How To Create A Risk Register [Step By Step Guide]

  Рет қаралды 47,437

Proper Project Management

Proper Project Management

Күн бұрын

Пікірлер: 164
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
🚀Get my project management templates 👉 properprojectmanagement.com/project-management-templates/
@TheRealJAHWHO
@TheRealJAHWHO 2 жыл бұрын
THANK YOU!!! subscribing is a no brainer. I really appreciated your explanation, very thorough! I felt like I was getting a 1:1 session. Very appreciated!!!!
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Thanks so much for the kind words Joshua. Really appreciate it and pleased to hear it was useful for you
@nickybrock1215
@nickybrock1215 Жыл бұрын
Hello, Thank you for this. I am studying this topic and thanks to this video, I now how a better understanding of what kinds of things should be on the risk registry. I truly appreciate the guide in excel. This is truly helpful!
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Glad it was helpful! Thank you for dropping a comment to let me know.
@1step2life
@1step2life Жыл бұрын
Wow, I tip my hat to you, you're such an amazing teacher. I would love to have a copy of your template. Thank you
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Thanks so much 😊 Sure, will get it over to you
@dennismathuloe2790
@dennismathuloe2790 Ай бұрын
Hi, Thanks for this use full presentation, its so simple and easy to apply and also the excel guide is super fantastic.
@ProperProjectManagement
@ProperProjectManagement Ай бұрын
You are welcome!
@37Hulk
@37Hulk 2 жыл бұрын
Easy to follow along, and quickly created , Excellent Video.
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Glad it helped! Thanks!
@Redberry_15
@Redberry_15 2 жыл бұрын
Thank you so much for the Risk register step by step guide tutorial. I would love to have a copy of the template
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
You're welcome Oluwakemi. Sure, just send me an email and I'll get it over to you!
@amandaoconnor6067
@amandaoconnor6067 2 жыл бұрын
THANK YOU. Just starting a new role and would love a copy of your formatted spreadsheet. It was an excellent presentation and very easy to follow.
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Thanks Amanda. Just send me an email and I'll get it over to you. All the best with your new role!
@kengormley4530
@kengormley4530 2 жыл бұрын
hi great risk register & risk register scale .......could you send on both please ??
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hi Ken, send me an email and i'll get it over to you
@maxinepears9898
@maxinepears9898 2 жыл бұрын
Thank you so much for sharing. I am so glad to have found you. Please may I have a copy of your completed template.
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Thanks Maxine. Sure, just send me an email and I'll get it over to you
@gabrielosu6230
@gabrielosu6230 2 жыл бұрын
great session Paul, made so much sense, want to build an information security risk register if you can share a template will be happy...
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Thanks, though my name is Jeremy haha. Sure will get it over to you
@bee69ful
@bee69ful 7 ай бұрын
Very informative and easy to understand. Thank you so much. I did purchase the templates and find them very very useful
@ProperProjectManagement
@ProperProjectManagement 7 ай бұрын
Amazing. So pleased to hear this. Thanks and for letting me know. All the best!
@preciousmapfiro1233
@preciousmapfiro1233 2 жыл бұрын
Hithanks for your brilliant presentation.may l please have the template .
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Great to hear it Precious. Sure just send an email and I'll send it there
@preciousmapfiro1233
@preciousmapfiro1233 Жыл бұрын
@@ProperProjectManagement THANK YOU IN ADVANCE and HAPPY NEW YEAR !!
@giftichekare5086
@giftichekare5086 2 жыл бұрын
This is great. Please I need the template. thanks
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Great to hear it! Sure just send me an email.
@jreh3811
@jreh3811 Жыл бұрын
How did you create the colored scale? I would like to input that into the register.
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
I made that externally and added it as a picture image. You could create the same within excel, though.
@ayomideosukoya391
@ayomideosukoya391 3 жыл бұрын
Wow this is detailed and really helpful. I am finding it hard to copy the formula correctly. Kindly send me the complete template and the formula. Thank you
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Thanks for the kind words Ayomide. Absolutely, send me an email and I'll send the template over to you.
@CeciliaSaguet
@CeciliaSaguet Жыл бұрын
@@ProperProjectManagement Could you please send it to me as well.
