No video

NS Track & Surface Team 2 surfacing a turnout in Harrisburg NC

  Рет қаралды 307,252

FNGFASHA Productions

FNGFASHA Productions

Күн бұрын

RailFanning With Fasha - I had a half-day from work and was headed home and found Norfolk Southern Track & Surface Team 2 surfacing a turnout in Harrisburg (364) North of Charlotte NC between HAYDOCK (360.1) & JUNKER (372.2). Please click "LIKE" Button!!

Пікірлер: 85
@QUIX4U
@QUIX4U 2 жыл бұрын
52 people ? You have to be kidding, as even back in the day (over here in New Zealand) - on the NZR during my time with them in the 1970's - we only ever had a 17 man gang - (when it was at full strength - seldom was full strength), and we either used an old road services work bus to get to the closest station, or travelled the entire way to the jobs on open top B&S powered 2, 3, 4, or 6 man motor trolley's and towed all our (portable) track gear - as well as sleepers (50 max per trailer, and lengths of rail across / on flat-top trailers as well. Often tying two or three motor trollies together at the head, and towing two or three single trailers, plus some rail across a pair of trailers too.. not an easy option to cross a train - but when we had long hauls like that - we got a station entry key (woods key) to open the trackside turnouts, and enter the loop of small stations along the way. If just on a trolley with one trailer, it was tip the gear off, alongside the track & off-track the trolley & flat-top at a stand. Hard work, but we never had all the machinery and way too many men you have there, we simply did it slow & took a long time. (manually moving sleepers and rail into position). 1:34 "spike pullers" ? Ever heard of the claw on the end of a crow-bar, as have "pulled" many a dog-spike with a crowbar - plus the goose-neck (double sprung steel) hardwood spikes we had to pull with a special 3 pronged heavy head puller bar - which we 'pushed into the spikes from the L or the R depending on which way they "aligned" with the rail - as the outer leg would go over the goose-neck "bill end' and the middle finger would go UNDER the neck hoop withdrawing the sprung spikes by "bouncing" one or two men at the end of the long handles. We also - preferred to use more and better SCREW spikes, (the old original turnout screw-bolts had a triangular nut underneath that seldom if ever loosened when trying to remove the screw-bolt, as the sleeper that was near rotten would crumble around those nuts - leaving us with the only option for them, being a heavy duty cold chisel hit with a 10 LB sledge hammer, (to snap off the bolt heads) and then driving the snapped off bolt shaft - down into the track bed with a 3/4" diameter drift (also hammered with that 10LB sledge hammer. We always dug the ballast out, beside any sleepers needing to be replaced, so that we could knock them sideways into the hole, before hand pulling the sleepers out, and sliding a new sleeper in the same way - then lifted the rails with track-jacks to allow us to re-position the new sleepers on the old sleeper's bed. Dropping the rail down onto the sleepers, and if NOT drilled out, then we ONLY did - hand held drilling (with a long auger) using either a 7/16" bit, (for dog spikes) or a 9/16" auger bit, for screw spikes. Then we either used long head hammers (to hammer dogs beside & below the rail head), or we turned down the screw spikes - with a big T bar (with the screw head socket on it) - or sometimes had the delight of power driving them in, with a hydraulic PROLINE machine (a motorized hydraulic pump) and pulled that along by it's twin 3/4" hoses fitted to the power head, that we held (by hand) as we used it between our legs, and that pulse-banged the screws in with a hammer function of the head, as the machine turned the screws in. SLOW AS, noisy too - and really hard on the body - but we did it as there wasn't any fancy (multiple track machines) way We had none of those (38) fancy self-driven machines to do all the hard work for us, and thus - did it all by hand without needing half the USA population either - that you need there, to drive all that gear. A good well oiled 6 man (KIWI) NZR way & works track gang team, could replace all the sleepers in a turnout and re-tighten the rail down, hand (spade) packing the ballast underneath - and finish in a single 8hr day. We could (with about 6 - 8 men) usually do about 1/4 to 1/2 a mile of open track maintenance work, even if needing to be replacing the odd sleeper along the way - as we re-gauged a section. NOTE: Every piece of our NZR track maintenance gear (that we used every day) HAD to be light enough, to be off-tracked by at most four men, to allow us to work around the timetables of the normal daily trains Not any of this we hold the section and MUST go to a siding, to cross trains, oh hell no, we ONLY had the pleasure of using a couple of track DETS to warn the trains of our whereabouts, and us, of their approach, to get all the gear OFF (and onto the shoulder of the track corridor) - at our worksite.
@tommyboy71
@tommyboy71 3 жыл бұрын
Sure do miss those days working the Milwaukee Road. All we had was a Tie Machine, Tamper, and Wire liner. Everything else by hand.
@alanblasczyk1779
@alanblasczyk1779 2 жыл бұрын
That was seriously interesting. very good to see what goes into keeping this infastructure up & running.
@tuboring
@tuboring 9 жыл бұрын
Thanks for taking the time to take all the video. Not to mention the dedication, all the time it takes editing, titling, and making this so interesting.
@FNGFASHA
@FNGFASHA 8 жыл бұрын
+Tuba Ing Ty for the kind word and watching the video!!!!
@CuthbertNibbles
@CuthbertNibbles 4 жыл бұрын
17:42 It is amazing how incredible violent and precise this process is.
@gp3yt
@gp3yt 5 жыл бұрын
Awesome action, those old ties were TIRED. On a side note - the horn signal @19:11 sounded like the horn from the old James Brolin horror movie; "TheCar" - great share bud!
@sonnyozeretnyjr5249
@sonnyozeretnyjr5249 5 жыл бұрын
I just watched your video. Nice to catch all the action. It's cool watching all the different machines performing there tasks. Nicely done.
@cabolick
@cabolick 9 жыл бұрын
I built that SLM machine, the magnet wheel machine, in Charlotte last year. Most of those machines are either rebuilt / overhauled or built new on site.
@FNGFASHA
@FNGFASHA 9 жыл бұрын
Thats cool! I enjoyed watching how each machine did its job and all of them together made quick work of that track.
@rickmunton2112
@rickmunton2112 7 жыл бұрын
I worked there from 1986 till 2009 when I retired. Great people.
@FNGFASHA
@FNGFASHA 7 жыл бұрын
That's cool!! I enjoyed hanging out with the guys that day. Sorry for the slow reply. The whole landscape of this area has changed.....
@royniemann4190
@royniemann4190 5 жыл бұрын
This is the first video I Have Seen that actually has RR people talking and explaining things. Very nicely edited video.
@MrDasher01
@MrDasher01 8 жыл бұрын
What an awesome video!! I have always wondered what these little units did and I'm always intrigued when I see them. When you see them in action, they are marvelous.
@dannycoker6439
@dannycoker6439 4 жыл бұрын
Edmund Thoroughgood ET would like to see a surfaceing gang in action.
@FNGFASHA
@FNGFASHA 9 жыл бұрын
Another of my favorite videos. Kind of long, but lots of interaction with NS employees.
@FNGFASHA
@FNGFASHA 9 жыл бұрын
Phil Bruce Thats crazy! This location is near my home. Im a people person. I walked up, asked where the foreman was, told him I would love to video what they were doing, he said fine. Before I knew it, crewman were walking over and talking with me.
@FNGFASHA
@FNGFASHA 8 жыл бұрын
Thanks for watching and the kind words.
@general5104
@general5104 6 жыл бұрын
KEWL...thanks so much for taking the time to get this wonderous footage!!! Bless you sir!!!
@MrCsxtrain
@MrCsxtrain 8 жыл бұрын
They sure do love blowing those horns!!
@Stache987
@Stache987 5 жыл бұрын
I caught the last sentence.. already had a dip of Copenhagen in. And saw the worker put a double pull in himself.
@emildekoven4872
@emildekoven4872 8 жыл бұрын
Spiked timber roadbeds are so 'old-fashioned' and require half a battalion of people to accomplish very little....when it's time to "refresh" the ballast, swap out rails, etc.
@littleblitz8239
@littleblitz8239 8 жыл бұрын
