Nice... please give the next update soon from Kaalol to vadodara...😊
@rakeshtiwari88545 ай бұрын
Good work
@anuragnagar25146 ай бұрын
Good video Sir
@madhur37376 ай бұрын
Please mention package No on Title, Thumbnail also...Don't want view repeated packages....
@robo18able6 ай бұрын
Vadodara tk pura ho jaaye fir badhiya ho jayega
@arjunhar48666 ай бұрын
Usse kuch nhi hoga, pura mp border se vadodara tak complete hoga tabhi koi fayda pochega public ko
@robo18able6 ай бұрын
@@arjunhar4866 han but abhi godhra side jana ho mumbai se to NH48 hi better dikhata hai google,
@polock756 ай бұрын
Your video just awesome!! Please upload daily video 🥹🔥
@prakashchandravarma76376 ай бұрын
Verry good
@clothes9396 ай бұрын
Congratulations all team members of PNC 🎉🎉
@ygphc14623 ай бұрын
godhra bypass ka kam to baki he... !!!!!
@navintyagi626 ай бұрын
Thanks for wonderful narration. But this package godhara to kaalol ready before elections
@divypratapsingh11676 ай бұрын
Kota NH-27 WHEN??
@GauravBhagat-hg8ff3 ай бұрын
pune ring road❤❤❤❤🎉🎉🎉🎉
@zakaash2 ай бұрын
Any update for vadodara to godhra/thandla in September 2024. Can we go by this road from vadodara to godhra ?
@jitugujjar70246 ай бұрын
Good 👍
@indianarmyex6026 ай бұрын
Delhi mumbai express way per petrol CNG pump hai ke nahi won dikhvo
@s.lshivde13195 күн бұрын
मप्र से वङोदरा के बिच कितना बाकि हे।
@HENGKIMLENG-tp3lw5 ай бұрын
U-turn sections do not appear to have dedicated acceleration and deceleration lanes. This design choice could have several implications: Potential Challenges: * **Merging Difficulties:** Without dedicated lanes for acceleration and deceleration, vehicles entering or exiting the expressway at U-turns may face challenges in merging with the high-speed traffic. This could lead to disruptions in traffic flow and increase the risk of accidents. * **Reduced Safety:** The absence of these lanes may compromise safety, especially for vehicles entering the expressway, as they may need to accelerate quickly to match the speed of ongoing traffic. * **Congestion:** During peak hours, the lack of acceleration and deceleration lanes could contribute to congestion at U-turn points, as vehicles may need to wait for larger gaps in traffic to safely merge. Possible Reasons for this Design: * **Cost Considerations:** Constructing additional lanes can be expensive, and in some cases, budget constraints may have led to the omission of acceleration and deceleration lanes. * **Land Availability:** The availability of land may also be a limiting factor, especially in areas where the expressway passes through densely populated regions. * **Traffic Volume:** The frequency of U-turns and the expected traffic volume at these points may have been factored into the design decision. If U-turns are infrequent and traffic volume is low, the need for dedicated lanes might be considered less critical. Mitigation Measures: Even without dedicated lanes, certain measures could be implemented to mitigate potential challenges: * **Signage:** Clear and prominent signage can alert drivers to the upcoming U-turn and advise them to adjust their speed accordingly. * **Rumble Strips:** Rumble strips can be installed on the approach to U-turns to alert drivers and encourage them to slow down. * **Reduced Speed Limits:** Lowering the speed limit near U-turns can provide vehicles with more time to merge safely. * **Traffic Signals:** In some cases, traffic signals could be installed to control the flow of traffic at U-turns and ensure safe merging. Overall, while the absence of acceleration and deceleration lanes at U-turns on the Delhi-Mumbai Expressway may present some challenges, careful design and traffic management strategies can help to mitigate these issues and ensure the safety and efficiency of the expressway.
@khemachandlilwani67496 ай бұрын
आब....बरौदरा....4....घडे.््का.....हो...जाएगा.....मुबंई.. से
@asertpoi33632 ай бұрын
Can I use it now to go from godhara to vadodara ? I have to travel tomorrow from Indore to vadodara.
@ibrahimrangrej51466 ай бұрын
When complete All project please 🙏
@Vamikapatel146755 ай бұрын
Vadodara to ghodhra chalu kab hoga?
@sidss87076 ай бұрын
When it's going to be started
@unrelentingaction61696 ай бұрын
Aur Godhra se Indore kaise ja sakte hai? Delhi to Mumbai expressway se
@Mihirpatel61626 ай бұрын
Godhra interchage se
@pratiktrivedi54604 ай бұрын
Hello Brother Can I travel from Godhra to Vadodara on this expressway ?
@harisheh70015 ай бұрын
🙏,Please Organize the 🔲 scan code with NRAI, NHAI Authority of India 🇮🇳 with a organize a Vehicle of 10,00,00,000 Lane Road Express way by a No Speed Limits Policy assurance of Man-made 🌉 Bridges for Pedestrian Safety sensors by Underground and Over-Bridge Policies. Train🚂🚋🚃🚋🚃🚋🚃Bus Routes Training ?Vehicles Train🚂🚋🚃🚋🚃🚋🚃 Experience with a Scan Matrix along with a Radar Sensors to be made along with 🔲 Matrix with Speed Limits maintained for Heavy Motor Vehicles.
