Can you share the details of the bar arrangement according to the pile cap dimension?... lik e bottom first u bar in longer dimension or shorter?
@structuralguide3 ай бұрын
We can have the critical bar at the bottom layer. That can be done. Since we tie the rebar, and is within the concrete, the necessary restrain is there for tension bars. You may also detail like a beam manner that distribution bare acts like a link too. In that case, reduction of the effective depth shall be considered in the design.
@aneeshaunni15543 ай бұрын
@@structuralguide thank you somuch
@binayaksamanta863 Жыл бұрын
Please make a video on 3 pile design
@structuralguide Жыл бұрын
Will do it soon
@rashminsajeev2893 Жыл бұрын
Sir , how the Vc value 0.75 found out from table 3.8 bs 8110 using this v value?
@structuralguide Жыл бұрын
Vc is obtained based on the 100As/bd and effective depth.
@rashminsajeev2893 Жыл бұрын
Sir, In our case, 100 As /bd = .72 and eff. Depth is > 400 . Couldnt find a value 0.75 (Vc) corresponfing to these data frm table 3.8?
@structuralguide Жыл бұрын
Now it is clear what you are asking. The Vc that I have considered in the example is some approximation. The correct value needs to be obtained form the table based on the 100As/bd and as per effective depth.
@sudeepta286926 күн бұрын
How to decide pile nos
@sudeepta286926 күн бұрын
For 3000 kn only 2piles required how?
@structuralguide25 күн бұрын
@@sudeepta2869 The Number of piles required depends on the pile capacity (structural and geotechnical)
@fathimathangal1913 Жыл бұрын
Can u pls make 10:45 clear
@structuralguide Жыл бұрын
We have to maintain the spacing of the pile to design the pile cap with the truss method. When the spacing of the piles is more, we have to use the bending theory; calculate the bending and shear and design like a beam.
@fathimathangal1913 Жыл бұрын
At 14:52 how is the area just the effective depth, pls male that clear
@structuralguide Жыл бұрын
Area, here means the b x d b - width d - effective depth