Рет қаралды 1,789
The prep work is ending and we can start seeing some results here. First up is the ceiling of the hallway. I removed the old lime plaster that was all cracked up and needed a lot of repairing. I decided to take it down, but since I didn't feel comfortable enough to redo the lime plaster in the ceiling I used leftover drywall I had in the attic. I did two layers as a fire hazard prevention.
Big thanks to Lucine and Josselin for all the help!