The UP northwest line runs past my home, literly 200 ft. from my door. I've seen this done live, it's pretty neat. wish I had a camera to film it but don't know what brand to get or what type.
@jfreelan1964
@jfreelan1964 11 жыл бұрын
Wish I could catch stuff like that here in Fayetteville. Same for Aberdeen & Rockfish RR over the last year when they have been replacing there 85lb rail with 115-136lb rail.
@gunsaway1
@gunsaway1 9 жыл бұрын
That siding now gone and is getting the new second track installed.
@rrich52806
@rrich52806 6 жыл бұрын
amazing,, there are some like these parked on an off track at CP -Nagant yard Davenport Ia wondered what they were.
@jayjackson6967
@jayjackson6967 6 жыл бұрын
Good jobs keep up the good work.
@gearshifterg9756
@gearshifterg9756 5 жыл бұрын
Typical question from someone who is from North Carolina....."Does the magnet pull the spikes out of the ground?" I 'bout fell outta my chair!!!!!
@TheFeuillesMortes
@TheFeuillesMortes 8 жыл бұрын
Great Video Sir!
@phamhanh1459
@phamhanh1459 5 жыл бұрын
TheFeuilles Mortes ông
@markinocencio7394
@markinocencio7394 4 жыл бұрын
i like the first machine i saw wonder what the brand is the spike magnet
@colliecandle
@colliecandle 10 жыл бұрын
I notice the lack of fluorescent 'safety' wear ! Over here, there would be a conference with everyone gathered around and having to sign forms for pc bullshit. Glad to see rail workers do a job where common sense and safe working doesn't involve all the nonsense we have here.
@FNGFASHA
@FNGFASHA 9 жыл бұрын
True
@FNGFASHA
@FNGFASHA 9 жыл бұрын
Phil Bruce Very rarely do I hear of any of them getting hurt.
@jfreelan1964
@jfreelan1964 11 жыл бұрын
I would like to give a definitive answer on that one. Some time soon, I hope. How busy is that diamond under the over pass in Charlotte?
@Bobrogers99
@Bobrogers99 5 жыл бұрын
Very interesting! It takes quite a few specialized machines (and perhaps an oversized crew) to accomplish this task. More modern rail-laying techniques and materials would, in the long run, make this complex process unnecessary, but that would require a big investment, and railroads don't get much Federal support.
@normanmcgill9532
@normanmcgill9532 7 жыл бұрын
Hi Fasha. You all still doing UP in HO? Great video. Thanks for posting.
@FNGFASHA
@FNGFASHA 7 жыл бұрын
I have backed away from the modeling for a little while, it was taking up too much of my time. Thanks for watching the video!!!
@haroldwilkes6608
@haroldwilkes6608 2 жыл бұрын
Imagine the crew size 70 years ago...
@FNGFASHA
@FNGFASHA 11 жыл бұрын
Hi Sir! How have you been? Ever going to get back up this way?
@ericchapman6251
@ericchapman6251 5 жыл бұрын
Isn't this location near where the Schnabel car derailed several years ago?
@FNGFASHA
@FNGFASHA 5 жыл бұрын
Eric Chapman real close, maybe 2, 2.5 miles north of there
@JawTooth
@JawTooth 9 жыл бұрын
How can there be 7 dislikes? This is an interesting video. They sure do blow their horns a lot.
@FNGFASHA
@FNGFASHA 8 жыл бұрын
+Jaw Tooth thanks for viewing and liking the video !
@JawTooth
@JawTooth 5 жыл бұрын
I have returned! lol
@ljones121
@ljones121 5 жыл бұрын
Active work zone have too
@raymondcote6669
@raymondcote6669 4 жыл бұрын
Why did you move just as a tie was being inserted?
@FNGFASHA
@FNGFASHA 4 жыл бұрын
Raymond Cote i think, and it has been awhile, one of the foreman that allowed me to video, indicated I was too close.
@jestnessj3574
@jestnessj3574 5 жыл бұрын
All this technology but the u.s can't get high speed rail.
@AndrewAMartin
@AndrewAMartin 3 жыл бұрын
@PublicScoolFTW Not entirely true - Amtrak is profitable in the Northeast Corridor, and carries a considerable amount of passenger traffic. And passenger service was never a big moneymaker, it was just a requirement that they provide it in exchange for basically getting land for free.
@raincoast2396
@raincoast2396 5 жыл бұрын
Think some of those guys had best bring smaller lunch boxes to work!
@bob39434
@bob39434 5 жыл бұрын
All the big guys bid machines. If they had to walk and swing 16 pound spike mauls, throw tie plates, hand tamp crossties, etc as a track laborer, most of them couldn't hack it
@lawrencegreer892
