Рет қаралды 9,406
Demo tank application: github.com/ind...
00:05 Intro
00:50 Check the IP of your Edge Device
01:15 Connect to your Edge Device
02:30 Go to the Industrial Edge Management App
02:35 Installing S7 Connector
02:45 Data Flow (Architecture)
04:10 Installing IE Databus
04:20 Installing Data Service
04:34 Instaling Performance Insight
06:00 Configuring Databus on the IEM
06:45 Installing Configurators if you don't have them (IEM OS)
07:05 Back to configuring the Databus on the IEM App
09:15 Configuring the S7 Connection to the PLC
10:30 Quick look at the demo project
10:55 Back to browsing the tags (S7 Connector)
11:23 Browsing specific Datablock (S7 Connector)
12:00 Adding tags to my configuration (S7 Connector)
13:34 Adjusting Edge Management Timers
14:05 Back to S7 Connector - Starting the project
14:17 S7 Connector - Diagnostic information
15:20 Using IE Databus Configurator to check if any data is coming
17:30 Configuring Data Service on the Edge Device
18:55 Vieving data in the Data Service
19:15 Creating a sample widget in Performance Insight