The Johor Bahru/Singapore line is probably one of the most needed line. The traffic between JB and SG has gotten to absolutely ridiculous proportion. The car jam can last upward to 5-6 hours on particularly busy weekends, sometimes even longer. The number of people that have to transit between the two cities can go up 350k per day, with numbers as high as over 500k. Travelling between JB and SG has become stuff of legends. With a train line that can shuttle between the two stations at regular, high intensity interval, like 2 mins per train that can carry 500-700 passengers per trip, it will ease the burden on the existing border crossing routes. I can only hope they have the foresight to build extreme capacity to clear passengers at each custom.
@SuperValue3502 жыл бұрын
I loved taking the Singapore MRT when I visited the country! Nice to see more stations continuously being built! From Australia 🇦🇺
@Gilesiscool694202 жыл бұрын
Dude, I am in Australia right now and I am a Singaporean! I appreciate your commend for our MRT project.
@chris44842 жыл бұрын
Its insanely cool how well-connected the whole country is by metro and how much they plan to expand it to seemingly cover the entire surface area available!! lol
@SuperValue3502 жыл бұрын
@buck rogers You have no idea what you're talking about.
@RonLarhz2 жыл бұрын
Not cool. It is fast forwarding the sinking of our tiny island.
@SuperValue3502 жыл бұрын
@@RonLarhz Are you 12? That's the most absurd thing I've ever heard. That's not how engineering works
@chris44842 жыл бұрын
@@RonLarhz dude lmao what
@仟林-i9o2 жыл бұрын
@@RonLarhz are we sinking? I tot is just sea level rising
@Adrenaline_chaser2 жыл бұрын
Those "under planning" lines at the end seemed to cover some really interesting routes (as they are close to the coastline, or that green line that crosses the island horizontally). I'm surprised they haven't gave these lines the priority
@vin8tan2 жыл бұрын
Not that it hasn't been given priority, but land leases on many parcels where that line ( the Cross Island line) cuts through belonged to the military and private estates. Those leases, and it's facilities needed time to either expire or new facilities, such as a new air base needed to be developed, which means supporting facilities, housing, long term development and contracts so that an area doesn't become defunct. Many of these stops are also once low density, high affluent areas. So the population there drove and preferred driving. Attitudes have shifted, population along these places have grown. Now the need for public transport warrants the millions of dollars required to build that one station there. So there you have it :)
@cardenasr.28982 жыл бұрын
Asian metros, the ones you can trust they will reach their expansion projects and even overdeliver.
@mantis21792 жыл бұрын
And also expect extreme-overbudget.
@seananlinjunxi8682 жыл бұрын
@@mantis2179 nope American transit projects are the ones who tend to be overbudget all the time, look at new york second ave subway and east side access.
@ucm13132 жыл бұрын
@@seananlinjunxi868 hes half right the one in hong kong was blatlantly bullshit due to construction scandals
@sarips8412 жыл бұрын
@@maxmy2007 but singapore is in south east asia 🤨
@bahjc68502 жыл бұрын
Yes unlike the UK ones
@bowlampar2 жыл бұрын
It's insanely cool, from 1 expand to 12 lines within few decades, making travel within Singapore easier and fast. 👍🏽👍🏽
@jayfielding1333 Жыл бұрын
Great system, and video too. I love that they're planning well ahead of time. The Cross Island Line is the perfect finishing touch. As an aside, some fantastic station names. As an Aussie, I was shocked by Canberra Station but I also loved Beauty World and, best of all, Cashew.
@MaxCheng952 жыл бұрын
I like the zoom in station names feat you’ve got
@tntmaster11042 жыл бұрын
Its amazing to see you improve!
@Andrewjg_892 жыл бұрын
I like how you made these lines so accurate. Singapore would appreciate what you have done with adding extensions and new metro lines.
@Vic0v02 жыл бұрын
Perfect video! Well done! Love showing every station name and new lines by fading in. Will you make one combining the past and future expansion of Singapore MRT?