@lawrencegreer892 5 жыл бұрын
Takes more people to do it this way than in the old days when it wa s done by "gandy dancers".
@EveOnlineRanger002
@EveOnlineRanger002 9 жыл бұрын
cool
@joesmoe4022
@joesmoe4022 5 жыл бұрын
Lmao and I thought we had junk at CP.
@franciscomontoya383
@franciscomontoya383 4 жыл бұрын
una imagen vale mas que mil palabras ACCION
@markthompsoncpa
@markthompsoncpa 4 жыл бұрын
Did it show 52 men working on this, I saw a Swedish or Asian video doing everything with just automated equipment
@FNGFASHA
@FNGFASHA 4 жыл бұрын
Mark Camaro there was a bunch of them
@FNGFASHA
@FNGFASHA 11 жыл бұрын
Cool! Great! Very and going away in a year or so. NCDOT will tunnel the CSX line under the NS so no one has to wait on the other and will add additional Amtrak service. Its hard for me to get away from work during the week unless its a holiday. Let me know when your coming and I will see what I can do. Weekend traffic is hit of miss, you just never know. But there is always something :-)
@Rekomeister
@Rekomeister 6 жыл бұрын
They are all union , right ?
@bob39434
@bob39434 5 жыл бұрын
Brotherhood of Maintenance of Way Employees.
@knightd12
@knightd12 9 жыл бұрын
I can`t hear a thing.
@suzannewilde4571
@suzannewilde4571 10 жыл бұрын
What do they do with the old ties?
@FNGFASHA
@FNGFASHA 10 жыл бұрын
Once they have enough of them bailed up, they set them off and a contractor comes by and pics them up. From there, Im not sure. Thanks for the view :-)
@TmaxRadio1
@TmaxRadio1 9 жыл бұрын
FNGFASHA Productions They are shredded and used to make steam to power turbines which gives electricity. The recycled materials metal wise are probably part of your new car.
@FNGFASHA
@FNGFASHA 9 жыл бұрын
Tmax Weather Center Thanks for the info Tmax :-)
@TmaxRadio1
@TmaxRadio1 9 жыл бұрын
FNGFASHA Productions you're welcome
@ArtR0001
@ArtR0001 9 жыл бұрын
+Suzanne Wilde We used to use them for landscaping back about 40 years ago.
@palmcoast26
@palmcoast26 5 жыл бұрын
wood ties are old...use concrete
@donharrus9994
@donharrus9994 6 жыл бұрын
Why do all ns machine looks like a pos compared to csx
@jacquesbaltazard9907
@jacquesbaltazard9907 5 жыл бұрын
beaucoup de bon à rien , moi j'ai vue du monde à rien faire 🛴🛴🛴🛴🚩🚩🚩🍗🥩🥩🥩🥩🍺🍺🍺🍺🍺🍺🍺🍺🍺🍺🍺🍺
@anonnomus6070
@anonnomus6070 4 жыл бұрын
Typical out of ten workers 1 does the work, and 9 watch and get paid.
@OOpSjm
@OOpSjm 9 жыл бұрын
seems so inefficient
@FNGFASHA
@FNGFASHA 9 жыл бұрын
They do it right!
@pearlyhumbucker9065
@pearlyhumbucker9065 5 жыл бұрын
@@FNGFASHA ??? Less than 10 people. One sleeper every 2 min. kzbin.info/www/bejne/Zn7bc5eOlrimfNU kzbin.info/www/bejne/noSon2x5jLCqqKc
@ragnarsbrother6049
@ragnarsbrother6049 8 жыл бұрын
lot of standing around
@gregorywilliams6771
@gregorywilliams6771 6 жыл бұрын
Ragnars Brother
@davefuller9087
@davefuller9087 Жыл бұрын
Lol outdated machines no hi viz.
@jimlove8144
@jimlove8144 6 жыл бұрын
Happy bunch of guys off to work. No women thank God!
CSX Replacing Railroad Ties on the CE&D sub
22:42
Grainexpress
Рет қаралды 1 МЛН
Plasser & Theurer PM 1000 URM Eurailpool in operation
22:23
hybryd83
Рет қаралды 353 М.
Секрет фокусника! #shorts
00:15
Роман Magic
Рет қаралды 64 МЛН
У ГОРДЕЯ ПОЖАР в ОФИСЕ!
01:01
Дима Гордей
Рет қаралды 6 МЛН
مسبح السرير #قصير
00:19
سكتشات وحركات
Рет қаралды 11 МЛН
طردت النملة من المنزل😡 ماذا فعل؟🥲
00:25
Cool Tool SHORTS Arabic
Рет қаралды 33 МЛН
A Day at Charlotte Junction on the NS Piedmont Division.
41:51
FNGFASHA Productions
Рет қаралды 9 М.
NS 4174 with P5 horn leads a massive NS 12R!!! 8-23-2024
7:02
A Railfan in North and South Carolina
Рет қаралды 197
New track laying with S2PV (english)
7:30
Geismar
Рет қаралды 1,3 МЛН
MOW Crew Replacing Railroad Ties In Relay,  MD
35:51
BaltimoreAndOhioRR
Рет қаралды 123 М.
Swietelsky reconstruction railway by SMD-80
25:26
brunoh155
Рет қаралды 5 МЛН
TRRS 504: Railcar Wheel Replacement
20:05
Thornapple River Rail Series
Рет қаралды 9 МЛН
Communications and Signals:Then and Now
15:01
Norfolk Southern
Рет қаралды 925 М.
TRRS 547: Railroad Rail Replacement
26:19
Thornapple River Rail Series
Рет қаралды 2 МЛН
Секрет фокусника! #shorts
00:15
Роман Magic
Рет қаралды 64 МЛН