EASYJoint - Installation Guide

  Рет қаралды 70

Laydex Ltd

Laydex Ltd

Жыл бұрын

Easy Joint is a product that simplifies the process of jointing or filling gaps between paving stones, slabs, or bricks. It provides a durable and weather-resistant finish, preventing weed growth and improving the overall appearance of outdoor surfaces. Here is a general installation guide for Easy Joint:
📝 PREPARATION:
• Ensure that the surface is clean, free of debris, and dry.
• Remove any loose materials, weeds, or dust from the gaps between the paving stones.
🔄 MIXING:
• Carefully read and follow the manufacturer's instructions for the specific Easy Joint product you are using.
• Typically, Easy Joint comes in a powdered form and requires mixing with water. Use a clean container or bucket to mix the product.
• Gradually add the Easy Joint powder into the container while stirring continuously to achieve a homogeneous mixture. Ensure there are no lumps.
🧹 APPLICATION:
• Begin applying the Easy Joint mixture onto the prepared surface. It is advisable to work in small sections to ensure efficient application and avoid the mixture drying out before completion.
• Use a soft brush or broom to sweep the Easy Joint mixture diagonally across the paving stones, ensuring it fills the gaps evenly.
• Apply enough pressure to ensure the mixture penetrates the gaps completely. Continue sweeping and compacting until the gaps are adequately filled.
⚠️ REMOVAL OF EXCESS MATERIAL:
• After filling the gaps, remove any excess Easy Joint mixture from the surface using a broom or brush.
• Pay attention to the edges of the paving stones and remove any visible traces of Easy Joint before it dries.
💦 WATER ACTIVATION:
• Easy Joint typically requires water to activate the setting process. Follow the manufacturer's instructions regarding the amount of water and the duration of the activation process.
• Use a gentle mist or spray of water to wet the surface of the Easy Joint-filled gaps. Avoid excessive water flow that could displace the mixture.
⏳ CURING AND DRYING:
• Allow the Easy Joint mixture to cure and dry according to the manufacturer's recommendations. This typically takes a few hours, but it may vary depending on the product and weather conditions.
• Avoid foot traffic or any activity that may disturb the joints during the drying period.
It is essential to read and follow the specific instructions provided by the Easy Joint product you are using, as different formulations may have slightly different application techniques and curing times.
www.laydex.com
www.azpects.co.uk/products/easy-joint.aspx

Пікірлер
А ВЫ ЛЮБИТЕ ШКОЛУ?? #shorts
00:20
Паша Осадчий
Рет қаралды 6 МЛН
Dad gives best memory keeper
01:00
Justin Flom
Рет қаралды 23 МЛН
CHEAPEST Budget way For SOUNDPROOFING a Room
15:06
Soundproof Guide
Рет қаралды 2,2 МЛН
Contractors Hate Me For Showing You This!
24:20
HAXMAN
Рет қаралды 1,6 МЛН
Grinding concrete to prevent tripping accidents - save your money and your toes!
3:10
Steintec Introduction for the Application of Tuffgrout.mov
3:53
Polygonalplatten/Stone patio / Install a stone patio
8:11
Toni Kindler
Рет қаралды 244 М.
How to install Easyjoint Grout
4:07
Mark Marshall
Рет қаралды 27 М.
ALUTRIX 600 Self-Adhesive Vapour Barrier
1:23
Laydex Ltd
Рет қаралды 6 М.
А ВЫ ЛЮБИТЕ ШКОЛУ?? #shorts
00:20
Паша Осадчий
Рет қаралды 6 МЛН