@AndewMole2 жыл бұрын
I feel like they won't want to make another video that is just two old videos
@Drizzile27442 жыл бұрын
This is a really good and detailed video! However, there are some mistakes: 0:37 : Xillin & Sungei Bedok stations on the Downtown Line will not open in 2024, and will instead open in 2025, together with the opening with Bedok South & Sungei Bedok stations on the Thomson East Coast Line. 0:53 : As of May 2, 2022, Teck Lee LRT does not have a planned opening date, and will continue to be closed due to the lack of development & facilities in the area. It won't open in 2024. (unless LTA announces) Tagore MRT (located between Springleaf & Lentor MRT on the Thomson East Coast Line) will be opened once the surrounding developments are ready. As of now,, it is currently a shell station.
@SMB8027G2 жыл бұрын
2024/2023 is a reasonable time for teck lee to open cuz by then the SIT & BTOs nearby would be ready
@irvinkoh56522 жыл бұрын
You forgot one mistake i think... the seletar line is not supposed to end at marina bay. But at Greater Southern Waterfront
@williamlim88662 жыл бұрын
Will there be MRT serving residents living in Seletar Hills estate?
@whenthewhen96862 жыл бұрын
@@williamlim8866 its couldbe planned but not confirmed. Hope that metro lines can reach out to every parts of singapore for easier access
@ccqpl2 жыл бұрын
teck lee will open very soon i spoke out to a member of lta in person
@trainzderails20082 жыл бұрын
Nice of you to make this vid. I’m even not so sure about my own metro.(It’s the one in this vid)
@larkwinth_real2 жыл бұрын
Always been drawing this since I was 10. Good job!!!!!! :D
@ianpolo5673 Жыл бұрын
Cannot imagine how convenient SG will be with these great transport networks.
@huaiwei2 жыл бұрын
Some future extensions not in this video but have appeared in some official publication or another (usually in the URA's concept plans): - Extension of Cross Island line (Punggol Spur) from Punggol all the way to Sembawang or Yishun, and rebranded as the possible "Northshore Line" - Extension of NEL from Punggol North into Ubin and Tekong before returning to the mainland via Changi (Likely linking at T5 station under the current configuration). - Extension of Downtown Line in the north from Sungei Kadut into Lim Chu Kang. - Extension of Jurong Region Line from Jurong Pier into Jurong Island. - Extension of East-West Line from Tuas Link into Johor. - Extension of Cross Island Line Westward into Tuas South.
@STANSAT10N2 жыл бұрын
Most of the ones you’ve listed in your comment has already been shelved or are just theories, no plans for these have been made official, that’s why it was not mentioned in the video. - As much as I want to see the north shore line, about 85% of the original plan has been shifted into the Seletar & Cross Island lines already, it’ll be more feasible to just extend the Punggol branch to meet at Seletar station and leave it as it is, there’s barely any space left for the extension to go further without running along side another line making redundancy in a Low density area. A tram style/ higher density LRT (similar to the JRL but 3 car trains) would be better in serving Sembawang - Yishun area but currently the busses are coping just enough and I don’t see them doing anything about it for a long time cause LTA wants to save ass after the whole LRT failure. - The plans for the NEL extending further than Punggol North, has been shelved for more than a decade now due to the modernisation restrictions on the satellite islands, currently there’s no plans on extending the NEL, EWL or CRL any further than what was presented in the video. Other than the EWL Jurong Port Branch Line that’s most likely benched due to its high costs and very specific riderships into a supposedly automated port, a cheaper alternative is most likely being considered. - Downtown line northern extension was “leaked” as a potentially feasible option that’s being looked into with a proposed station beyond Sungei Kadut, but currently no official plans has been made or announced nor was it mentioned to go into Lim Chu Kang since that area is highly undeveloped with no plans and the Low ridership wouldn’t make that feasible either. - The TEL wasn’t allowed to extend into Malaysia thats why they compromised with the RTS instead, there’s 100% no way the EWL would extend into the neighbouring country either without limitations and complete rework into RTS2. It’ll also be redundant when the HSRL plans comes back (if it ever does, Malaysia is very on and off about it but China is very confident in wanting to connect to Singapore, so we won’t know for a long time.)
