Project key highlights
- 5 cable tanks: manufacturing and installation in the cargo hold, each 8200mm high, 10200mm wide, weighing a total of 72t. These tanks are used for collecting and storing cables recovered from the seabed.
- Cable walkway: manufacturing and installation, weighing 19t in total. It guides cables being recovered from the seabed to the cable tanks.
- Cable roller: manufacturing and installation of a 2m diameter roller with independent rotation of PS and StB parts, weighing over 4t.
- Bow chute: manufacturing and installation, weighing over 4t, designed with a minimum possible gap (2mm) with the bow roller. It serves as a bow roller foundation and cable guidance, capable of withstanding loads over 20t.
- Additional works
* Installation of cable recovery winch and tensioners
* Installation of 10-40 ft containers (7 pcs in total)
* Rebuilding of cargo hold hatches
* Rebuilding of the cargo hold ventilation casing and forward mast
* Relocation and rebuilding of forward mooring appliances