The Work Breakdown Structure (WBS) is exemplified using a simple five-level plan. Top-down budgeting and allocation of team skills is demonstrated in connection to the WBS. Featuring Professor Edward J. March.
Пікірлер: 49
@drutheflu8 жыл бұрын
I am a PM for Software Applications I was watching video's just to freshen up on my approach and this is the best explanation of WBS anywhere. You keep it simple which makes it easy to understand, thank you.
@CaptainMacNasty6 жыл бұрын
Not particularly agile, though.
@4x4dually5 жыл бұрын
I had to watch it twice. I spent the entire first time trying to figure out how they mirrored the video. LOL
@FenixDown1475 жыл бұрын
Ya, is he writing mirrored?
@shandorcoachman9453 жыл бұрын
same here :D
@tusharnirasАй бұрын
LOL
@nemonemo6285 Жыл бұрын
I have over 20 years as a PM. You have managed to explain this topic Perfectly.
@ugurkilic25778 жыл бұрын
Thank you. The clearest explanation I've ever seen.
@neiloconnell21205 жыл бұрын
Excellent description of a WBS including the budgeting aspect. Thank you for it.
@AdrianaGirdler3 жыл бұрын
Great explanation of the WBS. Cheers!
@imziminhas2 жыл бұрын
Thank you for putting it out with simplicity. This is probably going to stick with me for a long time. Well explained.
@mkyrene8 жыл бұрын
The explanation is so clear and concise!! WBS is definetly understood by me!
@yamin207eb5 жыл бұрын
Thank you, young man for making life easier
@petermwesiga47614 жыл бұрын
Will simply say thank you. Very good explanation. Make me fall in love with Project Management once again.
@yutipm134 жыл бұрын
Its so comprehensive. Thank you Sir.
@bmbrooklyn3 жыл бұрын
I want a glass board like yours. It is awesome! Thanks
@spbs-pk3ii5 жыл бұрын
He made it look so easy..
@tomrwestcott6 жыл бұрын
Work Package is NOT a task. Work Package is the lowest level deliverable in the WBS. It's a noun and not a verb. Work Packages contain activities.
@yutipm134 жыл бұрын
Then what's the difference between a product-oriented and a Task WBS? This for one is a Hybrid WBS
@91099Babar7 жыл бұрын
You should show us how would the Budget be created in the Wbs ? How did you estimate the budget ??
@fykyafet2 жыл бұрын
amazing explanation
@ernstguillaume27888 жыл бұрын
very clear explanation. I am captured by your blackboard... great tech
@Slickomicko7 жыл бұрын
he writes backwards like a boss !
@joshuadangerfield72237 жыл бұрын
The video is mirrored. Check out his shirt pocket and watch. It's on the opposite side. Such a cool idea!
@alexandrecadier47793 жыл бұрын
This man is a very nice professor i like all his videos, can we have his name ?
@bztree806 жыл бұрын
How would you break down continuous tasks in to WBS? Say you’re building 100 airplanes, each plane would require assembly, testing, painting etc. You would start assembling first few and while they are being tested and painted you assemble the next few. The stages are overlapped and each with multiple instances(planes)
@sexmaeschine696 жыл бұрын
yt8019 definition of a Project is that it is unique. Are you sure that you like to plan a Project?
@oydeekoi82717 жыл бұрын
Smashed dat thumbs up button.
@hernanperez9126 жыл бұрын
whats first, the chicken or the egg?
@longjefferson8 жыл бұрын
Thank you. Are you writing in reverse? How do you that?
@ThayerSchool6 жыл бұрын
Yes, exactly.
@rexhart2035 жыл бұрын
whatever it is, why bother??? Can hardly read a word!
@periteu6 жыл бұрын
What blackboard is that?
@ThayerSchool6 жыл бұрын
It's a transparent "whiteboard," and then the video is flipped.
@periteu6 жыл бұрын
Thayer School of Engineering at Dartmouth thanks :D. Very professional and great explanation of the topic.
@Office35 жыл бұрын
what is his name?
@borgaonkar-actsolandassoci11716 жыл бұрын
May I use this video in one of my training presentation course? I will give credit to you. Kindly revert pls.
@ThayerSchool6 жыл бұрын
Yes, you may.
@jpo64445 жыл бұрын
Tasks and activities are not Work Packages. Work Packages are made up of tasks/activities. Work Packages are deliverables, like Mech design drawings. Also, best practice is to develop an estimate from the bottom up, not top down. The goal of the WBS is to identify all of the scope of a project so that it can be monitored and controlled. That scope is then used to develop a schedule (activities), assign resources, and develop a budget.
@nathancourtaney58675 жыл бұрын
This video was cool and all but how are the words he is writing not backwards.. Is he just good at writing backwards??
@rexhart2035 жыл бұрын
writing???? Man, that is hieroglyphics! I have seen doctors who wrote better. If you can't do it properly, don't do it. takes away from a great explanation.
@cornelldavis24973 жыл бұрын
I think we deliver to as me singing in an see the life as we be the raise of keenon we is here wassup
@RPCGames3 жыл бұрын
This was great, thanks, I've been looking for "what is a design proposal engineering?" for a while now, and I think this has helped. Have you ever come across - Biycarlett Astounded Builder - (should be on google have a look ) ? It is a good one of a kind product for discovering how to download thousands of business and project management templates minus the headache. Ive heard some great things about it and my co-worker got cool success with it.
@petermoss53414 жыл бұрын
I just want to know how he is writing on the back side of my monitor screen.
@drgtears74074 жыл бұрын
UPUPUP
@kgh50254 жыл бұрын
Great Video, Great Explanation, Terrible Handwriting. Hahaha
@vibechecks19872 жыл бұрын
This is the worst handwriting ive ever seen in my life