Essential Preparations for Main Engine During Ship Arrival and Departure | Technical Vlog : 083

  Рет қаралды 3,916

MOE MYINT SHEIN 🇲🇲

MOE MYINT SHEIN 🇲🇲

Күн бұрын

Пікірлер: 14
@ThetPaingSoe-l4d
@ThetPaingSoe-l4d 23 сағат бұрын
May be success more bro . Now videos is unique.
@CHiEF_MOEMYiNTSHEiN
@CHiEF_MOEMYiNTSHEiN 21 сағат бұрын
Thanks !
@ashishmishra2144
@ashishmishra2144 Жыл бұрын
Thanks dear sir and love from india. I never understand these things in my academy or in theory book. You just shown the clear practical view with in depth knowlwdge. Thanks again sir. Keep posting.
@CHiEF_MOEMYiNTSHEiN
@CHiEF_MOEMYiNTSHEiN Жыл бұрын
Appreciate 😊
@linhtet5946
@linhtet5946 Жыл бұрын
so good and benefit to me.
@CHiEF_MOEMYiNTSHEiN
@CHiEF_MOEMYiNTSHEiN Жыл бұрын
Thanks 😊
@tungabar2457
@tungabar2457 3 ай бұрын
End rate engine preparation for dead speed high.
@CHiEF_MOEMYiNTSHEiN
@CHiEF_MOEMYiNTSHEiN 3 ай бұрын
Clarify !
@tungabar2457
@tungabar2457 3 ай бұрын
@@CHiEF_MOEMYiNTSHEiN I prepare this End rate for the ship evergreen 400m 24000 teus. And departure from Yangon Port to Ocean.
@CHiEF_MOEMYiNTSHEiN
@CHiEF_MOEMYiNTSHEiN 3 ай бұрын
@tungabar2457 That’s great !
@tungabar2457
@tungabar2457 3 ай бұрын
@@CHiEF_MOEMYiNTSHEiN Sulazanaka Indian in Myanmar Born buy The evergreen marine 24000 teus pair ships sale 320 M$US. I sail the 400m ship. I add ship operating service for 399M ship.I add Shipping Marketing service, Now.
@nayvala3820
@nayvala3820 Жыл бұрын
Sir we always run Two Eco Hydraulic Pumps in 5UEC50LSH Eco CII. Now I see only one start and one stby. Can you please explain sir?
@CHiEF_MOEMYiNTSHEiN
@CHiEF_MOEMYiNTSHEiN Жыл бұрын
In exact, One is lead and another one is follower. Only one pump is required to turn engine by turning gear. Otherwise, turning engine is low load operation. Doesn’t require to run both pumps. During engine running with load, engine control system decides either one or two pumps, need to run. When engine driven pumps are working, both Eco pumps are in standby mode. Depends upon model, procedures and requirements may differ.
@nayvala3820
@nayvala3820 Жыл бұрын
@@CHiEF_MOEMYiNTSHEiN Thank You for splendid explanation Sir.
[SHIP] ENGINE ROOM Touring | Part One | Merchant Navy | Technical Vlog : 079
26:16
MOE MYINT SHEIN 🇲🇲
Рет қаралды 1,4 М.
FOREVER BUNNY
00:14
Natan por Aí
Рет қаралды 26 МЛН
The IMPOSSIBLE Puzzle..
00:55
Stokes Twins
Рет қаралды 169 МЛН
風船をキャッチしろ!🎈 Balloon catch Challenges
00:57
はじめしゃちょー(hajime)
Рет қаралды 93 МЛН
They Chose Kindness Over Abuse in Their Team #shorts
00:20
I migliori trucchetti di Fabiosa
Рет қаралды 12 МЛН
How To Start The Ship's Main Engine : From Preparation to Full Away
12:13
How the MAN-B&W slide type fuel valve works
6:40
UEC MITSUI Marine Diesel Engine
Рет қаралды 6 М.
ENGINE ARRIVAL PREPARATION FOR PANAMAX VESSEL
16:01
Captain JBA
Рет қаралды 1,5 М.
Engine Room Watchkeeping
26:33
Mariners Note
Рет қаралды 11 М.
Why Are Cooling Towers Shaped Like That?
19:48
Practical Engineering
Рет қаралды 3,7 МЛН
FOREVER BUNNY
00:14
Natan por Aí
Рет қаралды 26 МЛН