@TimothyMokCJ2 жыл бұрын
Or another plan is to extend the East West Line from Tuas Link via Wrexham, Poyan Reservoir, Murai, Sarimbun, Sungei Gedong, Neo Tiew and terminating at Kranji. My views and plans since 2008. Jurong Region Line can branch into Lorong Danau and go all the way to Lim Chu Kang? I also have another plan, branch the EWL at Pioneer to go via Upper Jurong, Pasir Laba, Wrexham and go all the way to Malaysia.
@Yamato725_YT2 жыл бұрын
Great expansions planning!
@beatrixng67152 жыл бұрын
Is anyone super excited that they will get to see this extension happen in their lifetime or is it just me lol
@jptreveluv2 жыл бұрын
Yasssssss how i wish i could fly to singapore and explore their metro
@mitsuil68542 жыл бұрын
You forgot to add Tagore station on the Thomson-East Coast Line (between Springleaf and Lentor). It’s an unopened shell station like Bukit Brown on the Circle Line. Awesome video though!
@frxzzy_2 жыл бұрын
Normal people simp for girls, I simp for MRT
@A_OC500le Жыл бұрын
... WHAT THE HECK
@SiameseCheese2 жыл бұрын
I'm so jealous of places like Singapore that continuously invest in public transit.
@bsgalaxybrawler282 жыл бұрын
Which country do u live?
@SiameseCheese2 жыл бұрын
@@bsgalaxybrawler28 Los Angeles
@MikeIce4SG2 жыл бұрын
Holy moly. And i thought connecting my place to city area is already enough, there is still more train lines that are still able to connect
@riverhouses2 жыл бұрын
Amazing video! Would love to see Shanghai or Barcelona next, both are great metro systems!
@browhatthatinsane342 жыл бұрын
Incredible that one of the smallest countries in the world has a expansive metro system
@raymondhee82392 жыл бұрын
When the country is so small and when you have a lot of money, every corner can be covered easily.
@destonwong25772 жыл бұрын
By 2040 getting from one point to another point in Singapore maybe as fast as taking private vehicles.
@zhiyutang6668 Жыл бұрын
cross island phase 2 has been announced and will open in 2032 The stations include Turf City, King Albert Park (Interchange) Maju Clementi (Interchange) West Coast and Jurong Lake district
@kealee63502 жыл бұрын
Instead of building so many lines, I suggest sg should have one Expresss loop line to connect heartlands
@placeholderblankspace2 жыл бұрын
this is a good idea tbh. The DTL is basically a non-express version of that, and the CIL seems to be semi-express for the north east, and the circle line covers semi-central bit of sg. Woodlands to Khatib just gets no love i guess. Think the struggle with an "express" loop line is that it wouldn't really be that expressy in the grand scheme of things since that would be missing out a lot of places, unless they build a line solely to interchange with other lines, but then that wouldn't make sense because they'd want to build lines to increase accessibility to the MRT for neighbourhoods that lack it, like the East Coast portion of the TEL and the CIL, both of which are now completely dependent on buses for travel (along Marine Parade Road - Upper East Coast and the TPE section from Tampines to Punggol)
@huaiwei2 жыл бұрын
Except that it does not reflect the main movement of people on a daily basis in Singapore.
@hongpigeon29502 жыл бұрын
I'm also a mrt fan thanks for your video
@Justineexy2 жыл бұрын
Can you do a video about KL's metro?
@jamielye13718 ай бұрын
2:55 East West line: Hey u steel my line Thomson East Coast line: I don’t care I want yours Both: I want I want!! I WANT!!!
@babebibobuuu7515 Жыл бұрын
0:41 Downtown Line Stage 3E will be opened by 2025 not 2024 due to Covid-19 Pandemic of Singapore.
