Рет қаралды 194,213
A 95 meters long and overall 592 tons heavy formation transported a 260 tons heavy transformer from Leer to a distribution station near Conneforde, Germany ( • Heavy Transport - 600 ... ). On a parking space the lenght of the High Girder Bridge of the Kahl Heavy Haulage corporation was reduced by 12 meters to reach a lower curve radius.
This is the last part of a threepart series about the transformer transport from Leer to Conneforde:
◾️ Part 1: Unloading the transformer off the barge: • Anlanden eines 260-Ton...
◾️ Part 2: Departure of the 592 tons heavy Transformer Bridge: • Heavy Transport - 600 ...
◾️ Part 3: Conversion of the Transformer Bridge
Subscribe: / @hd1080ide
Facebook: / hd1080ide
Twitter: HD1080ide