It’s time for the real test of curved platforms. Sha tin is already slightly curved on P1 and P4, so the gates can be installed in the same matter with maybe some different calculations for the platform curve.
@MtrmixhongkongsubwaytrainJC5 ай бұрын
News: Sheung Shui Platform 2 is completed today 5/4/24