Рет қаралды 10,841
In anticipation of the manufacture of windows I decided to do concrete work. Namely, he poured floors in the boiler room, and also made the insulation of the blind area and the basement under the terrace, and also concreted the blind area under the future terrace. And he also made flooring of the boards on the terrace, while in the draft version, ie. without grinding and painting.