@netty8374
@netty8374 Жыл бұрын
Kindly send me a copy too. Thank you
@ElvyJ1211
@ElvyJ1211 2 ай бұрын
This is excellent, would you be able to provide me a copy of the template, please. Would it be possible to add an inherent risk column as well.
@jayblack6683
@jayblack6683 2 жыл бұрын
I want to thank you for the very informative details you have provided, you explain things very well. I would love to have a copy of the Template
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hello Jay. Pleased to hear it was useful; thanks for the kind words. Sure, just send me an email and I'll get it over to you.
@ntandomgabhi1422
@ntandomgabhi1422 Жыл бұрын
Good morning Thank you for the information I'm doing my postgraduate in project management I have learned a lot from your videos It is possible to get the risk register template Regards
@hussainwarraich8139
@hussainwarraich8139 2 жыл бұрын
Very informative and helpful as you explained in details! Thanks for sharing 😊
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Great to hear Hussain. Thanks for the kind words and pleased to hear it was helpful for you :)
@AsharHasan-fu3ek
@AsharHasan-fu3ek 2 жыл бұрын
Is there any way we can tag risk id in project plan? So when going through the plan we know if there is any risk associated with any task.
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
I don't see why not. You would of course need unique risk identifiers for this to work, though.
@prm2335
@prm2335 2 жыл бұрын
Thank you so much. Very useful.
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
You're welcome :D
@shatadalt634
@shatadalt634 3 жыл бұрын
Hello Paul, Great presentation with practical explanation. Please can you share template you just showed here ? thanks shaq
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Hello Shatadal. Thanks for the kind words. If you send me an email (which mine can be found on my channels about page - kzbin.infoabout), I'll get this sent right over to you! All the best.
@Nadiapm2001
@Nadiapm2001 5 ай бұрын
Hi there, this is brilliant! May I please have a copy, too?
@sammittens4589
@sammittens4589 2 жыл бұрын
Thanks so much. Just got tasked with this at work and had no idea what I was doing!! Regarding the the Risk Register Scale that you created earlier on the validation sheet, is that created in the spreadsheet cells and then saved as an image? Also, is there a way to apply a formula to calculate across the entire row/down the colum, while keeping the first number as permanent and only changer the second number? Using the same 5 x 5 number format that you used and pretending we're starting at A1 (being 5 for Probability) making B5 1 for Impact, I applied the formula to B1: =A1*B5, which gives the correct result (5) for that cell, but when I drag across the row, it keeps the same shape (ie, next cell formula becomes =B1*C5 (instead of A1*C5) which gives right result by chance despite wrong method, but then the wrong results start after that at D1, where formula is =C1*D5 (30) (instead of A1*D5) ) where I need the first data cell to stay the same for the right result (ie, second result needs to be =A1*C5) ... Must be so confusing to read, sorry!! The issue is that rather than keeping A1 in the formula and multiplying with B5, C5, D5, E5, the first number in the equation is shifting across as well, so rather than staying at A1, it's multiplying B1 and then C1 etc... If that makes sense and there is a solution, I'd love to hear it! I know it's not much effort to manually type in but trying to enhance my Excel skills! Thanks!!!
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hi Sam. That's correct - it was previously created and inserted as an image. Regarding the formula, you can leverage the $ symbol in front of the first number - this article explains it in much better detail than I could explain here: www.extendoffice.com/documents/excel/2500-excel-constant-cell-value-reference.html
@fatousarrdarboe3725
@fatousarrdarboe3725 3 жыл бұрын
Hello Paul, its A superb presentation and would love to have it if possible. thank you
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Hello Fatou, thanks for your kind words. If you send me an email I'll send it right over to you :)
@vinitpandey7636
@vinitpandey7636 3 жыл бұрын
Hello Paul , very nice video.
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Thank you Vinit; hopefully it was helpful
@Meme01043
@Meme01043 4 ай бұрын
Very helpful Thank you so much
@ProperProjectManagement
@ProperProjectManagement 4 ай бұрын
You're welcome!
@Meme01043
@Meme01043 4 ай бұрын
@@ProperProjectManagement your tutorial saved my ass. Could you make more detailed ones ?