@hanifraj1866 ай бұрын
Kalol se vadodara interchange please
@unrelentingaction61696 ай бұрын
Bhai Godhra se Delhi Mumbai expressway pe kaha se enter ho sakte hai?
@JunedMala-nr2zz3 ай бұрын
Daruniya Simla thi
@shijairock70685 ай бұрын
Next update kalol to vadodara
@Infraliveindia5 ай бұрын
Ji bhai
@khemachandlilwani67496 ай бұрын
Yeus
@harisheh70015 ай бұрын
🙏, Please arrange Route 1:-Jaipur to Delhi, Route 2:-Jaipur to Kolkata, Route 3:-Jaipur to Ahmedabad, Route 4:-Jaipur to Mumbai, Route 5:-Jaipur to Hyderabad, Route 8:- Jaipur to Katra, Route 6:-Jaipur to Srinagar- Ladakh. Route 7:-Jaipur to Katra, Route 8:-Jaipur to Bangalore, Route 9:-Jaipur to Chennai, Route 10:-Jaipur to Trivandrum, Route 11:- Jaipur to Mangalore, Route 12:-Jaipur to Calicut, Route 13:-Jaipur to Cochin, Route 14:-Jaipur to Coimbatore, Route 15:-Jaipur to Rameshwaram, Route 16:- Jaipur to Tuticorin (Thoothukudi). Route 17:-Jaipur to Vishakhapatnam, Route 18:-Jaipur to Vijayawada.
@divyaraajjadon45744 ай бұрын
Sir ji aap paise bhijwayiye abhi sabhi road taiyar karva deta hu.
@warrior_singh1114 ай бұрын
😂😂😂
@warrior_singh1114 ай бұрын
@@divyaraajjadon4574 😂😂 Sahi kaha, Faltu baate karte hai log
@harisheh70014 ай бұрын
@@divyaraajjadon4574 Everyone together has to pay the regular Income taxes through CTC?
@siddharthkumarpadhan47896 ай бұрын
Length bhi batao
@harisheh70015 ай бұрын
🙏, Please arrange Route 1:-Jaipur to Delhi, Route 2:-Jaipur to Kolkata, Route 3:-Jaipur to Ahmedabad, Route 4:-Jaipur to Mumbai, Route 5:-Jaipur to Hyderabad, Route 8:- Jaipur to Katra, Route 6:-Jaipur to Srinagar- Ladakh. Route 7:-Jaipur to Katra, Route 8:-Jaipur to Bangalore, Route 9:-Jaipur to Chennai, Route 10:-Jaipur to Trivandrum, Route 11:- Jaipur to Mangalore, Route 12:-Jaipur to Calicut, Route 13:-Jaipur to Cochin, Route 14:-Jaipur to Coimbatore, Route 15:-Jaipur to Rameshwaram, Route 16:- Jaipur to Tuticorin (Thoothukudi). Route 17:-Jaipur to Vishakhapatnam, Route 18:-Jaipur to Vijayawada.
@harisheh70015 ай бұрын
🙏,Please Organize the 🔲 scan code with NRAI, NHAI Authority of India 🇮🇳 with a organize a Vehicle of 10,00,00,000 Lane Road Express way by a No Speed Limits Policy assurance of Man-made 🌉 Bridges for Pedestrian Safety sensors by Underground and Over-Bridge Policies. Train🚂🚋🚃🚋🚃🚋🚃Bus Routes Training ?Vehicles Train🚂🚋🚃🚋🚃🚋🚃 Experience with a Scan Matrix along with a Radar Sensors to be made along with 🔲 Matrix with Speed Limits maintained for Heavy Motor Vehicles.
@harisheh70015 ай бұрын
🙏, Please arrange Route 1:-Jaipur to Delhi, Route 2:-Jaipur to Kolkata, Route 3:-Jaipur to Ahmedabad, Route 4:-Jaipur to Mumbai, Route 5:-Jaipur to Hyderabad, Route 8:- Jaipur to Katra, Route 6:-Jaipur to Srinagar- Ladakh. Route 7:-Jaipur to Katra, Route 8:-Jaipur to Bangalore, Route 9:-Jaipur to Chennai, Route 10:-Jaipur to Trivandrum, Route 11:- Jaipur to Mangalore, Route 12:-Jaipur to Calicut, Route 13:-Jaipur to Cochin, Route 14:-Jaipur to Coimbatore, Route 15:-Jaipur to Rameshwaram, Route 16:- Jaipur to Tuticorin (Thoothukudi). Route 17:-Jaipur to Vishakhapatnam, Route 18:-Jaipur to Vijayawada.
@harisheh70015 ай бұрын
🙏,Please Organize the 🔲 scan code with NRAI, NHAI Authority of India 🇮🇳 with a organize a Vehicle of 20,00,00,000 Lane Road Express way by a No Speed Limits Policy assurance of Man-made 🌉 Bridges for Pedestrian Safety sensors by Underground and Over-Bridge Policies. Train🚂🚋🚃🚋🚃🚋🚃Bus Routes Training ?Vehicles Train🚂🚋🚃🚋🚃🚋🚃 Experience with a Scan Matrix along with a Radar Sensors to be made along with 🔲 Matrix with Speed Limits maintained for Heavy Motor Vehicles.