240 is yr answer. Bye bye main fuse.
@artisanelectrics
@artisanelectrics 5 жыл бұрын
Whoever decided to put consumer units under stairs deserves a slap! 😂
@curtisj2165
@curtisj2165 5 жыл бұрын
It's there because nobody wants to see it
@andrewstone841
@andrewstone841 5 жыл бұрын
Would rather it be there than over the front door or the downstairs toilet
@curtisj2165
@curtisj2165 5 жыл бұрын
@@andrewstone841 or in pride of place in the living room
@christopherhulse8385
@christopherhulse8385 5 жыл бұрын
Would benefit from a 3 phase supply.
@09weenic
@09weenic 4 жыл бұрын
Christopher Hulse ££££££££
@rattlehead85
@rattlehead85 5 жыл бұрын
The joys of carrying out EICR’s on properties post purchase when you find stuff that’s in need of attention 😩😩
@09weenic
@09weenic 4 жыл бұрын
rattlehead85 exactly - it should be compulsory for the buyer to obtain a current EICR for the property
The £85 EICR.... of pants
46:39
David Savery Electrical Services
Рет қаралды 60 М.
EICR failure site - righting the wrongs
24:48
David Savery Electrical Services
Рет қаралды 67 М.
Just Give me my Money!
00:18
GL Show Russian
Рет қаралды 1 МЛН
PEDRO PEDRO INSIDEOUT
00:10
MOOMOO STUDIO [무무 스튜디오]
Рет қаралды 26 МЛН
The FASTEST way to PASS SNACKS! #shorts #mingweirocks
00:36
mingweirocks
Рет қаралды 13 МЛН
I Took a LUNCHBAR OFF A Poster 🤯 #shorts
00:17
Wian
Рет қаралды 15 МЛН
SPARKY MISTAKES! 😡😡😡 with David Savery - SGTV
41:46
Scolmore Group
Рет қаралды 10 М.
Initial Verification - Testing someone else's crap work
32:55
SparkyNinja
Рет қаралды 273 М.
How To Calculate Your Maximum Demand
11:35
Heat Geek
Рет қаралды 18 М.
Why Your Tesla is Falling Apart
22:17
Rich Rebuilds
Рет қаралды 576 М.
Botchery, line tracing & core drilling
21:39
David Savery Electrical Services
Рет қаралды 79 М.
Curious fault #1
12:55
David Savery Electrical Services
Рет қаралды 140 М.
Maximum Demand & Diversity for Electrical Installations
30:29
John Ward
Рет қаралды 153 М.
Tracing an RCD trip
17:08
David Savery Electrical Services
Рет қаралды 70 М.
Deciphering a duff EICR... with THIS GUY
53:52
David Savery Electrical Services
Рет қаралды 24 М.
Fixing another man's lash-up!
45:16
David Savery Electrical Services
Рет қаралды 142 М.
Just Give me my Money!
00:18
GL Show Russian
Рет қаралды 1 МЛН