@tanjunwei85978 ай бұрын
2026 Thomson-East Coast Downtown Line Extends to Sungei Bedok
@cmrocarlosmanuelronquilloor2 жыл бұрын
excelent, the evolution Buenos Aires underground please
@ehmusibotuncleraymondsiol6464 Жыл бұрын
For the Cross Island Line, LTA announced that it will extend from Bright Hill to Jurong Lake District
@leobragaurbe2 жыл бұрын
Singapore is so cool, I wish lived in a city where I don't need to own a car
@SuperValue3502 жыл бұрын
Same. Cars are so high-maintenance and tedious to deal with constantly.
@kohwenxu2 жыл бұрын
@@SuperValue350 And the fact that Cars are super damn expensive here in Singapore
@SuperValue3502 жыл бұрын
@@kohwenxu I'm pretty sure that was by design to not gridlock the roads
@kohwenxu2 жыл бұрын
@@SuperValue350 Yes and also ERP (Electronic Road Pricing)
@kohwenxu2 жыл бұрын
@@SuperValue350 This also has led to Singaporeans using public transport as well, it’s not like this cars being expensive was just to not gridlock the roads
@tanjunwei85978 ай бұрын
2032 Cross Island Line Extends to Jurong Lake District
@dansonng83692 жыл бұрын
May i know anyline alone Yio Chu Kang Rd to Seletar to AMK? If so, when?
@rexelgaming36322 жыл бұрын
When your home/workplace district gets mentioned
@nathishvel57256 ай бұрын
Just curious what software(s) were used to make this video
@FrikiObsoleto2 жыл бұрын
And the Buenos Aires metro? For when?
@babebibobuuu7515 Жыл бұрын
2:48 East West Line Changi Airport Branch becomes Thomson-East Coast Line.
@vincentng23922 жыл бұрын
Kuala Lumpur next?
@sergjack12 жыл бұрын
I really love watching your videos! Only one thing I would change is to remove the thing where the lines "bloat up" when they get extended, because that is very distracting and makes it difficult to track the progress of the metro system in the video.
@leobragaurbe2 жыл бұрын
It's so hard to track progress without the bloat up
@gargargargar2 жыл бұрын
I respectifully disagree. The "bloat up" makes it much clearer in terms of what line is being focused on.
@truenoong2 жыл бұрын
Insane
@emanuelelamborghini24292 жыл бұрын
Can you do Milan metro and suburban train system next?
@areebah82972 жыл бұрын
the circle line will finally be a complete circle
@linusfotograf2 жыл бұрын
Would love to see a video on Kaohsiung and its combined rail solutions
@placeholderblankspace2 жыл бұрын
This is all really convenient and all but at a certain point it feels so like just added convenience that isn't exactly necessary but is just a luxury to have
@crushedhearts2 жыл бұрын
Sad but how many of us will live to see 2040?
@nwyk1532 жыл бұрын
that is a lot of holes dugged up in the central areas.
@samanthaschnetzler78122 жыл бұрын
1:07 I knew it this was gonna happen
@mingway47172 жыл бұрын
2:50, TEL extend to Airport in 2040??
@louplayz75214 күн бұрын
2024 UPDATE: - The Thomson East Coast Line has been extended - The Thomson East Coast Line to Bayshore has been opened - Teck Lee is finally open - Punggol Coast Opened All these events happened as the order they are losted here.
@Lifestyle-lz5be14 күн бұрын
thank you for the info
@xjp2 жыл бұрын
What's the reason for making the JRL above ground? They have better noise reduction technology now?
@placeholderblankspace2 жыл бұрын
Taken from a May 10 2018 Straits Times article, "The LTA explained that an above-ground line can be built at a lower cost within a shorter period of time."
@linusfotograf2 жыл бұрын
They should extend lines to some of the islands
@alexandernikolo46312 жыл бұрын
Nah, Pulau Ubin is a nature reserve (reduce foot traffic to the island), Pulau Tekong is a military base, Pulau Semakau is a Landfill, Jurong Island is an industrial district that has restricted entry to non staff, and St.Johns, Kusu, Lazarus are too far away.
