how did you get the budgeted variable cost per hour?
@Jv-gw5oz8 жыл бұрын
Your videos have been really helpful. Thank you so much!!
@violavelvette5298 жыл бұрын
Hey there, there was an abrupt stop to the end of the video. Is there a second video to this dual rate method?
@titozedan40165 жыл бұрын
i want ask you question should the actual hours and budget hours as total be the same and if not how can we fix it
@kanabektu11 ай бұрын
Please answer this question? Sir
@mtondimartha3 жыл бұрын
Thank You
@maimunaakter69303 жыл бұрын
Thanks a lot.
@reemdoaa35296 жыл бұрын
Thank u 🙆
@merrystarstudio78452 жыл бұрын
Hi, dear prof I don't really get clear about your idea when talking about "so we are not over/under applied because we got 6000+9000==7000+8000." Over/under applied are referring to actual and applied overhead, and we are just talking about budgeted and applied here...
@sacredpacer66394 жыл бұрын
hi i have this task and i have no idea how to solve it can any one help me out . The task of dual-rate three-color limiter. Given: the first Bucket capacity is 1600 token; capacity of the second Bucket is 2000 token; at start moment both buckets are full; mean packet rate in the network is 4000 bps (first bucket); maximum packet rate in the network 6000 bps (second bucket); at time t1 = 0 packet of 900 bytes is coming; at time t2 = 500 ms packet of 1000 bytes is coming; at time t3 = 800 ms packet of 500 bytes is coming. To define options for packet servicing (transmit to the network, transmit to the network with the marking, the packet is drop).