@ahmadbakr2485
@ahmadbakr2485 3 жыл бұрын
This is incredibly thorough and beneficial. To my dismay, I'm having a difficult time copying the formula. Please provide me the template and the formula.
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Thanks so much Ahmed . If you send me an email I'll get the template right over to you - my email can be found in my about page of my channel. Take care.
@yuenfen2160
@yuenfen2160 Жыл бұрын
Thank you and very useful video
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Glad it was helpful! Thank you Yuen!
@richardlaimo8362
@richardlaimo8362 2 жыл бұрын
Can I have a copy of this template. Thanks
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hi Richard. Sure, just send me an email and I'll get it over to you.
@urszulakrysiak8657
@urszulakrysiak8657 2 жыл бұрын
great presentation; can i get template and formula, please
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Thanks, Urszula. sure, just send me an email and I will get it right over to you!
@RareSense
@RareSense 2 жыл бұрын
Hi l bought the 8 templates but the project timeline one is locked?….
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hello, that's news to me; sorry about this! Send me an email theproperprojectmanagement[at]gmail.com and I will get this resolved for you.
@sirajahmed4944
@sirajahmed4944 2 жыл бұрын
Hey, very informative video. I would like to have the template but not sure how to get your mail address? Can you help
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hello Siraj. Thanks! You can find my email via my channels about page.
@sammust9238
@sammust9238 2 ай бұрын
I need this template too. Thanks in advance.
@samuel4092
@samuel4092 2 жыл бұрын
You absolute beauty. Could you create a full RAID log in Excel
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Thanks Sam... I shall get recording!
@samuel4092
@samuel4092 2 жыл бұрын
@@ProperProjectManagement Thanks.
@obinnaokoli9029
@obinnaokoli9029 10 ай бұрын
thanks for the explanation, pls I would love a copy of the risk template
@ProperProjectManagement
@ProperProjectManagement 9 ай бұрын
Sure, will get it sent over.
@shahrozekhan4404
@shahrozekhan4404 2 жыл бұрын
Could you please share with me the template? I cannot find an email address in the about section of the channel.
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hello Shahroze, its under business enquiries.
@tedhodnett5389
@tedhodnett5389 3 жыл бұрын
Hi, this was of great help and very informative, could I please request a copy of both formats please.mzny regards
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Thanks Ted, thanks for the kind words. Sure, send me an email and I'll get them sent over to you!
@peterawomoyi2251
@peterawomoyi2251 2 жыл бұрын
Very detailed information. Thanks. Can you please send me your template. Thanks.
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Thanks Peter. Sure, just send me an email and I'll get it over to you.
@SidSoman
@SidSoman Ай бұрын
I would like to have this template.
@netty8374
@netty8374 Жыл бұрын
Hi, thank you for this info. Starting a new role and would need your template. 😊
@ProperProjectManagement
@ProperProjectManagement 11 ай бұрын
Best of luck with your new role!
@paulstrachan3081
@paulstrachan3081 3 жыл бұрын
Hi, great video. Could I have the risk register template also please? Thanks, Paul
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Hello Paul - sure. Please send me an email to theproperprojectmanagement[at]gmail.com and I'll respond with the template :)
@paulstrachan3081
@paulstrachan3081 3 жыл бұрын
Hey, sorry, I sent an email yesterday shortly after your prompt reply. Did you miss it in your junk? Thanks, Paul
@wilsonsiroi2024
@wilsonsiroi2024 6 ай бұрын
Iam so impressed with your presentation here. I am not an expert in excel but would really love to create the same to use. Will you please kindly send me the template. I would be very grateful. Thank you
@udaygollapalli3252
@udaygollapalli3252 3 жыл бұрын
Hey, this was a very useful session. It would be great if you could share across the template.
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Thanks Uday, glad it was helpful! If you send me an email I will reply with the template there. You can find my email in my about page of my channel. Take care
@anuradhaguruge6858
@anuradhaguruge6858 3 жыл бұрын
Hi Thanks for sharing.Could i have risk register template ?
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Hi Anuradha. Yes, of course. Feel free to send me an email and request there. I'll send over right away: theproperprojectmanagement[at]gmail.com
@besonalora3572
@besonalora3572 Жыл бұрын
Absolutely great I would love the template but I do not see your email ?
