🚪 Mong Kok East Station Platform 3 has full platform gates now! MTR East Rail Line APGs installation

  Рет қаралды 6,575

SF's Rail Depot

SF's Rail Depot

Күн бұрын

This video was filmed between 2024/10/14 and 2025/01/07.
Mong Kok East Station is the 13th to start installing APGs, and it is among the most difficult stations to install APGs due to its curve. The first set of platform gates at Platform 3 were installed in late September. It was then fully operational by early January of the next year. Lo Wu, University, and Mong Kong East Stations are installing platform gates at the time of uploading. All stations of the East Rail Line will be installed with platform gates before the end of 2025.
旺角東站是第13個開始安裝閘門的車站,此站是整個工程中其中一個最難安裝閘門的車站,因為此站的彎道比之前的車站更大。3號月台閘門於9月尾開始安裝,至翌年1月初全面投入服務,大部分閘門都集中在11-12月安裝。截至影片上載時間,正在安裝閘門的車站有羅湖,大學和旺角東站。東鐵綫所有車站將會在2025年或之前完成安裝閘門。
東鐵綫閘門安裝系列 East Rail Line APG installation
• 東鐵綫閘門 East Rail Line p...
If your KZbin language is set to any variant of Chinese, you should see the description in Chinese. For any language other than Chinese, the description will be in English by default.
#mtr #eastrailline #platformgates
Hong Kong's Railway 香港鐵路
• 香港鐵路大事記 Big events of ...
• 港鐵屯馬綫&東鐵綫 MTR Suburban...
• 港鐵市區線 MTR Urban Lines
• 香港輕鐵 Hong Kong Light Rail
• 其他香港鐵路 Other Hong Kong...
• 中國高鐵 China High speed ...
• 香港電車 Hong Kong Tramways
• 鐵路展覽 Railway Exhibitions
China Metro Systems 中國大陸地鐵系統
• 深圳地鐵及有軌電車 Shenzhen Met...
• 廣州地鐵及有軌電車 Guangzhou Me...
• 成都軌道交通 Chengdu Rail Tr...
• 東莞軌道交通 Dongguan Rail T...
• 北京地鐵 Beijing Metro 2014
Non-HK railways 香港以外鐵路
• 中國鐵路 China Railway
• 澳門輕軌 Macau LRT
• 日本鐵路 Japan Railways (東...
• 新加坡鐵路 Singapore Railwa...
• 台北捷運 Taipei Metro
• Playlist
• 日本鐵路 Japan Railways (京...
______________________________
If you wish to use any footage, please contact us via X or email. Do not reupload footage without permission.
如有興趣使用任何片段,歡迎在X或電郵聯絡,請勿盜用影片。
My personal website: sfrails.info/en

Пікірлер: 19
@henrywongsh
@henrywongsh Ай бұрын
記錄得十分完整!👍
@Kenneth584
@Kenneth584 Ай бұрын
2號月台而家裝緊,咁所有北行列車就要暫時改用1號月台上落客
@SFsRailDepot
@SFsRailDepot Ай бұрын
目前未有咁嘅安排
@fsamtrandcat1stchannel
@fsamtrandcat1stchannel Ай бұрын
​@@SFsRailDepot 如果咁安排反而好啲
@SFsRailDepot
@SFsRailDepot Ай бұрын
入1台要非常慢速行,會增加行車時間
@fsamtrandcat1stchannel
@fsamtrandcat1stchannel Ай бұрын
@@SFsRailDepot 之前SHT 2同3台裝閘門嗰陣都借1同4台上落客
@roadgloucester486
@roadgloucester486 Ай бұрын
@Kenneth584 其實都唔可行,因為MKK 2台同3台嘅路軌範圍喺同一邊,當有列車喺KOT入緊嚟MKK 3台嘅時候,班裝閘門嘅工程人員其實係企緊喺2/3台嘅路軌位置,可能有機會導致工程人員受傷,要保障佢哋嘅安全為上,所以呢個安排唔可行;但反而2台裝曬後,到裝1台嘅時候,就可以喺日間時間進行,因為1台係獨立一邊路軌位置。
@Kenneth584
@Kenneth584 Ай бұрын
之後裝1號同2號月台嘅閘門,不過我覺得呢兩個月台唔一定要收車時間裝,可以日頭裝
@fsamtrandcat1stchannel
@fsamtrandcat1stchannel Ай бұрын
@@Kenneth584 其實如果裝2台就要喺收車之後裝,因為可以保障港鐵工程團隊裝閘門嘅生命安全
@leecoby6373
@leecoby6373 14 күн бұрын
東鐵線的歷史快要消失了😢
@hokwok6659
@hokwok6659 Ай бұрын
我記得東鐵好似有13個站依家好似仲爭羅湖站未整完幕門?
@mcchk1023
@mcchk1023 Ай бұрын
仲有大學
@fsamtrandcat1stchannel
@fsamtrandcat1stchannel Ай бұрын
@@hokwok6659 同埋MKK
@fsamtrandcat1stchannel
@fsamtrandcat1stchannel Ай бұрын
同埋MKK
@SFsRailDepot
@SFsRailDepot Ай бұрын
羅湖、大學、旺角東都仍然在安裝閘門
@austiny9194
@austiny9194 Ай бұрын
@@SFsRailDepot +古洞KTU,surprise咧
[openBVE 特輯 Ep.2] 港鐵東鐵綫旺角東站宣導廣播
9:21
My scorpion was taken away from me 😢
00:55
TyphoonFast 5
Рет қаралды 2,7 МЛН
那日下晝 我登上落馬洲開往金鐘的東鐵綫列車
5:26
MTR Hong Kong
Рет қаралды 504 М.
去完(新世紀廣場)港鐵東鐵綫R train 由旺角東至金鐘
15:25
MTR A753 A754 Q train Channel
Рет қаралды 1 М.
Evolution of the Hong Kong MTR 1910-2022 (geographic map)
7:59
Metro Liner
Рет қаралды 150 М.
My scorpion was taken away from me 😢
00:55
TyphoonFast 5
Рет қаралды 2,7 МЛН