Рет қаралды 6,575
This video was filmed between 2024/10/14 and 2025/01/07.
Mong Kok East Station is the 13th to start installing APGs, and it is among the most difficult stations to install APGs due to its curve. The first set of platform gates at Platform 3 were installed in late September. It was then fully operational by early January of the next year. Lo Wu, University, and Mong Kong East Stations are installing platform gates at the time of uploading. All stations of the East Rail Line will be installed with platform gates before the end of 2025.
旺角東站是第13個開始安裝閘門的車站,此站是整個工程中其中一個最難安裝閘門的車站,因為此站的彎道比之前的車站更大。3號月台閘門於9月尾開始安裝,至翌年1月初全面投入服務,大部分閘門都集中在11-12月安裝。截至影片上載時間,正在安裝閘門的車站有羅湖,大學和旺角東站。東鐵綫所有車站將會在2025年或之前完成安裝閘門。
東鐵綫閘門安裝系列 East Rail Line APG installation
• 東鐵綫閘門 East Rail Line p...
If your KZbin language is set to any variant of Chinese, you should see the description in Chinese. For any language other than Chinese, the description will be in English by default.
#mtr #eastrailline #platformgates
Hong Kong's Railway 香港鐵路
• 香港鐵路大事記 Big events of ...
• 港鐵屯馬綫&東鐵綫 MTR Suburban...
• 港鐵市區線 MTR Urban Lines
• 香港輕鐵 Hong Kong Light Rail
• 其他香港鐵路 Other Hong Kong...
• 中國高鐵 China High speed ...
• 香港電車 Hong Kong Tramways
• 鐵路展覽 Railway Exhibitions
China Metro Systems 中國大陸地鐵系統
• 深圳地鐵及有軌電車 Shenzhen Met...
• 廣州地鐵及有軌電車 Guangzhou Me...
• 成都軌道交通 Chengdu Rail Tr...
• 東莞軌道交通 Dongguan Rail T...
• 北京地鐵 Beijing Metro 2014
Non-HK railways 香港以外鐵路
• 中國鐵路 China Railway
• 澳門輕軌 Macau LRT
• 日本鐵路 Japan Railways (東...
• 新加坡鐵路 Singapore Railwa...
• 台北捷運 Taipei Metro
• Playlist
• 日本鐵路 Japan Railways (京...
______________________________
If you wish to use any footage, please contact us via X or email. Do not reupload footage without permission.
如有興趣使用任何片段,歡迎在X或電郵聯絡,請勿盜用影片。
My personal website: sfrails.info/en