@AridChannelOfficialSG2 жыл бұрын
Most of the population lives on the main island, other islands are not for residential, except small private housing in Sentosa and a small village in Ubin. Others a Rd e either military bases or nature reserves
@linusfotograf2 жыл бұрын
@@alexandernikolo4631 I guess I meant Sentosa mainly
@alexandernikolo46312 жыл бұрын
@@linusfotograf XD if that’s the case Sentosa already have a light rail line, which is connected to the rest of the system at Harbour Front station.
@linusfotograf2 жыл бұрын
@@alexandernikolo4631 It does? I was there in 2016 and I had to take the bus.
@tonybob16602 жыл бұрын
Can I repost your video? thank you. 😘
@chenyeanmingtakumi90332 жыл бұрын
Can you do evolution of Kuala Lumpur Integrated Transit System and Hong Kong MTR?
@jeremytankard71962 жыл бұрын
pls do future of new york subway
@windydragon65222 жыл бұрын
But why not connect Punggol to Yishun?
@huaiwei2 жыл бұрын
There is provision for that.
@gelinrefira Жыл бұрын
Technically there are buses for that.
@紫藤-u1l2 жыл бұрын
No matter how many lines are there, there will always heavy traffic everywhere. People won't give up their cars and driving.
@hrithikrk4826 Жыл бұрын
That is until Singapore adds express services running parallel to the main network with trains running at higher speeds
@jamielye13718 ай бұрын
0:31 When the Punggol Coast will open 0:38 And this 0:45 and this too 0:55 this too
@matchmoved76512 жыл бұрын
Make Hong kong mtr,kcrc(2007) pls there have light rail on 80s to now.
@Bopper_2 жыл бұрын
can u make hong kong?
@kertchu Жыл бұрын
I wonder what will happen to the circle line’s branch once the rest of the line becomes a full circle?
@user-xk8sq1tg2j2 жыл бұрын
Can you please do the MALAYSIA MRT LINE?🙏🏻🙏🏻🙏🏻
@cornucopiahouse42042 жыл бұрын
I cannot imagine that, in 2040, the world would still be using a 1880s’ concept
@SiameseCheese2 жыл бұрын
What do you mean by 1880's concept?
@cornucopiahouse42042 жыл бұрын
en.wikipedia.org/wiki/London_Underground
@Supragt2 жыл бұрын
I love to watch this video. BTW I am from #singapore where this video is from.. 😂🇸🇬📹
@tanjunwei85978 ай бұрын
2034 Brickland opens as infill station
@EhWhatIsThisLa2 жыл бұрын
that's why a car there cost as much as a house.
@greek92442 жыл бұрын
You should do this history of Northern Ireland Translink railways. Or do future plans
@CoconutsWithDrag2 жыл бұрын
Can’t believe the circle line isn’t a circle!
@jonathanya1542 жыл бұрын
Another few years time will be full circle
@RmsJw2 жыл бұрын
Is there any place left for Singapore to build
@placeholderblankspace2 жыл бұрын
underground
@WestMerquisilvaTC1802 жыл бұрын
Name of the music?
@Drizzile27442 жыл бұрын
The Morning Comes - Alchemorph
@Wongwanchungwongjumbo2 жыл бұрын
Singapore 🇸🇬 has land Advantage over its Rival Hong Kong 🇭🇰 SAR that has Natural obstacles like Mountain ⛰️ made construction difficult for Expansion of Subways train 🚆.