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Hello. Thank you. You can get it via my channels about page.
@akramqubati508
@akramqubati508 3 жыл бұрын
Hi Paul ,I need this template please?
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Hello Akram. Feel free to send an email to my email (found in my about page on my channel) and I'll get it over to you right away! :)
@krt6442
@krt6442 2 жыл бұрын
Love this. I sent you an email requesting the formula for the priority level. Thanks.
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Thank you KRT! Received, working on this right now!
@krt6442
@krt6442 2 жыл бұрын
@@ProperProjectManagement thx friend
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
@@krt6442 Your welcome. Take care!
@olayioyeseun2758
@olayioyeseun2758 4 ай бұрын
Hello, thanks for the video please can i have a copy of the risk register. Thanks
@GinaGani-vo9fc
@GinaGani-vo9fc Жыл бұрын
Thanks for this great tutorial and video. Interested in the template sir? How do i get your email to request for this template please? Thanks
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Hello. Via my YT's about page, thanks
@GinaGani-vo9fc
@GinaGani-vo9fc Жыл бұрын
@@ProperProjectManagement Thank you for your reply. I just did. Thank you in advance
@johndonagher4285
@johndonagher4285 9 ай бұрын
Great video man
@ProperProjectManagement
@ProperProjectManagement 9 ай бұрын
Glad you enjoyed. Thank you!
@simonsobah-ampong8026
@simonsobah-ampong8026 10 ай бұрын
Good stuff. Just subscribed.
@ProperProjectManagement
@ProperProjectManagement 10 ай бұрын
Awesome!
@eugenephiri6703
@eugenephiri6703 2 жыл бұрын
Kindly asking for the template please
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hi Eegune. Sure just send me an email and I'll get it over to you
@afsal1314
@afsal1314 2 жыл бұрын
Beneficial video, could you send me the template and formula.
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hello Afsal. Sure, send me an email and I'll send it your way
@jwahlton
@jwahlton Жыл бұрын
I would like a copy of the risk register. How do I email you?
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
You can get my email from my channels about page. Thanks
@hellwworld9625
@hellwworld9625 Жыл бұрын
totally loved it
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Thanks, glad it was useful!
@kabeloogomoditseshashane421
@kabeloogomoditseshashane421 20 күн бұрын
Hi, thanks for this video. It was very useful. Please share the risk register over the email
@marjantavakoli395
@marjantavakoli395 2 жыл бұрын
It was really helpful and make it easy 🙏could you please send me copy of template .Thanks
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Good to know Marjan. Sure just send me an email.
@corneliadye-sharpe3914
@corneliadye-sharpe3914 2 жыл бұрын
Hi great tutorial! would you send me the template please?
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hi Cornelia. Thanks for the kind words. Send me an email and I'll get it over to you right away :)
@annekinyanjui5585
@annekinyanjui5585 2 жыл бұрын
Thanks for wonderful presentation. Kindly assit with the template
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Thanks Anne, pleased to hear it!
@GeorgeFoster-jb6cw
@GeorgeFoster-jb6cw Жыл бұрын
Can You Please send me Both risk Register templets , Very interesting
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Hello George. Sure thing!
@toniakparteh8964
@toniakparteh8964 3 жыл бұрын
i need this template please
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Hello Tonia. Send me an email via my about page and I'll send it over right away. Best.
@d4ss29
@d4ss29 3 жыл бұрын
Hi , i have sent an email with request to get risk register template. plz share. thx
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Hello. I have just sent across. Look out for it :)
@fredrickoareojehomon1932
@fredrickoareojehomon1932 8 ай бұрын
Pls I need the template. Thanks
@ProperProjectManagement
@ProperProjectManagement 7 ай бұрын
Hey Frederick. Link for the template is in the description. Thanks.
@Ludwigfw
@Ludwigfw 2 жыл бұрын
Hello! Would you please send me a copy of your template? Thank you very much!
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hello; sure just send me an email and I'll send it right over to you!
@terrymorocco5327
@terrymorocco5327 2 жыл бұрын
Would love a copy of this
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hello Terry. Sure, just send an email so I can get it to you. Thanks
@waltonsaunders9400
@waltonsaunders9400 2 жыл бұрын
How do I get a free risk register?
