The car charging example is off by a magnitude. The 3200 MW the power plant produces, can only charge 16000 cars at 200kw at the same time, not 1.6 million.
@TheOtherSteelАй бұрын
00:35 -- "...estimated at fifty-eight dollars [sic] billion..." That must be: "...estimated at fifty-eight billion dollars..."
@nvbnvb2240Ай бұрын
its all about scale wanted it cheap you should have ordered 10 times same design or better(ur missing easy way to retro fit aca enable 120 years or longer + bye swapping out boiler...the biggest cost is the concrete shell and shielding bye making design with swapable boiler you automaticly make the project nearly free (thanks to inflation)) aca 70% nclr 0 co2