@Nikita_Prime2 жыл бұрын
Make the metro saint-peterburg 1955-2030-s
@ExileRicochet132 жыл бұрын
You missed out on the Tuas South Extension of the East West Line, it will connect to the upcoming Tuas Seaport
@hrithikrk4826 Жыл бұрын
That extension was cancelled due to lack of development leaving the extra platforms at Gul Circle station unused
@ExileRicochet13 Жыл бұрын
@@hrithikrk4826 Where did you hear that from? It wasn't cancelled at all, they will only announce the Tuas South Extension when there are more developments around that area. Having an MRT line in Tuas South will certainly benefits those that are working at the PSA Tuas Harbour in the future as the port at Keppel and Pasir Panjang are due for redevelopment of Southern Waterfront corridor. Also ask yourself why the Gul Circle MRT Station are constructed on 2 different levels for both eastbound and westbound train? The stack platform are usually more common for underground stations such as City Hall, Raffles Place and Bayfront MRT stations. Such a design is the first for an aboveground station for Gul Circle
@hrithikrk4826 Жыл бұрын
@@ExileRicochet13 Yea I meant that there are no plans atm for the extension 😅
@legobrickingenthusiast44922 жыл бұрын
MOST trains in singapore are going to be Bombardier and ALSTOM by
@Lord-ov2gf2 жыл бұрын
can you do istanbul
@Minplazy2 жыл бұрын
Exciting but like how are we gonna figure out which one to take
@TheHairul92 Жыл бұрын
Can you draw MRT Kuala Lumpur/Valley Klang?
@drakonfyir2 жыл бұрын
Downtown line stage 3 extension to be like: Am I a joke to you?
@blindthinker2 жыл бұрын
Can you do Baku Metro Map (Azerbaijan) ?
@tanjunwei85978 ай бұрын
CRL3 Under Planning
@sergiorobles53212 жыл бұрын
I would like to see barcelona metro system!!
@aptiveviennapro Жыл бұрын
@MetroLiner, The 9th MRT line is not officialized by LTA and the name "Seletar Line" is just a speculated name for the 9th MRT Line. TL:DR - kzbin.info/www/bejne/pYiXkHuprKasbpo
@ballsaveukraine452 жыл бұрын
make MTR
@hanzz90832 жыл бұрын
what's on North-West of Singapore?
@huaiwei2 жыл бұрын
Mostly farmlands, nature reserves, an airbase, military training grounds, water catchment areas.
@BrawlStarsFan-0003 ай бұрын
imagine NEL merges with Sentosa express
@uporotaya_4ayka2 жыл бұрын
Жду теперь будущее Московского метро)
@красныйлис-е1и2 жыл бұрын
есть канале огурца и не одно видео
@Andrew-or2gf2 жыл бұрын
У него туманное будущее из-за приближающегося экономического кризиса в/на России.
@ccqpl2 жыл бұрын
Im actually moving to Evergreen Park Condominium and this helps me see that i can take the MRT to Defu via Tampines (im in secondary school at springfield and i want to go to Temasek poly)
@slobodyanyukandreigyps84472 жыл бұрын
TEL3 opens 13 November 2022
@Xtyster_svc139bsoe2 жыл бұрын
cool though
@芋頭丸-z6c2 жыл бұрын
bruh it felt like not long ago when I remember the bloo line was new
@placeholderblankspace2 жыл бұрын
same lol but it's been almost 10 years already since it started opening
@jamielye13717 ай бұрын
Keppel is NE2
@dileepbadavath62192 жыл бұрын
Please do other Asian cities metros by mentioning Km and stations
@muhammadfariz28392 жыл бұрын
I still wondering why they build new tunnel instead of take over the Dhoby Ghaut-Promenade section.
@placeholderblankspace2 жыл бұрын
wdym?
@muhammadfariz28392 жыл бұрын
@@placeholderblankspace Yeah, takeover the Dhoby Ghaut branch of Circle Line.
@placeholderblankspace2 жыл бұрын
@@muhammadfariz2839 which line do you mean should take over the Dhoby branch line?
@muhammadfariz28392 жыл бұрын
@@placeholderblankspace Thomson-East Coast Line.
@placeholderblankspace2 жыл бұрын
@@muhammadfariz2839 ohhh honestly prlly for better connectivity of Marina Bay to NEL/EWL since Marina Bay will be developed in the future. It actually really efficiently connects all the lines together with the DTL at Bayfront. and probably because taking over the branch line isn't as easy as it sounds, since TEL and CCL use different rolling stock, Dhoby to Esplanade stations would have to be reconfigured, and Promenade would be an absolute mess because TEL and CCL trains would be using the same platform.