How did we design a 200-tonne wall traveller for HS2's Copthall Tunnel?

  Рет қаралды 1,814

PERI UK

PERI UK

Күн бұрын

The wall forms are built from special modular steel panels. Each set is designed to build 20m-long and 7.5m-high walls. Discover how we worked with sub-contractor Kilnbridge to deliver this bespoke 200-tonne traveller.

Пікірлер: 1
@brianl5504
@brianl5504 10 ай бұрын
Looks good but literally space for a scissor lift to run down the inside isn't a very comfortable amount of working area, especially for guys tying steel or the guys feeding through the through ties
ALL MIVAN COMPONENTS, MATERIAL, PARTS, THING,
24:57
DC SITE ENGINEER
Рет қаралды 106 М.
Mom had to stand up for the whole family!❤️😍😁
00:39
ДЕНЬ УЧИТЕЛЯ В ШКОЛЕ
01:00
SIDELNIKOVVV
Рет қаралды 3,9 МЛН
My Daughter's Dumplings Are Filled With Coins #funny #cute #comedy
00:18
Funny daughter's daily life
Рет қаралды 28 МЛН
这到底是怎么做到的 #路飞#海贼王
00:10
路飞与唐舞桐
Рет қаралды 4,1 МЛН
HS2 Old Oak Common Station Construction
9:36
Geoff Marshall
Рет қаралды 113 М.
Major progress made on HS2’s Copthall Green Tunnel
6:10
HS2 Ltd
Рет қаралды 35 М.
How the Fehmarnbelt Tunnel is being built
3:41
FemernAS
Рет қаралды 614 М.
Why Retaining Walls Collapse
12:51
Practical Engineering
Рет қаралды 3,1 МЛН
Echafaudage M368
3:37
Tubesca-Comabi
Рет қаралды 12 М.
HS2 Project Update, May 2024
7:51
HS2 Ltd
Рет қаралды 80 М.
update on the Dom and some copthall tunnel
6:03
SIMONC
Рет қаралды 1,6 М.
HS2 fly through of the Phase One route between Birmingham and London
32:17
High Rise Concrete Construction
4:04
Concrete Forms
Рет қаралды 602 М.
Mom had to stand up for the whole family!❤️😍😁
00:39