Рет қаралды 11,270
THE ONLY FULL AUTOMATIC VALVE COATING SYSTEM ON THE MARKET!
NOTICE; such engineered plant is operated by only one person.
Valves are preheated in the 240 degrees hot oven and positioned over the fluidized bed container; the robot take the work piece from a flight bar on the overhead conveyor and dip it into the fluidized bed. During the dipping / coating process the work piece is automatic rotated, when the coating process is done, the robot lift the work piece out of the fluidized bed, in the same time a air blowing system blow off the excess powder.
The system is full automatically!!!!