ERMA FIRST BWTS FIT - THE EXCELENCE OF SIMPLICITY

  Рет қаралды 17,409

ERMA FIRST ESK Engineering Solutions S.A.

ERMA FIRST ESK Engineering Solutions S.A.

7 жыл бұрын

ERMA FIRST BWTS FIT is an advanced modular system that was developed to exceed all the special installation requirements either for New Building vessels or especially any retrofit project. Covering an extensive capacity range from 50 to 3000m3/hr and having completed successfully the required tests on the way to USCG approval, ERMA FIRST FIT is an ideal solution for all types of ships. The major components of the system are a high-end backwash filter and an electrolytic cell with outstanding performance under the most demanding conditions. The self-cleaning automatic screen filter has a nominal filtration rate of 40 microns. Its special designed screen provides with enormous zooplankton, phytoplankton and sediment removal, minimum pressure and uninterrupted, long-lasting operation at an extremely small footprint element. For the de-ballasting of the vessel there is no need to use the system; It is completely by-passed and the water can be discharged directly overboard, after neutralization where applicable, with considerable gains in energy saving for the operators/managers of the vessel. Using an active substance that is produced by the method of electrolysis, any danger for re-growth of microorganisms is eliminated

Пікірлер: 2
@user-rm7sq7gz4i
@user-rm7sq7gz4i 3 жыл бұрын
Good day. How calculate the quantity of sea water to be taken to after peak tank beforehand to make later on ballast treatment in fresh water for all other tanks?
ERMA FIRST BWTS - THE ULTIMATE SEDIMENT CONTROL
8:06
ERMA FIRST ESK Engineering Solutions S.A.
Рет қаралды 27 М.
ERMA FIRST BWTS Components Maintenance - TRO Commissioning
14:54
ERMA FIRST ESK Engineering Solutions S.A.
Рет қаралды 19 М.
Ауылға қайт! | АСАУ | 2 серия
33:16
Qarapaıym Qanal
Рет қаралды 1,1 МЛН
ОДИН ДОМА #shorts
00:34
Паша Осадчий
Рет қаралды 6 МЛН
когда одна дома // EVA mash
00:51
EVA mash
Рет қаралды 12 МЛН
Ballast Water Treatment System | Sunrui Balclor BWTS | BWTS working & Operation
23:09
Работа моряков:Видообзор ERMA FIRST BWTS.
14:33
Николай Черномор
Рет қаралды 1,4 М.
Ballast Operation
28:02
Baba Blackhole
Рет қаралды 66 М.
PANASIA _ BWTS_ GloEn Patrol™
7:31
PANASIA
Рет қаралды 15 М.
ERMA FIRST BWTS Components Maintenance - FILTREX Filter
4:53
ERMA FIRST ESK Engineering Solutions S.A.
Рет қаралды 11 М.
Balclor - Ballast Water Management System
7:33
INTERNAFTIKI
Рет қаралды 44 М.
ME ENGINE CONTROL SYSTEM
8:23
Sea Legend
Рет қаралды 21 М.
Ballast Operation
29:01
The Millennial Seafarers
Рет қаралды 15 М.
oneTANK How-To
1:55
ERMA FIRST ESK Engineering Solutions S.A.
Рет қаралды 925