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hello Walton. Send me an email (you can find it in my channels about page) and I'll send it to you directly from there.
@beamatasova4949
@beamatasova4949 10 ай бұрын
hi, Well explained video, could you please send me the template?
@ProperProjectManagement
@ProperProjectManagement 9 ай бұрын
Sure, will get it sent over.
@CeciliaSaguet
@CeciliaSaguet Жыл бұрын
mm It wasnt clear on priority level formula... any help anyone?
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Hello Cecilia. Sorry about that. The formula for the first row of the priority column is: =IF(E10*F10=0,"",E10*F10) Simply drag it down from there.
@keishadooner7002
@keishadooner7002 3 жыл бұрын
Hi, Please can you send me the template? Thanks :)
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Sure, just send me an email and I'll get right onto it!
@vicgeorge4611
@vicgeorge4611 3 жыл бұрын
Can I have this template please?
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Sure; drop me an email via my channels about page and I'll ping it across! :)
@msharialgamdi9560
@msharialgamdi9560 Жыл бұрын
great work!!! can you send me the excel please
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Thanks. Sure, will send it over email.
@azizb9754
@azizb9754 2 жыл бұрын
Could you please send me a template pls
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hi Aziz. Sure, send me an email and I'll get it over to you
@kevinjackson5191
@kevinjackson5191 Жыл бұрын
Great video thanks.....but who on earth pronounces mitigation that way!?!?!?! :D
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Thanks, Kevin. Me by the sound of it!
@ianallen7306
@ianallen7306 Жыл бұрын
Can you please send me the excel template
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Hi Ian. Sure will get it over to you.
@midhunkrishna6562
@midhunkrishna6562 15 күн бұрын
Its good
@LeanneStLouis
@LeanneStLouis 3 жыл бұрын
Great video. Sent email for formula and template. Thanks
@ProperProjectManagement
@ProperProjectManagement 3 жыл бұрын
Sent! all the best.
@JohnsonUche-m8m
@JohnsonUche-m8m 10 ай бұрын
Please share the template with me...
@ProperProjectManagement
@ProperProjectManagement 9 ай бұрын
Sure, will get it sent over.
@shahrukhdaud7989
@shahrukhdaud7989 Жыл бұрын
👍👍👍👍
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Thank you
@GertRich
@GertRich Жыл бұрын
Great piece of demonstration. Kindly share this template with me via email
@ProperProjectManagement
@ProperProjectManagement Жыл бұрын
Will do
@dracoac4227
@dracoac4227 2 жыл бұрын
Hey, can I please have a copy of this template?
@ProperProjectManagement
@ProperProjectManagement 2 жыл бұрын
Hello. Sure, just send an email so I can get it to you. Thanks
How To Create A Project Plan In Excel
17:05
Proper Project Management
Рет қаралды 301 М.
Risk Register Example - All You Need to Know About It
17:38
IT Project Managers
Рет қаралды 43 М.
When you have a very capricious child 😂😘👍
00:16
Like Asiya
Рет қаралды 18 МЛН
How to treat Acne💉
00:31
ISSEI / いっせい
Рет қаралды 108 МЛН
What to Put in Your Risk Register (Risk Log)
11:08
Online PM Courses - Mike Clayton
Рет қаралды 66 М.
7 Steps to Write Standard Operating Procedures that ACTUALLY Work
15:21
Layla at ProcessDriven
Рет қаралды 79 М.
How to Make a Risk Assessment Matrix in Excel
16:10
David McLachlan
Рет қаралды 541 М.
What Is a Cybersecurity Risk Assessment (and HOW TO DO THEM!)
13:16
Gerald Auger, PhD - Simply Cyber
Рет қаралды 46 М.
How To Create A RACI Matrix In Excel - Step By Step - Or Get My Free Template!
19:01
Proper Project Management
Рет қаралды 27 М.
A Project Manager's Guide to Creating a Risk Register
10:35
Adriana Girdler
Рет қаралды 34 М.
Risk Assessment Matrix in Excel in 15 Minutes!
14:16
Alvin the PM - Become a Certified Project Manager
Рет қаралды 64 М.
When you have a very capricious child 😂😘👍
00:16
Like Asiya
Рет қаралды 18 МЛН