Estimating bridge hydraulics and scour

  Рет қаралды 11,707

Australian Water School

Australian Water School

Күн бұрын

Пікірлер: 3
@louismartina544
@louismartina544 2 ай бұрын
we have six bridges here in the Tagliamento river ( North Italy). Besides scour pier protection we are planning to flood control to increase the lamitation of the bridges by having a critical velocity between the piers. Flow to control is from 1000 to 2500 m3sec during flood.
@littleark
@littleark 2 жыл бұрын
This is happening to Minisa Bride in Wichita Kansas.
@luigicantoviani323
@luigicantoviani323 2 жыл бұрын
Actual model...Eqs...Vs real life measurements?...left wondering a lot. Thanks though.
Maximising the Accuracy of Hydraulic Models
1:10:06
Australian Water School
Рет қаралды 2,7 М.
Riprap sizing in HEC-RAS version 6.1
1:00:25
Australian Water School
Рет қаралды 6 М.
Пришёл к другу на ночёвку 😂
01:00
Cadrol&Fatich
Рет қаралды 11 МЛН
From Small To Giant Pop Corn #katebrush #funny #shorts
00:17
Kate Brush
Рет қаралды 69 МЛН
🍉😋 #shorts
00:24
Денис Кукояка
Рет қаралды 3,2 МЛН
Advances in scour assessment
1:09:18
Australian Water School
Рет қаралды 1,4 М.
Riprap and Scour Calculator in HEC-RAS (Part 1: Riprap)
20:50
Stanford Gibson
Рет қаралды 13 М.
Probable Maximum Flood (PMF)
59:22
Australian Water School
Рет қаралды 6 М.
Get Structured with Hydraulics!
59:23
Australian Water School
Рет қаралды 6 М.
US Fastest Hypersonic Jet Reaching The Speed Of Light Is Ready To Fly
36:12
Chief of Military
Рет қаралды 2,4 М.
Riprap and Scour Calculator: Part 2 Computing Toe Scour
11:31
Stanford Gibson
Рет қаралды 5 М.
HEC-RAS 2D Class: 4.3 - 2D Bridge Hydraulics
20:58
HEC RAS 6
Рет қаралды 12 М.
Modelling with  HEC-HMS
59:30
Australian Water School
Рет қаралды 58 М.
Adding Piers to a 2D HEC-RAS Terrain and Mesh
8:29
Stanford Gibson
Рет қаралды 4,4 М.
Culvert Hydraulics
44:06
Federal Highway Administration USDOTFHWA
Рет қаралды 176 М.
Пришёл к другу на ночёвку 😂
01:00
Cadrol&Fatich
Рет қаралды 11 МЛН